Project

General

Profile

Taking pedestal runs » History » Version 5

« Previous - Version 5/16 (diff) - Next » - Current version
Gabriel Santucci, 02/08/2016 06:25 PM


Taking pedestal runs

Once a shift, take a pedestal run. To do this, run the following after the DAQ has been terminated.
  • source ~/pedestals/pedestal_run.sh
No online monitoring will be generated for a pedestal run. The output files can be found here:
  • /data/lbnedaq/scratch/santucci/pedestalruns

Validating the run

Once the run is finished, run the validation script to verify if the plots look ok:
  • source ~/pedestals/validate_run.sh