Project

General

Profile

Bug #23972

Updated by Kyle Knoepfel 4 months ago

I am trying to run my art module in multithreaded mode using the following format in my configuration file to set the number of threads and schedules:

<pre>
scheduler : {

num_schedules : 5

num_threads : 5

}
</pre>


My job runs with the default number of each, specifically 1. When I run the job with the specification "-j 5" on the command line, the job runs as expected with 5 threads/schedules.

Back