# Project Tracker Status Priority Subject Assignee Updated
14831 uBooNE Production Production Request New Urgent MCC7 in time CORSIKA samples 12/16/2016 09:52 AM
14771 uBooNE Production Production Request Accepted Normal single e and photon samples for hit resolution studies Joel Mousseau 12/07/2016 08:28 AM
14790 uBooNE Production Production Request Feedback High ana trees for in time sample Adam Lister 12/15/2016 09:01 AM
11399 Cosmogenics Task Assigned Urgent List of configurations 01/25/2016 04:42 PM
8572 ANNIE1-mechanical-design Task New Urgent Fermilab approval for tank purchase 06/09/2015 02:01 AM
11402 Cosmogenics Task New High MC samples 01/11/2016 10:28 PM
18556 ANNIE2-mechanical-design Task New High Design of the new tank lid 01/25/2018 07:34 AM
19390 dune-artdaq Task New High Stop commands not processed by some fraction of the artdaq processes 03/15/2018 05:19 PM
20317 NoSQL LDRD Task Resolved High Restructure the server to expose only single TCP port 07/16/2018 04:29 PM
23552 sbndaq Task New High Documentation to support shifters running the DAQ during the cooldown/filling 11/06/2019 09:31 AM
11349 ANNIE1-electronics-design Task New High DAQ board reader TOOL 01/15/2016 08:05 AM
17913 Scientific Data Management Task Assigned High test staging latency feature introduced in 4.2.2 FileRouter 10/16/2017 10:29 AM
19389 dune-artdaq Task New High clogged situation in a Dispatcher 03/15/2018 05:19 PM
11080 ANNIE1-Assembly Task New Normal Construction of Inner Structure 01/12/2016 02:29 AM
11078 ANNIE1-Assembly Task New Normal Development of PMT installation procedure 04/06/2016 11:05 PM
11092 ANNIE1-mechanical-design Task New Normal Finish design of PMT holders 01/22/2016 08:51 AM
11093 ANNIE1-Assembly Task New Normal Modify top of tank, add round offs 01/12/2016 02:36 PM
11082 ANNIE1-Assembly Task New Normal Access Platform: construction and installation 04/06/2016 11:11 PM
11666 uBooNE Detector Physics Task New Normal Measure the ADC to charge conversion 02/08/2016 11:33 AM
10526 uBooNE Detector Physics Task New Normal Laser+Cosmics calibration methods 02/08/2016 10:51 AM
11079 ANNIE1-Assembly Task New Normal Spot testing of PMTs 04/06/2016 11:05 PM
18566 ANNIE2-mechanical-design Task New Normal Finalize design of timing calibration system 01/25/2018 07:39 AM
20681 adinstbpm Task New Normal bpmd.conf for BBPL15 08/26/2018 02:41 PM
22936 AI-for-Accelerators Task New Normal Finalize list of required devices and catalogers 07/12/2019 03:19 PM
20682 adinstbpm Task New Normal bpmd.config for BBPL15 08/26/2018 02:41 PM