# Project Tracker Status Priority Subject Assignee Updated
14831 uBooNE Production Production Request New Urgent MCC7 in time CORSIKA samples 12/16/2016 09:52 AM
14790 uBooNE Production Production Request Feedback High ana trees for in time sample Adam Lister 12/15/2016 09:01 AM
14771 uBooNE Production Production Request Accepted Normal single e and photon samples for hit resolution studies Joel Mousseau 12/07/2016 08:28 AM
25582 dunetpc Task Work in progress Normal Configure dataprep for Iceberg run 5 David Adams 03/03/2021 02:27 PM
25479 dunetpc Task New Normal Understand channel-to-channel response variation in data-driven dE/dx David Adams 03/01/2021 11:29 AM
22198 dunetpc Task New Normal Address various issues in protodune-sp reconstruction 02/25/2021 09:18 AM
25409 dunetpc Task Work in progress Normal Changes in dataprep data model David Adams 02/22/2021 08:25 AM
9179 Retire SLF5 Task Resolved Normal reshoot cmslpc28-35, cmslpc42 Anthony Tiradani 02/16/2021 09:04 AM
25495 CCQENu Management Task New Normal Profiling code , memory and CPU Andrew Olivier 02/09/2021 10:21 AM
21912 LE Linac LLRF Task Resolved Normal Support efforts to move LE Linac LLRF to kernel 6.4 Ed Cullerton 02/04/2021 12:45 PM
25087 Runs Task New Normal DR1_Run_9 02/01/2021 03:52 PM
24734 llrf-HWR-fe-software Task Resolved Normal Documenting recent software changes for resonance control and other upgrades Shrividhyaa Sankar Raman 01/27/2021 12:07 PM
24578 llrf-HWR-fe-software Task Resolved High ACNET Connection Shrividhyaa Sankar Raman 01/27/2021 12:05 PM
23590 PIP-II IT HWR Task Resolved Normal SSR1 Testing Shrividhyaa Sankar Raman 01/27/2021 12:00 PM
23589 PIP-II IT HWR Task Resolved Normal HWR Software Development and Testing Shrividhyaa Sankar Raman 01/27/2021 11:59 AM
23586 PIP-II IT HWR Task Resolved High Buy connectors and for connections between HWR and Resonance control chassis. Shrividhyaa Sankar Raman 01/27/2021 11:58 AM
24630 PIP II IT SSR1 Task Work in progress Normal SSR1 Resonance Control chassis Daniel Klepec 01/27/2021 11:56 AM
25327 PIP II IT SSR1 Task Resolved Normal SSR1 Resonance Controller Installation Daniel Klepec 01/27/2021 11:54 AM
24874 PIP II IT SSR1 Task Resolved Normal PIP2IT SSR1 Resonance Controller Voltage Distribution Board Repair Daniel Klepec 01/27/2021 11:52 AM
24895 llrf-ssr1-fe-software-acnet Task Resolved Normal Worked with Mr Nicklaus on spreadsheets. 01/25/2021 12:18 PM
25407 MongoDB Task New Normal Do some research on how multitenancy applies to MongoDB 01/15/2021 02:58 PM
24877 Runs Task New Normal DR1_Run_8 01/05/2021 12:29 PM
25193 Superconducting Quantum Computing Task New Normal DR2 cooldown test 11/13/2020 09:05 AM
25153 LBL LLRF System Task New Normal LBL LLRF system installation in SSR1 Daniel Klepec 11/03/2020 09:37 AM
25131 PIP-II IT HWR Task New Normal ACNET Parameters when changed must set off an alarm to indicate values have been changed. 10/27/2020 09:25 AM
25083 MongoDB Task Resolved High Remote authenticated mongodb access on dune-apa-dbedv vms Natalia Ratnikova 10/16/2020 01:52 PM
25067 MongoDB Task Resolved Normal Test install from tarball Natalia Ratnikova 10/12/2020 06:02 PM
24853 ANL Up/Down Converter Builds 2020/2021 Task New Normal Quotes and carts needed for Build of ANL Up/Downconverters 10/01/2020 10:16 AM
24741 PIP II IT SSR1 Task New Normal Get LV installed on needed consoles John Dusatko 09/05/2020 11:30 AM
24896 PIP-II IT HWR Task New Normal HWR GDR Mode Turn-On procedure and sotware changes Shrividhyaa Sankar Raman 09/01/2020 03:07 PM
24775 PIP-II IT HWR Task New Normal Priorities for HWR 08/31/2020 11:41 AM
24880 PIP-II IT HWR Task New Normal Data capture of Frequency error data for HWR Cavities John Dusatko 08/28/2020 05:18 AM
24825 Booster LLRF PIP-II Integration Task Assigned Normal Timing System / MEBT Chppoer / Booster LLRF block diagram and timeline development Ed Cullerton 08/26/2020 03:39 PM
24754 PIP-II IT HWR Task Resolved Urgent Remove & Repair HWR Pressure loop Signal conditioning chassis Daniel Klepec 08/13/2020 01:28 PM
24772 PIP-II IT HWR Task Resolved Normal Cavity 6 drive cable Daniel Klepec 08/13/2020 01:23 PM
24523 PIP-II IT HWR Task Resolved Normal HWR 8 Channel Signal Conditioning Chassis Daniel Klepec 08/07/2020 03:24 PM
24597 llrf-hwr-2cavity-firmware Task Work in progress Normal Resonance controller needs diagnostics Philip Varghese 07/10/2020 11:56 AM
24603 Main Injector and MRF Task New Normal New Chassis for MILLRF - RF filters and other loose components in MI John Dusatko 07/07/2020 09:51 AM
24587 llrf-HWR-fe-software Task Resolved High HWR start trigger cable termination Daniel Klepec 07/02/2020 08:24 AM
24585 llrf-HWR-fe-software Task Resolved High HWR resonance control pressure set button is broken Daniel Klepec 07/02/2020 08:04 AM
24584 llrf-HWR-fe-software Task New Urgent HWR startup procedure Philip Varghese 07/01/2020 09:59 AM
24534 PIP-II IT HWR Task New Normal HWR LLRF System Testing Philip Varghese 06/19/2020 02:16 PM
24446 NOvA Production Task New Normal H5s Lily Asquith 05/21/2020 06:03 AM
24447 NOvA Production Task New Normal ND FHC NOMINAL Lily Asquith 05/21/2020 06:03 AM
24422 dunetpc Task New Normal CRP sorting for ProtoDUNE DP geometry with vertical drift Vyacheslav Galymov 05/14/2020 03:45 PM
24304 BOE and RLS Task New Normal Master BOE 04/30/2020 03:17 PM
24209 Runs Task New Normal DR1_Run_7 04/08/2020 03:29 PM
24276 Components DB Task Accepted Normal Load experimenters from FERRY 04/08/2020 12:22 PM
24275 Components DB Task Accepted Normal Create Security Class/Methods 04/08/2020 12:22 PM
24281 Components DB Task Accepted Normal Web Forms: Security 04/08/2020 12:22 PM
(1-50/4634) Per page: 25, 50, 100, 5000