Project

General

Profile

Issues

Filters

Apply Clear

# Project Tracker Status Priority Subject Assignee Updated
14831 uBooNE Production Production Request New Urgent MCC7 in time CORSIKA samples 12/16/2016 09:52 AM
14790 uBooNE Production Production Request Feedback High ana trees for in time sample Adam Lister 12/15/2016 09:01 AM
14771 uBooNE Production Production Request Accepted Normal single e and photon samples for hit resolution studies Joel Mousseau 12/07/2016 08:28 AM
8572 ANNIE1-mechanical-design Task New Urgent Fermilab approval for tank purchase 06/09/2015 02:01 AM
24584 llrf-HWR-fe-software Task New Urgent HWR startup procedure Philip Varghese 07/01/2020 09:59 AM
16055 Neutrino Division LArTPC Test Stands Task New High LAr Vacuum Jacket Transfer Line Kathrine Cipriano 04/03/2017 02:12 PM
23541 sbndaq Task New High Verify ICARUS PMT readout configuration and test Animesh Chatterjee 11/06/2019 09:07 AM
23552 sbndaq Task New High Documentation to support shifters running the DAQ during the cooldown/filling 11/06/2019 09:31 AM
18556 ANNIE2-mechanical-design Task New High Design of the new tank lid 01/25/2018 07:34 AM
19389 dune-artdaq Task New High clogged situation in a Dispatcher 03/15/2018 05:19 PM
19392 dune-artdaq Task New High problem getting more than one EventBuilder John Freeman 03/15/2018 05:20 PM
11349 ANNIE1-electronics-design Task New High DAQ board reader TOOL 01/15/2016 08:05 AM
11402 Cosmogenics Task New High MC samples 01/11/2016 10:28 PM
16443 IFBeam Task New High Python 3 Conversion Vladimir Podstavkov 11/30/2017 11:30 AM
23586 PIP-II IT HWR Task New High Buy connectors and for connections between HWR and Resonance control chassis. Shrividhyaa Sankar Raman 11/12/2019 02:33 PM
15354 gm2calo Task New High Intra-fill SiPM gain correction, inter-fill SiPM gain correction, laser fluctuation corrections Anna Driutti 01/28/2017 02:46 PM
18553 ANNIE2-mechanical-design Task New High Finalize design concept of inner structure Matthew Wetstein 06/13/2018 01:28 AM
19390 dune-artdaq Task New High Stop commands not processed by some fraction of the artdaq processes 03/15/2018 05:19 PM
23588 PIP-II IT HWR Task New High Develop the requirements traceability spreadsheet Brian Chase 11/12/2019 02:45 PM
23959 PIP-II IT HWR Task New High HWR Resonance control system Philip Varghese 02/16/2020 11:05 PM
11670 uBooNE Detector Physics Task New Normal Hypothesize the Bragg peak and scale measured charge to match 02/08/2016 11:42 AM
18567 ANNIE2-mechanical-design Task New Normal Finalize design of source calibration system 12/14/2017 01:33 PM
11676 uBooNE Detector Physics Task New Normal Understand the double-exponential or exponential behavior 02/11/2016 11:31 AM
11088 ANNIE1-Commissioning Task New Normal Detector commissioning with water 01/25/2018 07:21 AM
17401 DES Collaboration Tools Task New Normal Release with changes requested by Klaus in the past year. Margherita Vittone Wiersma 08/08/2017 09:47 AM
11666 uBooNE Detector Physics Task New Normal Measure the ADC to charge conversion 02/08/2016 11:33 AM
11082 ANNIE1-Assembly Task New Normal Access Platform: construction and installation 04/06/2016 11:11 PM
11080 ANNIE1-Assembly Task New Normal Construction of Inner Structure 01/12/2016 02:29 AM
11667 uBooNE Detector Physics Task New Normal Get ADC to charge conversion from crossing tracks 02/08/2016 11:35 AM
8667 VOMS Task New Normal Test voms3.fnal.gov Nicholas Peregonow 07/02/2015 10:19 AM
11078 ANNIE1-Assembly Task New Normal Development of PMT installation procedure 04/06/2016 11:05 PM
18566 ANNIE2-mechanical-design Task New Normal Finalize design of timing calibration system 01/25/2018 07:39 AM
10203 ANNIE1-mechanical-design Task New Normal Determine placement of water pump Carrie McGivern 01/12/2016 02:33 AM
18568 ANNIE2-mechanical-design Task New Normal Finalize design of transparency calibration system 12/14/2017 01:34 PM
19396 dune-artdaq Task New Normal Update the standard dune-artdaq instance to use artdaq v3_00_03a 03/15/2018 04:07 PM
8576 ANNIE1-Assembly Task New Normal Assembly and installation of PMT modules 04/06/2016 11:06 PM
11669 uBooNE Detector Physics Task New Normal Identify stopping muons 03/16/2016 02:17 PM
8492 Eroica Production Task New Normal MC Cal Stage 04/29/2015 10:25 AM
8695 DCSO glideinWMS Task New Normal Set up schedd Krista Larson 06/05/2015 03:07 PM
20682 adinstbpm Task New Normal bpmd.config for BBPL15 08/26/2018 02:41 PM
11079 ANNIE1-Assembly Task New Normal Spot testing of PMTs 04/06/2016 11:05 PM
11084 ANNIE1-Assembly Task New Normal Construction of NCV 04/06/2016 11:07 PM
11220 gm2planning Task New Normal Calorimeter behavior validated Aaron Fienberg 12/18/2015 12:42 AM
8677 VOMS Task New Normal ECF: Request voms1.fnal.gov server from ecf-ssi Lisa Giacchetti 07/02/2015 10:19 AM
8678 VOMS Task New Normal ECF: Request voms2.fnal.gov server from ecf-ssi Nicholas Peregonow 07/02/2015 10:19 AM
8575 ANNIE1-Planning Task New Normal Contact Stephen Geer about June PAC meeting 05/21/2015 10:07 AM
20681 adinstbpm Task New Normal bpmd.conf for BBPL15 08/26/2018 02:41 PM
10198 QSS Task New Normal Count Number of Crossings Nicolas Ponieman 09/20/2015 02:00 PM
11092 ANNIE1-mechanical-design Task New Normal Finish design of PMT holders 01/22/2016 08:51 AM
11099 ANNIE1-Assembly Task New Normal Installation of Forward Veto Cabling 04/06/2016 11:07 PM
(1-50/4619) Per page: 25, 50, 100, 5000

Also available in: Atom CSV PDF