Project

General

Profile

Issues

Filters

Apply Clear

# Project Tracker Status Priority Subject Assignee Updated
14831 uBooNE Production Production Request New Urgent MCC7 in time CORSIKA samples 12/16/2016 09:52 AM
8572 ANNIE1-mechanical-design Task New Urgent Fermilab approval for tank purchase 06/09/2015 02:01 AM
11399 Cosmogenics Task Assigned Urgent List of configurations 01/25/2016 04:42 PM
23552 sbndaq Task New High Documentation to support shifters running the DAQ during the cooldown/filling 11/06/2019 09:31 AM
18556 ANNIE2-mechanical-design Task New High Design of the new tank lid 01/25/2018 07:34 AM
11402 Cosmogenics Task New High MC samples 01/11/2016 10:28 PM
19390 dune-artdaq Task New High Stop commands not processed by some fraction of the artdaq processes 03/15/2018 05:19 PM
11349 ANNIE1-electronics-design Task New High DAQ board reader TOOL 01/15/2016 08:05 AM
19389 dune-artdaq Task New High clogged situation in a Dispatcher 03/15/2018 05:19 PM
17913 Scientific Data Management Task Assigned High test staging latency feature introduced in 4.2.2 FileRouter 10/16/2017 10:29 AM
20317 NoSQL LDRD Task Resolved High Restructure the server to expose only single TCP port 07/16/2018 04:29 PM
11670 uBooNE Detector Physics Task New Normal Hypothesize the Bragg peak and scale measured charge to match 02/08/2016 11:42 AM
8469 Eroica Production Task New Normal MC Minos Stage 04/28/2015 08:44 PM
8465 Eroica Production Task New Normal Data Cal Stage 04/28/2015 08:38 PM
19396 dune-artdaq Task New Normal Update the standard dune-artdaq instance to use artdaq v3_00_03a 03/15/2018 04:07 PM
11673 uBooNE Detector Physics Task New Normal Apply lifetime correction to hits 02/08/2016 11:41 AM
8466 Eroica Production Task New Normal Create Overlay Playlist 04/28/2015 08:38 PM
8471 Eroica Production Task New Normal Data Reco Stage 04/28/2015 08:54 PM
8492 Eroica Production Task New Normal MC Cal Stage 04/29/2015 10:25 AM
8853 ANNIE1-mechanical-design Task New Normal Water system shipped to FNAL for storage 12/06/2015 10:24 AM
18567 ANNIE2-mechanical-design Task New Normal Finalize design of source calibration system 12/14/2017 01:33 PM
18160 mu2e_ci Task New Normal Documentation for the mu2e_ci 12/18/2017 05:48 PM
11669 uBooNE Detector Physics Task New Normal Identify stopping muons 03/16/2016 02:17 PM
8575 ANNIE1-Planning Task New Normal Contact Stephen Geer about June PAC meeting 05/21/2015 10:07 AM
8576 ANNIE1-Assembly Task New Normal Assembly and installation of PMT modules 04/06/2016 11:06 PM
11088 ANNIE1-Commissioning Task New Normal Detector commissioning with water 01/25/2018 07:21 AM
11668 uBooNE Detector Physics Task New Normal Get ADC to charge conversion from MuCS tracks 02/08/2016 11:36 AM
10526 uBooNE Detector Physics Task New Normal Laser+Cosmics calibration methods 02/08/2016 10:51 AM
11671 uBooNE Detector Physics Task New Normal Look at data from different fields 02/08/2016 11:42 AM
11675 uBooNE Detector Physics Task New Normal Apply space charge correction if necessary 02/08/2016 11:44 AM
18569 ANNIE2-mechanical-design Task New Normal Revise Specification Doc. 06/12/2018 09:18 AM
8854 ANNIE1-mechanical-design Task New Normal Ship the muon veto structure 08/05/2015 11:47 PM
11674 uBooNE Detector Physics Task New Normal Look at hit width as a function of time 02/08/2016 11:43 AM
11078 ANNIE1-Assembly Task New Normal Development of PMT installation procedure 04/06/2016 11:05 PM
11089 ANNIE1-Assembly Task New Normal Set up water skid and recirculation system 01/25/2018 07:20 AM
11082 ANNIE1-Assembly Task New Normal Access Platform: construction and installation 04/06/2016 11:11 PM
11093 ANNIE1-Assembly Task New Normal Modify top of tank, add round offs 01/12/2016 02:36 PM
18568 ANNIE2-mechanical-design Task New Normal Finalize design of transparency calibration system 12/14/2017 01:34 PM
11084 ANNIE1-Assembly Task New Normal Construction of NCV 04/06/2016 11:07 PM
11095 ANNIE1-Assembly Task New Normal Populate Crates in Hall 04/06/2016 11:06 PM
20682 adinstbpm Task New Normal bpmd.config for BBPL15 08/26/2018 02:41 PM
11079 ANNIE1-Assembly Task New Normal Spot testing of PMTs 04/06/2016 11:05 PM
11080 ANNIE1-Assembly Task New Normal Construction of Inner Structure 01/12/2016 02:29 AM
11667 uBooNE Detector Physics Task New Normal Get ADC to charge conversion from crossing tracks 02/08/2016 11:35 AM
21024 Production Operations Management Service (POMS) Task New Normal wrapup tasks: is doing individual queries for campaign_stage_snapshots and job_type_snapshots, should joinedload() them... 10/04/2018 09:59 AM
25131 PIP-II IT HWR Task New Normal ACNET Parameters when changed must set off an alarm to indicate values have been changed. 10/27/2020 09:25 AM
20681 adinstbpm Task New Normal bpmd.conf for BBPL15 08/26/2018 02:41 PM
18566 ANNIE2-mechanical-design Task New Normal Finalize design of timing calibration system 01/25/2018 07:39 AM
11092 ANNIE1-mechanical-design Task New Normal Finish design of PMT holders 01/22/2016 08:51 AM
8467 Eroica Production Task New Normal MC Genie Stage 04/28/2015 08:44 PM
(1-50/4638) Per page: 25, 50, 100, 5000

Also available in: Atom CSV PDF