Project

General

Profile

Unassigned Issues

Apply Clear

# Project Tracker Status Subject Author Updated
  AI-for-Accelerators 39 Collapse all/Expand all
22933 AI-for-Accelerators Task New Investigate deployment to PC for "slow" inference and training Gabriel Perdue 07/12/2019 03:17 PM
22923 AI-for-Accelerators Task New Establish a safe and ORC-allowed work area with a PC for slow interface with the current control system. Gabriel Perdue 07/11/2019 01:42 PM
22791 AI-for-Accelerators Task New Create list of initial set of devices and dataloggers (ACNET) Gabriel Perdue 06/20/2019 04:42 PM
22934 AI-for-Accelerators Task New Implement agent based on training to the current system with historical data on a PC (board?) in the hall that can communicate with the real GMPS Gabriel Perdue 07/12/2019 03:18 PM
22842 AI-for-Accelerators Task New Design ACNET input system for the board Gabriel Perdue 06/28/2019 04:39 PM
22841 AI-for-Accelerators Task New Understand input bandwidth requirements Gabriel Perdue 06/28/2019 04:39 PM
22936 AI-for-Accelerators Task New Finalize list of required devices and catalogers Gabriel Perdue 07/12/2019 03:19 PM
22844 AI-for-Accelerators Task New Understand required number of ops / computations / resources (what are the metrics and how do we decide?) Gabriel Perdue 06/28/2019 04:40 PM
22801 AI-for-Accelerators Task New Investigate TF-Agents, home-brew systems Gabriel Perdue 06/21/2019 11:43 AM
22946 AI-for-Accelerators Task New Demonstrate dynamic loading of weights without re-flashing the FPGA? Gabriel Perdue 07/15/2019 04:21 PM
  ANNIE 2 Collapse all/Expand all
24079 ANNIE Necessary Maintenance New BNB Downtime Emrah Tiras 02/21/2020 10:57 AM
24080 ANNIE Necessary Maintenance New BNB Downtime Emrah Tiras 02/21/2020 11:05 AM
  ANNIE1-Assembly 21 Collapse all/Expand all
11097 ANNIE1-Assembly Bug New Finalize crates and racks Matthew Wetstein 04/06/2016 11:11 PM
11096 ANNIE1-Assembly Milestone New Prelim ORC inspection Matthew Wetstein 04/06/2016 11:12 PM
8637 ANNIE1-Assembly Milestone New Installation of plastic liner Matthew Wetstein 04/06/2016 11:07 PM
11094 ANNIE1-Assembly Milestone New Cut top of tank Matthew Wetstein 12/06/2015 12:08 PM
11086 ANNIE1-Assembly Milestone New Cabling of the installed tank Matthew Wetstein 04/06/2016 11:08 PM
11083 ANNIE1-Assembly Milestone New Lower inner structure into tank at ANNIE Hall Matthew Wetstein 04/06/2016 11:11 PM
8631 ANNIE1-Assembly Milestone New Lowering the tank in ANNIE Hall Matthew Wetstein 04/06/2016 11:12 PM
11085 ANNIE1-Assembly Milestone New NCV shipped to FNAL Matthew Wetstein 04/06/2016 11:08 PM
11099 ANNIE1-Assembly Task New Installation of Forward Veto Cabling Matthew Wetstein 04/06/2016 11:07 PM
11079 ANNIE1-Assembly Task New Spot testing of PMTs Matthew Wetstein 04/06/2016 11:05 PM
11081 ANNIE1-Assembly Task New Practice lower inner structure into tank Matthew Wetstein 04/06/2016 11:06 PM
11089 ANNIE1-Assembly Task New Set up water skid and recirculation system Matthew Wetstein 01/25/2018 07:20 AM
11078 ANNIE1-Assembly Task New Development of PMT installation procedure Matthew Wetstein 04/06/2016 11:05 PM
(101-125/3498) Per page: 25, 50, 100, 5000

Also available in: Atom CSV PDF