15476 ANNIE Task Resolved High Remove from persistent runs <= 247 Arthur Kreymer 08/31/2017 08:37 AM
15475 ANNIE Task Resolved High Remove v2data runs converted to v5data Arthur Kreymer 08/31/2017 08:39 AM
14890 ANNIE Task Resolved High remove older files from /pnfs/annie/persistent/raw Arthur Kreymer 01/05/2017 09:41 AM
13885 ANNIE Task Work in progress High Move raw and processed data to per-run directories Steven Gardiner 01/25/2018 07:26 AM
11099 ANNIE1-Assembly Task New Normal Installation of Forward Veto Cabling 04/06/2016 11:07 PM
11097 ANNIE1-Assembly Bug New Normal Finalize crates and racks 04/06/2016 11:11 PM
11096 ANNIE1-Assembly Milestone New Normal Prelim ORC inspection 04/06/2016 11:12 PM
11095 ANNIE1-Assembly Task New Normal Populate Crates in Hall 04/06/2016 11:06 PM
11094 ANNIE1-Assembly Milestone New Normal Cut top of tank 12/06/2015 12:08 PM
11093 ANNIE1-Assembly Task New Normal Modify top of tank, add round offs 01/12/2016 02:36 PM
11090 ANNIE1-Assembly Task New Normal PMT cabling and shipping 04/06/2016 11:05 PM
11089 ANNIE1-Assembly Task New Normal Set up water skid and recirculation system 01/25/2018 07:20 AM
11086 ANNIE1-Assembly Milestone New Normal Cabling of the installed tank 04/06/2016 11:08 PM
11085 ANNIE1-Assembly Milestone New Normal NCV shipped to FNAL 04/06/2016 11:08 PM
11084 ANNIE1-Assembly Task New Normal Construction of NCV 04/06/2016 11:07 PM
11083 ANNIE1-Assembly Milestone New Normal Lower inner structure into tank at ANNIE Hall 04/06/2016 11:11 PM
11082 ANNIE1-Assembly Task New Normal Access Platform: construction and installation 04/06/2016 11:11 PM
11081 ANNIE1-Assembly Task New Normal Practice lower inner structure into tank 04/06/2016 11:06 PM
11080 ANNIE1-Assembly Task New Normal Construction of Inner Structure 01/12/2016 02:29 AM
11079 ANNIE1-Assembly Task New Normal Spot testing of PMTs 04/06/2016 11:05 PM
11078 ANNIE1-Assembly Task New Normal Development of PMT installation procedure 04/06/2016 11:05 PM
8637 ANNIE1-Assembly Milestone New Normal Installation of plastic liner 04/06/2016 11:07 PM
8631 ANNIE1-Assembly Milestone New Normal Lowering the tank in ANNIE Hall 04/06/2016 11:12 PM
8577 ANNIE1-Assembly Task New Normal Water fill 01/25/2018 07:11 AM
8576 ANNIE1-Assembly Task New Normal Assembly and installation of PMT modules 04/06/2016 11:06 PM
11098 ANNIE1-Commissioning Milestone New Normal Final ORC review 01/25/2018 07:20 AM
11088 ANNIE1-Commissioning Task New Normal Detector commissioning with water 01/25/2018 07:21 AM
11087 ANNIE1-Commissioning Task New Normal DAQ commissioning 01/25/2018 07:10 AM
8636 ANNIE1-Commissioning Task New Normal Installation and commissioning of NCV 01/25/2018 07:11 AM
8600 ANNIE1-Commissioning Task New Normal Dark commissioning of PMTs in ANNIE Hall (no water) 01/25/2018 07:10 AM
8599 ANNIE1-Commissioning Task New Normal Begin Run1 data taking 01/25/2018 07:11 AM
11351 ANNIE1-electronics-design Task Assigned Normal DAQ output TOOL Benjamin Richards 01/15/2016 08:03 AM
11349 ANNIE1-electronics-design Task New High DAQ board reader TOOL 01/15/2016 08:05 AM
11348 ANNIE1-electronics-design Task New Normal Postgress setup 01/05/2016 08:22 AM
11347 ANNIE1-electronics-design Task New Normal DAQ monitoring system Benjamin Richards 01/05/2016 08:21 AM
11346 ANNIE1-electronics-design Task Resolved Normal DAQ Control systems Benjamin Richards 01/15/2016 08:07 AM
11345 ANNIE1-electronics-design Task New Normal DAQ Serialisation 01/05/2016 08:17 AM
11344 ANNIE1-electronics-design Task Resolved Normal DAQ Jason (lite) messgae passing Benjamin Richards 01/15/2016 08:09 AM
11343 ANNIE1-electronics-design Task Resolved Normal DAQ Bool functions /status reporting Benjamin Richards 01/15/2016 08:08 AM
11342 ANNIE1-electronics-design Task Resolved Normal DAQ ZMQ/multicast integration Benjamin Richards 01/15/2016 08:07 AM
10543 ANNIE1-electronics-design Task Resolved Normal Check availability of local timing references Jonathan Eisch 11/02/2015 01:31 PM
10535 ANNIE1-electronics-design Task New Normal Select and buy a suitable GPS receiver Jonathan Eisch 01/25/2018 07:16 AM
10534 ANNIE1-electronics-design Task Assigned Normal Determine GPS antenna location at ANNIE Hall Jonathan Eisch 01/25/2018 07:17 AM
10533 ANNIE1-electronics-design Task Assigned Normal Determine the suitability of GPS timing reference Jonathan Eisch 01/25/2018 07:17 AM
10532 ANNIE1-electronics-design Task Assigned Normal Select timing sources Jonathan Eisch 01/25/2018 07:17 AM
10530 ANNIE1-electronics-design Task Assigned Normal Timing distribution system Jonathan Eisch 01/25/2018 07:17 AM
10512 ANNIE1-electronics-design Task New Normal Test final pickoff/splitter 04/06/2016 11:14 PM
10510 ANNIE1-electronics-design Task Assigned Normal Mount pickoff/splitter pcb in enclosure, solder wires to bulkhead connectors Jonathan Eisch 04/06/2016 11:09 PM
10509 ANNIE1-electronics-design Task Assigned Normal Attach bulkhead connectors and pcb mounting hardware Jonathan Eisch 04/06/2016 11:13 PM
10470 ANNIE1-electronics-design Task Resolved Normal Machine pickoff/splitter enclosure Jonathan Eisch 01/12/2016 03:05 PM