Project

General

Profile

Issues

Filters

Apply Clear

# Project Tracker Status Priority Subject Assignee Updated
22908 Spack Infrastructure Task New Normal Install Development sam-web, station via spack 07/10/2019 01:22 PM
8505 Eroica Production Task New Normal Data Cal Stage 04/29/2015 10:28 AM
8499 Eroica Production Task New Normal MC Genie Stage 04/28/2015 09:33 PM
8633 ANNIE1-Staging Task New Normal MRD + veto system testing 04/06/2016 11:09 PM
18437 IFBeam Task New Normal Redo the directory structure of collectors. 11/30/2017 11:30 AM
16590 VME Intensity Monitor Task New Normal Verify BBM interface with Bill Marsh's test program 05/18/2017 02:52 PM
19404 dune-artdaq Task New Normal Store the Dataflow Configuration in the Run History/archive database 03/19/2018 04:14 PM
18929 ANNIE2-Assembly Task New Normal Functional test of new MRD layers 02/09/2018 09:07 AM
10512 ANNIE1-electronics-design Task New Normal Test final pickoff/splitter 04/06/2016 11:14 PM
8627 ANNIE1-MCstudies Task New Normal SciBooNE driven calculation of skyshine rates 06/04/2015 10:33 AM
13011 Simons Foundation Data Management Task New Normal Open ID Authentication 06/23/2016 02:48 PM
8510 Eroica Production Task New Normal MC Reco Stage 04/29/2015 10:30 AM
20666 adinstbpm Task New Normal TCLK-driven arm and TBT readout for IOTA 08/22/2018 09:33 PM
8494 Eroica Production Task New Normal MC Reco Stage 04/29/2015 10:25 AM
8466 Eroica Production Task New Normal Create Overlay Playlist 04/28/2015 08:38 PM
13285 ubpm Task New Normal Network connection 07/19/2016 11:40 AM
8815 ANNIE1-electronics-design Task New Normal Final Decision on MRD and veto electronics 04/06/2016 11:08 PM
18930 ANNIE2-Assembly Task New Normal In situ calibration of MRD layers 02/09/2018 09:07 AM
22836 Superconducting Quantum Computing Task New Normal spectroscopy 2.6 07/08/2019 11:54 AM
18443 IFBeam Task New Normal Data Browser & Data Access 11/30/2017 11:44 AM
11674 uBooNE Detector Physics Task New Normal Look at hit width as a function of time 02/08/2016 11:43 AM
20270 NoSQL LDRD Task New Normal User documentation 07/06/2018 10:32 AM
20574 NoSQL LDRD Task New Normal Thread-safe Striped data client 08/16/2018 02:43 PM
25087 Runs Task New Normal DR1_Run_9 01/27/2021 04:04 PM
11629 VME Intensity Monitor Task New Normal Refactor to useAD/Control's concurrency library 03/15/2016 12:20 PM
11872 LArSoft Task Accepted Normal Establish a standard way to represent particle identification results 11/16/2017 01:49 PM
14282 LArSoft Task Accepted Normal Design an interface for access of reconstructed particle hierarchy ("particle flow") information 01/09/2018 02:53 PM
20267 NoSQL LDRD Task New Normal Worker docker image 07/06/2018 10:32 AM
16293 NOvA Break Point Fitter Task New Normal Proton reconstruction 04/21/2017 08:21 PM
24853 ANL Up/Down Converter Builds 2020/2021 Task New Normal Quotes and carts needed for Build of ANL Up/Downconverters 10/01/2020 10:16 AM
8473 Eroica Production Task New Normal Data Cal Stage 04/29/2015 10:24 AM
18046 adinstbpm Task New Normal Refactor bpmcli 'dump_flash_history' command to be a CLICommand 10/26/2017 04:23 PM
8634 ANNIE1-Staging Task New Normal Order materials for PMT structure 04/06/2016 11:09 PM
8854 ANNIE1-mechanical-design Task New Normal Ship the muon veto structure 08/05/2015 11:47 PM
9927 uBooNE Detector Physics Task New Normal Identify through-going cosmics 02/22/2016 02:00 PM
8475 Eroica Production Task New Normal MC Genie Stage 04/28/2015 09:08 PM
22831 AI-for-Accelerators Task New Normal Build agent for training from historical data - mimic current algorithm 06/27/2019 04:24 PM
24895 llrf-ssr1-fe-software-acnet Task Resolved Normal Worked with Mr Nicklaus on spreadsheets. 01/25/2021 12:18 PM
21010 Production Operations Management Service (POMS) Task New Normal Documentation, etc. from uboone tutorial 10/03/2018 03:05 PM
8577 ANNIE1-Assembly Task New Normal Water fill 01/25/2018 07:11 AM
16572 VME BPM Task New Normal Put together a test stand 05/17/2017 10:38 AM
16825 Electronic Collaboration Logbook Task New Normal Support auto-posting security with certificates. (CILOGON) 08/08/2017 09:36 AM
21350 ProtoDUNE Data Management Task New Normal CERN EOS no support for Third party xrdcp offsite x.509 11/12/2018 09:20 AM
22791 AI-for-Accelerators Task New Normal Create list of initial set of devices and dataloggers (ACNET) 06/20/2019 04:42 PM
22834 AI-for-Accelerators Task New Normal Train agent, iterating on different reinforcement learning paradigms and algorithms as needed 06/27/2019 04:25 PM
9029 DCSO glideinWMS Task New Normal Jobsub - Acceptance testing 06/05/2015 03:07 PM
11345 ANNIE1-electronics-design Task New Normal DAQ Serialisation 01/05/2016 08:17 AM
22830 AI-for-Accelerators Task New Normal Develop research plan for safe agent behavior 06/27/2019 04:22 PM
8489 Eroica Production Task New Normal Data Cal Stage 04/29/2015 10:25 AM
18571 ANNIE2-mechanical-design Task New Normal Finalize design and layout of water system 01/25/2018 07:40 AM
8600 ANNIE1-Commissioning Task New Normal Dark commissioning of PMTs in ANNIE Hall (no water) 01/25/2018 07:10 AM
18440 IFBeam Task New Normal Status Page 11/30/2017 11:40 AM
17062 Recycler Mu2e Task New Normal Recycler Documents 12/20/2019 03:13 PM
19358 Production Operations Management Service (POMS) Task New Normal Sbatch/scontrol wrappers spelled jobsub_{hold,rm,release} 03/12/2018 08:40 PM
19403 dune-artdaq Task New Normal Update process and configuration document identifiers to use component names 03/15/2018 04:46 PM
8479 Eroica Production Task New Normal Data Reco Stage 04/29/2015 10:24 AM
8476 Eroica Production Task New Normal MC Cal Stage 04/29/2015 10:24 AM
11092 ANNIE1-mechanical-design Task New Normal Finish design of PMT holders 01/22/2016 08:51 AM
22907 Spack Infrastructure Task New Normal Build recipe files for SAM dependencies not already in spack 07/10/2019 01:17 PM
13038 Simons Foundation Data Management Task New Normal Deploy self-registration 06/24/2016 01:07 PM
8469 Eroica Production Task New Normal MC Minos Stage 04/28/2015 08:44 PM
8516 Eroica Production Task New Normal Create Overlay Playlist 04/29/2015 10:30 AM
8504 Eroica Production Task New Normal Minerva Playlist 7 04/29/2015 10:30 AM
20323 NoSQL LDRD Task New Normal Worker relative speed 07/16/2018 04:25 PM
13039 Simons Foundation Data Management Task New Normal Documentation 06/24/2016 01:09 PM
11099 ANNIE1-Assembly Task New Normal Installation of Forward Veto Cabling 04/06/2016 11:07 PM
22198 dunetpc Task New Normal Address various issues in protodune-sp reconstruction 10/21/2019 09:51 AM
23541 sbndaq Task New High Verify ICARUS PMT readout configuration and test Animesh Chatterjee 11/06/2019 09:07 AM
15354 gm2calo Task New High Intra-fill SiPM gain correction, inter-fill SiPM gain correction, laser fluctuation corrections Anna Driutti 01/28/2017 02:46 PM
20194 ICARUS production Task Assigned High POMS and fife_utils documentation Anna Mazzacane 06/19/2018 10:38 AM
15475 ANNIE Task Resolved High Remove v2data runs converted to v5data Arthur Kreymer 08/31/2017 08:39 AM
15476 ANNIE Task Resolved High Remove from persistent runs <= 247 Arthur Kreymer 08/31/2017 08:37 AM
14890 ANNIE Task Resolved High remove older files from /pnfs/annie/persistent/raw Arthur Kreymer 01/05/2017 09:41 AM
23588 PIP-II IT HWR Task New High Develop the requirements traceability spreadsheet Brian Chase 11/12/2019 02:45 PM
24587 llrf-HWR-fe-software Task Resolved High HWR start trigger cable termination Daniel Klepec 07/02/2020 08:24 AM
24585 llrf-HWR-fe-software Task Resolved High HWR resonance control pressure set button is broken Daniel Klepec 07/02/2020 08:04 AM
23551 sbndaq Task Resolved High Get DAQ running in control room in ROC-W Diana Patricia Mendez 02/11/2020 02:35 PM
19392 dune-artdaq Task New High problem getting more than one EventBuilder John Freeman 03/15/2018 05:20 PM
16048 Neutrino Division LArTPC Test Stands Task Work in progress High Testing Primary Relief Devices at PAB Kathrine Cipriano 04/03/2017 01:50 PM
16055 Neutrino Division LArTPC Test Stands Task New High LAr Vacuum Jacket Transfer Line Kathrine Cipriano 04/03/2017 02:12 PM
16054 Neutrino Division LArTPC Test Stands Task Work in progress High Liquid Argon Dewar at PAB Kathrine Cipriano 05/24/2017 09:52 AM
18553 ANNIE2-mechanical-design Task New High Finalize design concept of inner structure Matthew Wetstein 06/13/2018 01:28 AM
9681 DCSO Task Resolved High Get newer git for natasha_devel role so I can push to github Natalia Ratnikova 07/21/2015 05:26 PM
9784 CMS dCache Task Resolved High Prepare for downtime Aug 5th Natalia Ratnikova 08/14/2015 11:57 AM
25083 MongoDB Task Resolved High Remote authenticated mongodb access on dune-apa-dbedv vms Natalia Ratnikova 10/16/2020 01:52 PM
23959 PIP-II IT HWR Task New High HWR Resonance control system Philip Varghese 02/16/2020 11:05 PM
24578 llrf-HWR-fe-software Task Resolved High ACNET Connection Shrividhyaa Sankar Raman 01/27/2021 12:05 PM
23586 PIP-II IT HWR Task Resolved High Buy connectors and for connections between HWR and Resonance control chassis. Shrividhyaa Sankar Raman 01/27/2021 11:58 AM
22669 Production Operations Management Service (POMS) Task Resolved High Add a campaign_keywords JSON field to Campaigns Stephen White 08/01/2019 02:30 PM
13885 ANNIE Task Work in progress High Move raw and processed data to per-run directories Steven Gardiner 01/25/2018 07:26 AM
16443 IFBeam Task New High Python 3 Conversion Vladimir Podstavkov 11/30/2017 11:30 AM
18556 ANNIE2-mechanical-design Task New High Design of the new tank lid 01/25/2018 07:34 AM
19389 dune-artdaq Task New High clogged situation in a Dispatcher 03/15/2018 05:19 PM
11349 ANNIE1-electronics-design Task New High DAQ board reader TOOL 01/15/2016 08:05 AM
23552 sbndaq Task New High Documentation to support shifters running the DAQ during the cooldown/filling 11/06/2019 09:31 AM
17913 Scientific Data Management Task Assigned High test staging latency feature introduced in 4.2.2 FileRouter 10/16/2017 10:29 AM
11402 Cosmogenics Task New High MC samples 01/11/2016 10:28 PM
19390 dune-artdaq Task New High Stop commands not processed by some fraction of the artdaq processes 03/15/2018 05:19 PM
20317 NoSQL LDRD Task Resolved High Restructure the server to expose only single TCP port 07/16/2018 04:29 PM
24754 PIP-II IT HWR Task Resolved Urgent Remove & Repair HWR Pressure loop Signal conditioning chassis Daniel Klepec 08/13/2020 01:28 PM
(4501-4600/4607) Per page: 25, 50, 100, 5000

Also available in: Atom CSV PDF