# Project Tracker Status Priority Subject Assignee Updated
11666 uBooNE Detector Physics Task New Normal Measure the ADC to charge conversion 02/08/2016 11:33 AM
11629 VME Intensity Monitor Task New Normal Refactor to useAD/Control's concurrency library 03/15/2016 12:20 PM
11402 Cosmogenics Task New High MC samples 01/11/2016 10:28 PM
11399 Cosmogenics Task Assigned Urgent List of configurations 01/25/2016 04:42 PM
11349 ANNIE1-electronics-design Task New High DAQ board reader TOOL 01/15/2016 08:05 AM
11348 ANNIE1-electronics-design Task New Normal Postgress setup 01/05/2016 08:22 AM
11345 ANNIE1-electronics-design Task New Normal DAQ Serialisation 01/05/2016 08:17 AM
11100 ANNIE1-Staging Task New Normal Cables for Forward Veto 04/06/2016 11:09 PM
11099 ANNIE1-Assembly Task New Normal Installation of Forward Veto Cabling 04/06/2016 11:07 PM
11095 ANNIE1-Assembly Task New Normal Populate Crates in Hall 04/06/2016 11:06 PM
11093 ANNIE1-Assembly Task New Normal Modify top of tank, add round offs 01/12/2016 02:36 PM
11092 ANNIE1-mechanical-design Task New Normal Finish design of PMT holders 01/22/2016 08:51 AM
11090 ANNIE1-Assembly Task New Normal PMT cabling and shipping 04/06/2016 11:05 PM
11089 ANNIE1-Assembly Task New Normal Set up water skid and recirculation system 01/25/2018 07:20 AM
11088 ANNIE1-Commissioning Task New Normal Detector commissioning with water 01/25/2018 07:21 AM
11087 ANNIE1-Commissioning Task New Normal DAQ commissioning 01/25/2018 07:10 AM
11084 ANNIE1-Assembly Task New Normal Construction of NCV 04/06/2016 11:07 PM
11082 ANNIE1-Assembly Task New Normal Access Platform: construction and installation 04/06/2016 11:11 PM
11081 ANNIE1-Assembly Task New Normal Practice lower inner structure into tank 04/06/2016 11:06 PM
11080 ANNIE1-Assembly Task New Normal Construction of Inner Structure 01/12/2016 02:29 AM
11079 ANNIE1-Assembly Task New Normal Spot testing of PMTs 04/06/2016 11:05 PM
11078 ANNIE1-Assembly Task New Normal Development of PMT installation procedure 04/06/2016 11:05 PM
11076 ANNIE1-mechanical-design Task New Normal Final decision on liner specs and estimate 01/12/2016 02:33 AM
10526 uBooNE Detector Physics Task New Normal Laser+Cosmics calibration methods 02/08/2016 10:51 AM
10515 uBooNE Detector Physics Task New Normal Special Laser and Cosmic Runs at 50kV, 60kV 02/08/2016 11:03 AM
10512 ANNIE1-electronics-design Task New Normal Test final pickoff/splitter 04/06/2016 11:14 PM
10024 SeaQuest Polarized Target Task New Normal ship pumps to FNAl 09/03/2015 09:17 AM
9930 uBooNE Detector Physics Task Assigned Normal Production TPC pedestal determination 02/22/2016 01:59 PM
9928 uBooNE Detector Physics Task New Normal Identify stopping cosmics 02/22/2016 02:00 PM
9927 uBooNE Detector Physics Task New Normal Identify through-going cosmics 02/22/2016 02:00 PM
9762 GUMS Task New Normal check_mk sensor to verify user passwd/group/storage_authdb creates 07/29/2015 11:26 AM
9690 Retire SLF5 Task Resolved Normal Retire uscmsbd2 09/20/2016 11:43 AM
9687 Retire SLF5 Task Resolved Normal Retire cmslpcweb 10/11/2016 08:58 AM
9524 VME Intensity Monitor Task Work in progress Normal Request remote reboot devices 08/02/2016 10:49 AM
9392 VME Intensity Monitor Task Resolved Normal Deploy New MI Tororid Nodes 09/04/2018 01:03 PM
9278 CMS dCache Task New Normal Move the logs away from the system disk on cmsdcacheadmindisk 06/23/2015 12:13 PM
9180 Retire SLF5 Task Resolved Normal retire cmssrv01 08/10/2016 04:18 PM
9169 Retire SLF5 Task Resolved Normal Retire cmssrv126 09/20/2016 11:44 AM
9168 Retire SLF5 Task Resolved Normal Retire cmssrv116 10/11/2016 09:00 AM
9156 Monitoring check_mk Task New Normal check_mk - build and deploy checks for all roles 03/15/2016 03:48 PM
9155 Monitoring check_mk Task New Normal check_mk - enable monitoring for all roles 06/19/2015 12:20 PM
9148 Monitoring check_mk Task New Normal if-admin monitoring with check_mk 06/11/2015 03:13 PM
9070 GUMS Task New Normal Create a passwd file distribution mechanism 07/28/2015 04:12 PM
9031 DCSO glideinWMS Task New Normal Jobsub - Move to production 06/05/2015 03:07 PM
9029 DCSO glideinWMS Task New Normal Jobsub - Acceptance testing 06/05/2015 03:07 PM
9028 DCSO glideinWMS Task New Normal Jobsub - Write and test puppet modules 06/05/2015 03:07 PM
9026 DCSO glideinWMS Task New Normal Jobsub - Review current configuration 06/05/2015 03:07 PM
9025 DCSO glideinWMS Task New Normal Jobsub - Review installation procedures 06/05/2015 03:07 PM
8854 ANNIE1-mechanical-design Task New Normal Ship the muon veto structure 08/05/2015 11:47 PM
8853 ANNIE1-mechanical-design Task New Normal Water system shipped to FNAL for storage 12/06/2015 10:24 AM
8815 ANNIE1-electronics-design Task New Normal Final Decision on MRD and veto electronics 04/06/2016 11:08 PM
8636 ANNIE1-Commissioning Task New Normal Installation and commissioning of NCV 01/25/2018 07:11 AM
8634 ANNIE1-Staging Task New Normal Order materials for PMT structure 04/06/2016 11:09 PM
8633 ANNIE1-Staging Task New Normal MRD + veto system testing 04/06/2016 11:09 PM
8627 ANNIE1-MCstudies Task New Normal SciBooNE driven calculation of skyshine rates 06/04/2015 10:33 AM
8625 ANNIE1-MCstudies Task New Normal Full MC model with 3D PMTs to study neutron tagging efficiencies 01/25/2018 07:24 AM
8623 ANNIE1-MCstudies Task New Normal Geant-based estimate of beam neutron rates and energies 01/25/2018 07:22 AM
8618 ANNIE1-MRD-design Task New Normal Sign over stewardship of the MRD steel 06/05/2015 06:39 AM
8617 ANNIE1-MRD-design Task New Normal Follow up with NMSU about keeping the MRD Scintillator 12/18/2015 09:22 AM
8616 ANNIE1-MRD-design Task New Normal Follow up on Fermilab PMTs/Scintillator 06/09/2015 02:02 AM
8615 ANNIE1-MRD-design Task New Normal Arrange to get the Kansas/Syracuse PMTs and scintillator 06/05/2015 06:42 AM
8600 ANNIE1-Commissioning Task New Normal Dark commissioning of PMTs in ANNIE Hall (no water) 01/25/2018 07:10 AM
8599 ANNIE1-Commissioning Task New Normal Begin Run1 data taking 01/25/2018 07:11 AM
8577 ANNIE1-Assembly Task New Normal Water fill 01/25/2018 07:11 AM
8576 ANNIE1-Assembly Task New Normal Assembly and installation of PMT modules 04/06/2016 11:06 PM
8575 ANNIE1-Planning Task New Normal Contact Stephen Geer about June PAC meeting 05/21/2015 10:07 AM
8573 ANNIE1-mechanical-design Task New Normal Approval to purchase tank, from IA State Purchasing 05/27/2015 07:54 AM
8572 ANNIE1-mechanical-design Task New Urgent Fermilab approval for tank purchase 06/09/2015 02:01 AM
8521 Eroica Production Task New Normal Data Reco Stage 04/29/2015 10:30 AM
8520 Eroica Production Task New Normal MC Reco Stage 04/29/2015 10:30 AM
8519 Eroica Production Task New Normal MC Minos Stage 04/29/2015 10:30 AM
8518 Eroica Production Task New Normal MC Cal Stage 04/29/2015 10:30 AM
8517 Eroica Production Task New Normal MC Genie Stage 04/29/2015 10:01 AM
8516 Eroica Production Task New Normal Create Overlay Playlist 04/29/2015 10:30 AM
8515 Eroica Production Task New Normal Data Cal Stage 04/29/2015 10:30 AM
8514 Eroica Production Task New Normal Minerva Playlist 9 04/29/2015 10:30 AM
8511 Eroica Production Task New Normal Data Reco Stage 04/29/2015 10:28 AM
8510 Eroica Production Task New Normal MC Reco Stage 04/29/2015 10:30 AM
8509 Eroica Production Task New Normal MC Minos Stage 04/29/2015 10:30 AM
8508 Eroica Production Task New Normal MC Cal Stage 04/29/2015 10:30 AM
8507 Eroica Production Task New Normal MC Genie Stage 04/28/2015 09:38 PM
8506 Eroica Production Task New Normal Create Overlay Playlist 04/29/2015 10:28 AM
8505 Eroica Production Task New Normal Data Cal Stage 04/29/2015 10:28 AM
8504 Eroica Production Task New Normal Minerva Playlist 7 04/29/2015 10:30 AM
8503 Eroica Production Task New Normal Data Reco Stage 04/29/2015 10:26 AM
8502 Eroica Production Task New Normal MC Reco Stage 04/29/2015 10:26 AM
8501 Eroica Production Task New Normal MC Minos Stage 04/29/2015 10:26 AM
8500 Eroica Production Task New Normal MC Cal Stage 04/29/2015 10:26 AM
8499 Eroica Production Task New Normal MC Genie Stage 04/28/2015 09:33 PM
8498 Eroica Production Task New Normal Create Overlay Playlist 04/29/2015 10:26 AM
8497 Eroica Production Task New Normal Data Cal Stage 04/29/2015 10:26 AM
8496 Eroica Production Task New Normal Minerva Playlist downstream 04/29/2015 10:26 AM
8495 Eroica Production Task New Normal Data Reco Stage 04/29/2015 10:25 AM
8494 Eroica Production Task New Normal MC Reco Stage 04/29/2015 10:25 AM
8493 Eroica Production Task New Normal MC Minos Stage 04/29/2015 10:25 AM
8492 Eroica Production Task New Normal MC Cal Stage 04/29/2015 10:25 AM
8491 Eroica Production Task New Normal MC Genie Stage 04/28/2015 09:17 PM
8490 Eroica Production Task New Normal Create Overlay Playlist 04/29/2015 10:25 AM
8489 Eroica Production Task New Normal Data Cal Stage 04/29/2015 10:25 AM
8488 Eroica Production Task New Normal Minerva Playlist 5 04/29/2015 10:25 AM