Project

General

Profile

Issues

Filters

Apply Clear

# Project Tracker Status Priority Subject Assignee Updated
22808 Runs Task New Normal 5GHz, Cavity, (TE5RI01) + quantum amplifiers 07/25/2019 11:56 AM
24877 Runs Task New Normal DR_1_Run_8 09/29/2020 03:25 PM
22993 Runs Task New Normal Frequency detuning 2.6GHz 07/29/2019 02:33 PM
22809 Runs Task New Normal 2.6GHz cavity (w/o qubit, w/grease TTS1AES002) 06/25/2019 12:09 PM
22814 Runs Task New Normal 2.6 cavity with qubit (TTS1AES001) 07/30/2019 04:59 PM
23552 sbndaq Task New High Documentation to support shifters running the DAQ during the cooldown/filling 11/06/2019 09:31 AM
17913 Scientific Data Management Task Assigned High test staging latency feature introduced in 4.2.2 FileRouter 10/16/2017 10:29 AM
10024 SeaQuest Polarized Target Task New Normal ship pumps to FNAl 09/03/2015 09:17 AM
13013 Simons Foundation Data Management Task New Normal Remove HEP specific features 06/23/2016 02:46 PM
13040 Simons Foundation Data Management Task New Normal Client changes 06/24/2016 01:13 PM
13039 Simons Foundation Data Management Task New Normal Documentation 06/24/2016 01:09 PM
13016 Simons Foundation Data Management Task New Normal Set up and install server 06/23/2016 03:01 PM
13021 Simons Foundation Data Management Task New Normal Request security variance for OpenID cert access 06/23/2016 02:56 PM
13022 Simons Foundation Data Management Task New Normal Enable Open ID CILogin auth 06/23/2016 02:58 PM
13015 Simons Foundation Data Management Task New Normal Remove unnecessary query terms 06/23/2016 02:46 PM
13036 Simons Foundation Data Management Task New Normal Front-end web pages 06/24/2016 01:09 PM
13010 Simons Foundation Data Management Task New Normal Modify SAMWeb 06/23/2016 02:47 PM
13038 Simons Foundation Data Management Task New Normal Deploy self-registration 06/24/2016 01:07 PM
13011 Simons Foundation Data Management Task New Normal Open ID Authentication 06/23/2016 02:48 PM
22908 Spack Infrastructure Task New Normal Install Development sam-web, station via spack 07/10/2019 01:22 PM
23616 Spack Infrastructure Task New Normal Spack Documentation Guide 11/18/2019 10:23 AM
22911 Spack Infrastructure Task New Normal Dual-mode /cvmfs/fermi.opensciencegrid.org/products/larsoft 07/11/2019 02:32 PM
22905 Spack Infrastructure Task New Normal Install via spack on development POMS instance 11/18/2019 10:23 AM
22910 Spack Infrastructure Task New Normal Dual-mode grid/fermiapp/products 07/11/2019 02:31 PM
22907 Spack Infrastructure Task New Normal Build recipe files for SAM dependencies not already in spack 07/10/2019 01:17 PM
22906 Spack Infrastructure Task New Normal Design development setup (spack install + pip -e ?) 07/10/2019 01:03 PM
16274 Summer Shutdown 2017 Task New Normal Trigger Validation Framework 04/21/2017 10:40 AM
25087 Superconducting Quantum Computing Task New Normal DR1_Run9(3GHz cavity - Rigetti qubit test) 11/16/2020 12:29 PM
22836 Superconducting Quantum Computing Task New Normal spectroscopy 2.6 07/08/2019 11:54 AM
25193 Superconducting Quantum Computing Task New Normal DR2 cooldown test 11/13/2020 09:05 AM
23805 Superconducting Quantum Computing Task New Normal DR1_Run_6 - Measure 3 GHz cavities 12/26/2019 11:01 AM
23809 Superconducting Quantum Computing Task New Normal DR1_Run_6 - Measure qubit from McDermott 02/13/2020 11:49 AM
11673 uBooNE Detector Physics Task New Normal Apply lifetime correction to hits 02/08/2016 11:41 AM
11671 uBooNE Detector Physics Task New Normal Look at data from different fields 02/08/2016 11:42 AM
10526 uBooNE Detector Physics Task New Normal Laser+Cosmics calibration methods 02/08/2016 10:51 AM
11666 uBooNE Detector Physics Task New Normal Measure the ADC to charge conversion 02/08/2016 11:33 AM
11667 uBooNE Detector Physics Task New Normal Get ADC to charge conversion from crossing tracks 02/08/2016 11:35 AM
9928 uBooNE Detector Physics Task New Normal Identify stopping cosmics 02/22/2016 02:00 PM
11684 uBooNE Detector Physics Task New Normal Use ADC to charge conversion 02/09/2016 11:40 AM
11682 uBooNE Detector Physics Task New Normal Apply recombination correction using modified Box model (or Birk's) 02/09/2016 11:38 AM
9930 uBooNE Detector Physics Task Assigned Normal Production TPC pedestal determination 02/22/2016 01:59 PM
10515 uBooNE Detector Physics Task New Normal Special Laser and Cosmic Runs at 50kV, 60kV 02/08/2016 11:03 AM
11669 uBooNE Detector Physics Task New Normal Identify stopping muons 03/16/2016 02:17 PM
11686 uBooNE Detector Physics Task New Normal Create TPC reconstruction algorithm 02/09/2016 11:43 AM
9927 uBooNE Detector Physics Task New Normal Identify through-going cosmics 02/22/2016 02:00 PM
11675 uBooNE Detector Physics Task New Normal Apply space charge correction if necessary 02/08/2016 11:44 AM
11683 uBooNE Detector Physics Task New Normal Apply lifetime corrections to hits 02/09/2016 11:41 AM
11670 uBooNE Detector Physics Task New Normal Hypothesize the Bragg peak and scale measured charge to match 02/08/2016 11:42 AM
11668 uBooNE Detector Physics Task New Normal Get ADC to charge conversion from MuCS tracks 02/08/2016 11:36 AM
11674 uBooNE Detector Physics Task New Normal Look at hit width as a function of time 02/08/2016 11:43 AM
11676 uBooNE Detector Physics Task New Normal Understand the double-exponential or exponential behavior 02/11/2016 11:31 AM
13643 uBooNE Reconstruction Task Resolved Normal lifetime correction 11/02/2016 01:45 PM
13647 uBooNE Reconstruction Task New Normal containment of charge in TPC : study and corrections 11/02/2016 01:45 PM
13650 uBooNE Reconstruction Task New Normal shower dE/dx reconstruction 09/20/2016 03:59 PM
13646 uBooNE Reconstruction Task New Normal charge clustering impact on energy estimation 11/02/2016 01:36 PM
13653 uBooNE Reconstruction Task New Normal data-driven 3D direction & energy resolution calculation 11/01/2016 02:23 PM
14361 uBooNE Reconstruction Task New Normal DATA gain validation 11/02/2016 01:23 PM
13639 uBooNE Reconstruction Task New Normal shower 3D start point reconstruction 09/20/2016 03:50 PM
13633 uBooNE Reconstruction Task Assigned Normal Remove external shower-reconstruction dependency 09/01/2016 04:53 PM
13641 uBooNE Reconstruction Task New Normal electronics gain calculation 11/02/2016 02:24 PM
13649 uBooNE Reconstruction Task New Normal neutrino vertex resolution measurement /estimation 11/01/2016 02:22 PM
13636 uBooNE Reconstruction Task Resolved Normal sample identification [through hand-scanning] 09/20/2016 03:52 PM
14360 uBooNE Reconstruction Task New Normal MC gain estimation and validation 11/02/2016 01:21 PM
13634 uBooNE Reconstruction Task Assigned Normal Overlapping track removal 09/01/2016 04:54 PM
13648 uBooNE Reconstruction Task New Normal 3D shower direction reconstruction 11/01/2016 02:22 PM
13651 uBooNE Reconstruction Task New Normal Pi0 Mass Peak reconstruction 11/01/2016 02:23 PM
13640 uBooNE Reconstruction Task New Normal Energy reconstruction 11/02/2016 02:24 PM
13427 uBooNE Reconstruction Task New Normal Interface to new Track Fitter 08/03/2016 12:35 PM
13645 uBooNE Reconstruction Task New Normal dead-wire region impact on energy 11/02/2016 01:34 PM
13652 uBooNE Reconstruction Task New Normal detector energy calibration 09/20/2016 04:00 PM
13747 uBooNE Reconstruction Task New Normal Pi0 Clustering 09/01/2016 04:53 PM
13644 uBooNE Reconstruction Task New Normal recombination correction 11/02/2016 01:27 PM
13291 ubpm Task New Normal Rename RRXxx classes to MuonXxx 07/19/2016 11:59 AM
13295 ubpm Task New Normal Modify MuonStateMachine to respond to Muon campus events 07/19/2016 12:22 PM
13284 ubpm Task New Normal Assemble crate 07/19/2016 11:39 AM
13290 ubpm Task New Normal Establish Targets file, startup scripts and boot areas 07/19/2016 11:57 AM
13294 ubpm Task New Normal Add Muon Campus Devel 'area' to R43 and R44 07/19/2016 12:18 PM
13293 ubpm Task New Normal Create ACNET devices for test node 07/19/2016 12:07 PM
13286 ubpm Task New Normal Request ACNET node name 07/19/2016 11:41 AM
13288 ubpm Task New Normal Create git repository 07/19/2016 11:49 AM
13285 ubpm Task New Normal Network connection 07/19/2016 11:40 AM
16576 VME BPM Task New Normal Investigate reading back attenuator settings from transition crate 05/17/2017 11:16 AM
16577 VME BPM Task New Normal Improve error handling of CAN bus communication 04/12/2018 09:10 AM
16573 VME BPM Task New Normal Establish alarms for SBPMxx nodes 05/17/2017 10:44 AM
16574 VME BPM Task New Normal ACNET support for beam threshold 05/17/2017 11:05 AM
16575 VME BPM Task New Normal Error state during spill 05/17/2017 11:10 AM
16572 VME BPM Task New Normal Put together a test stand 05/17/2017 10:38 AM
9524 VME Intensity Monitor Task Work in progress Normal Request remote reboot devices 08/02/2016 10:49 AM
16589 VME Intensity Monitor Task New Normal Verify new devices with a test signal 05/18/2017 02:51 PM
11687 VME Intensity Monitor Task New Normal Move ADC drivers to adinsthw 03/15/2016 12:20 PM
9392 VME Intensity Monitor Task Resolved Normal Deploy New MI Tororid Nodes 09/04/2018 01:03 PM
19614 VME Intensity Monitor Task New Normal Install and configure hardware for S16TOR 04/09/2018 03:10 PM
17355 VME Intensity Monitor Task New Normal Test & Verify 08/03/2017 09:40 AM
17764 VME Intensity Monitor Task New Normal More summation devices requested 09/22/2017 03:59 PM
12191 VME Intensity Monitor Task New Normal Refactor TRACE0 calls with the appropriate TRACE/TRACE0/TRACEP 04/06/2016 04:13 PM
11629 VME Intensity Monitor Task New Normal Refactor to useAD/Control's concurrency library 03/15/2016 12:20 PM
16590 VME Intensity Monitor Task New Normal Verify BBM interface with Bill Marsh's test program 05/18/2017 02:52 PM
14831 uBooNE Production Production Request New Urgent MCC7 in time CORSIKA samples 12/16/2016 09:52 AM
(4501-4598/4598) Per page: 25, 50, 100, 5000

Also available in: Atom CSV PDF