# Project Tracker Status Priority Subject Assignee Updated
8958 CMS dCache Task Resolved Normal ECF-CIS tests the enhanced acceptance test on cmsstor108/110 and detect issues, passes it on to DCSO Gerard Bernabeu Altayo 05/27/2015 05:28 PM
9784 CMS dCache Task Resolved High Prepare for downtime Aug 5th Natalia Ratnikova 08/14/2015 11:57 AM
8950 CMS dCache Task Resolved Normal Planning and figuraing out the scope Chih-Hao Huang 07/24/2015 03:45 PM
8928 CMS dCache Task Resolved Normal Enhance procedure for adding new pools Natalia Ratnikova 07/20/2015 02:29 PM
11576 CMS dCache Task Resolved Normal Retiring cmsstor168 - cmsstor209 Chih-Hao Huang 02/23/2016 06:06 PM
10737 CMS dCache Task Resolved Normal Renew certificates for cmsstor401 - cmsstor408 Chih-Hao Huang 11/02/2015 05:04 PM
12147 CMS dCache Task Resolved Normal Handling cmsstor437 / cmsdisk437438 issue Chih-Hao Huang 04/08/2016 01:52 PM
10759 CMS dCache Task Resolved Normal Decommission cmsstor111 cmsstor113 cmsstor114 cmsstor115 cmsstor117 cmsstor136 cmsstor137 cmsstor138 cmsstor139 cmsstor140 cmsstor141 cmsstor142 cmsstor143 cmsstor144 cmsstor145 cmsstor146 cmsstor147 cmsstor148 cmsstor156 cmsstor162 cmsstor163 Chih-Hao Huang 11/23/2015 05:27 PM
12225 CMS dCache Task Resolved Normal Draining cmsstor417 - cmsstor420 and preparing for moving them to new dCache (disk) instance. Chih-Hao Huang 05/31/2016 11:00 AM
8953 CMS dCache Task Accepted Normal Systematically migrating all alrams from zabbix to check_mk Chih-Hao Huang 07/23/2015 09:47 PM
25495 CCQENu Management Task New Normal Profiling code , memory and CPU Andrew Olivier 02/09/2021 10:21 AM
24825 Booster LLRF PIP-II Integration Task Assigned Normal Timing System / MEBT Chppoer / Booster LLRF block diagram and timeline development Ed Cullerton 08/26/2020 03:39 PM
24304 BOE and RLS Task New Normal Master BOE 04/30/2020 03:17 PM
9045 Bad files and Damaged Tapes Task Resolved Normal VPC813 Chih-Hao Huang 06/04/2015 11:41 AM
9316 Bad files and Damaged Tapes Task Resolved Normal VPG549 Chih-Hao Huang 06/27/2015 11:27 AM
9314 Bad files and Damaged Tapes Task Resolved Normal VPF960 Chih-Hao Huang 06/27/2015 11:18 AM
8944 Bad files and Damaged Tapes Task Resolved Normal VPB406 Chih-Hao Huang 06/27/2015 11:36 AM
9319 Bad files and Damaged Tapes Task Resolved Normal VPJ005 Chih-Hao Huang 06/27/2015 11:36 AM
8948 Bad files and Damaged Tapes Task Resolved Normal VPB681 Chih-Hao Huang 06/27/2015 11:37 AM
9315 Bad files and Damaged Tapes Task Resolved Normal VPF959 Chih-Hao Huang 06/27/2015 11:22 AM
9317 Bad files and Damaged Tapes Task Resolved Normal VPF855 Chih-Hao Huang 06/27/2015 11:31 AM
22683 ArtDaq RunControl GUI Task New Normal Enable MRB support on the project Iker de Icaza Astiz 06/04/2019 05:34 PM
18567 ANNIE2-mechanical-design Task New Normal Finalize design of source calibration system 12/14/2017 01:33 PM
18564 ANNIE2-mechanical-design Task New Normal Separate voltage regulators from ACDCs to separate board 06/12/2018 09:20 AM
18565 ANNIE2-mechanical-design Task New Normal Final layout of new LAPPD housing 06/12/2018 09:19 AM
18568 ANNIE2-mechanical-design Task New Normal Finalize design of transparency calibration system 12/14/2017 01:34 PM
18562 ANNIE2-mechanical-design Task New Normal Draft LAPPD mounting board design 06/12/2018 09:19 AM
18556 ANNIE2-mechanical-design Task New High Design of the new tank lid 01/25/2018 07:34 AM
18570 ANNIE2-mechanical-design Task New Normal Finalize experimental layout in the hall 12/14/2017 01:39 PM
18553 ANNIE2-mechanical-design Task New High Finalize design concept of inner structure Matthew Wetstein 06/13/2018 01:28 AM
18572 ANNIE2-mechanical-design Task New Normal Cleanliness and handling strategy 06/12/2018 09:20 AM
18560 ANNIE2-mechanical-design Task New Normal Figure out how to optically isolate the inner volume 12/14/2017 01:14 PM
18566 ANNIE2-mechanical-design Task New Normal Finalize design of timing calibration system 01/25/2018 07:39 AM
18571 ANNIE2-mechanical-design Task New Normal Finalize design and layout of water system 01/25/2018 07:40 AM
18569 ANNIE2-mechanical-design Task New Normal Revise Specification Doc. 06/12/2018 09:18 AM
20349 ANNIE2-mechanical-design Task Assigned Normal Magnetization of the tank Emrah Tiras 07/18/2018 01:37 PM
18561 ANNIE2-mechanical-design Task Work in progress Normal Write TSW Emrah Tiras 06/12/2018 09:18 AM
18573 ANNIE2-mechanical-design Task Work in progress Normal Gd-Safety and procedures (discussion with Angela) Emrah Tiras 02/09/2018 10:50 AM
18931 ANNIE2-electronics-readiness Task New Normal Finish new ACDC-ACC interface firmware 02/09/2018 09:12 AM
18933 ANNIE2-electronics-readiness Task New Normal Firmware upgrades for KOTO boards (2 different trigger schemes) 02/09/2018 09:13 AM
18932 ANNIE2-electronics-readiness Task New Normal Ethernet interface for ACC 02/09/2018 09:13 AM
18938 ANNIE2-electronics-design Task New Normal Design for separate ACDC voltage regulator board 02/09/2018 09:43 AM
18937 ANNIE2-electronics-design Task New Normal Design the backboard for the LAPPD with ACDC connectors 02/09/2018 09:31 AM
18928 ANNIE2-Assembly Task New Normal Finish MRD Refurbishment 02/09/2018 09:06 AM
18930 ANNIE2-Assembly Task New Normal In situ calibration of MRD layers 02/09/2018 09:07 AM
18929 ANNIE2-Assembly Task New Normal Functional test of new MRD layers 02/09/2018 09:07 AM
11100 ANNIE1-Staging Task New Normal Cables for Forward Veto 04/06/2016 11:09 PM
8634 ANNIE1-Staging Task New Normal Order materials for PMT structure 04/06/2016 11:09 PM
8633 ANNIE1-Staging Task New Normal MRD + veto system testing 04/06/2016 11:09 PM
8575 ANNIE1-Planning Task New Normal Contact Stephen Geer about June PAC meeting 05/21/2015 10:07 AM
8617 ANNIE1-MRD-design Task New Normal Follow up with NMSU about keeping the MRD Scintillator 12/18/2015 09:22 AM
8618 ANNIE1-MRD-design Task New Normal Sign over stewardship of the MRD steel 06/05/2015 06:39 AM
8616 ANNIE1-MRD-design Task New Normal Follow up on Fermilab PMTs/Scintillator 06/09/2015 02:02 AM
8615 ANNIE1-MRD-design Task New Normal Arrange to get the Kansas/Syracuse PMTs and scintillator 06/05/2015 06:42 AM
8572 ANNIE1-mechanical-design Task New Urgent Fermilab approval for tank purchase 06/09/2015 02:01 AM
8573 ANNIE1-mechanical-design Task New Normal Approval to purchase tank, from IA State Purchasing 05/27/2015 07:54 AM
10170 ANNIE1-mechanical-design Task New Normal Cost out PVC for ANNIE Run I Plan (with plan B) Carrie McGivern 01/12/2016 02:34 AM
11092 ANNIE1-mechanical-design Task New Normal Finish design of PMT holders 01/22/2016 08:51 AM
10203 ANNIE1-mechanical-design Task New Normal Determine placement of water pump Carrie McGivern 01/12/2016 02:33 AM
10171 ANNIE1-mechanical-design Task New Normal Follow up with Steve Dazeley Matthew Wetstein 09/18/2015 12:59 PM
10173 ANNIE1-mechanical-design Task New Normal Cost out plastic bag liner, get lead time Matthew Wetstein 12/06/2015 10:33 AM
10176 ANNIE1-mechanical-design Task New Normal Design of inner strcture Carrie McGivern 01/12/2016 02:31 AM
8854 ANNIE1-mechanical-design Task New Normal Ship the muon veto structure 08/05/2015 11:47 PM
10174 ANNIE1-mechanical-design Task New Normal Design of tank top Carrie McGivern 01/12/2016 02:32 AM
11076 ANNIE1-mechanical-design Task New Normal Final decision on liner specs and estimate 01/12/2016 02:33 AM
10201 ANNIE1-mechanical-design Task New Normal Determine how structure and top will be lowered in ANNIE Hall Carrie McGivern 01/19/2016 02:33 PM
8853 ANNIE1-mechanical-design Task New Normal Water system shipped to FNAL for storage 12/06/2015 10:24 AM
10175 ANNIE1-mechanical-design Task New Normal Design of access platform Carrie McGivern 12/06/2015 10:36 AM
8625 ANNIE1-MCstudies Task New Normal Full MC model with 3D PMTs to study neutron tagging efficiencies 01/25/2018 07:24 AM
8627 ANNIE1-MCstudies Task New Normal SciBooNE driven calculation of skyshine rates 06/04/2015 10:33 AM
8623 ANNIE1-MCstudies Task New Normal Geant-based estimate of beam neutron rates and energies 01/25/2018 07:22 AM
11349 ANNIE1-electronics-design Task New High DAQ board reader TOOL 01/15/2016 08:05 AM
11345 ANNIE1-electronics-design Task New Normal DAQ Serialisation 01/05/2016 08:17 AM
11348 ANNIE1-electronics-design Task New Normal Postgress setup 01/05/2016 08:22 AM
10535 ANNIE1-electronics-design Task New Normal Select and buy a suitable GPS receiver Jonathan Eisch 01/25/2018 07:16 AM
10512 ANNIE1-electronics-design Task New Normal Test final pickoff/splitter 04/06/2016 11:14 PM
11347 ANNIE1-electronics-design Task New Normal DAQ monitoring system Benjamin Richards 01/05/2016 08:21 AM
8808 ANNIE1-electronics-design Task New Normal Get details of what we can get from the beam spill and timing Jonathan Eisch 06/10/2015 10:48 AM
8815 ANNIE1-electronics-design Task New Normal Final Decision on MRD and veto electronics 04/06/2016 11:08 PM
8813 ANNIE1-electronics-design Task Assigned Normal Design for clock distribution and timing Jonathan Eisch 01/25/2018 07:15 AM
10449 ANNIE1-electronics-design Task Assigned Normal HV pickoff & signal splitter Jonathan Eisch 04/06/2016 11:14 PM
10534 ANNIE1-electronics-design Task Assigned Normal Determine GPS antenna location at ANNIE Hall Jonathan Eisch 01/25/2018 07:17 AM
8809 ANNIE1-electronics-design Task Assigned Normal Interface for PSEC electronics with ART system Karen Hayrapetyan 10/09/2015 01:06 PM
10457 ANNIE1-electronics-design Task Assigned Normal Design and build full sized pickoff/splitter board Jonathan Eisch 01/12/2016 03:07 PM
9086 ANNIE1-electronics-design Task Assigned Normal Contact Zarko Pavlovic about beam timing signals. Jonathan Eisch 06/10/2015 10:48 AM
8913 ANNIE1-electronics-design Task Assigned Normal Send an ACDC + central card to QMUL Matthew Wetstein 10/09/2015 01:09 PM
8812 ANNIE1-electronics-design Task Assigned Normal Solidify Layout and number of crates channels for ANNIE RunI (Run II) Matthew Wetstein 04/06/2016 11:14 PM
10509 ANNIE1-electronics-design Task Assigned Normal Attach bulkhead connectors and pcb mounting hardware Jonathan Eisch 04/06/2016 11:13 PM
10468 ANNIE1-electronics-design Task Assigned Normal Pickoff/splitter enclosure production Jonathan Eisch 04/06/2016 11:13 PM
10530 ANNIE1-electronics-design Task Assigned Normal Timing distribution system Jonathan Eisch 01/25/2018 07:17 AM
9089 ANNIE1-electronics-design Task Assigned Normal UC ADC cards Jonathan Eisch 01/25/2018 07:16 AM
10510 ANNIE1-electronics-design Task Assigned Normal Mount pickoff/splitter pcb in enclosure, solder wires to bulkhead connectors Jonathan Eisch 04/06/2016 11:09 PM
10443 ANNIE1-electronics-design Task Assigned Normal Make readout methods (to be used by artdaq) Jonathan Eisch 01/25/2018 07:16 AM
10440 ANNIE1-electronics-design Task Assigned Normal Externally trigger ADC cards Jonathan Eisch 01/25/2018 07:14 AM
11351 ANNIE1-electronics-design Task Assigned Normal DAQ output TOOL Benjamin Richards 01/15/2016 08:03 AM
10532 ANNIE1-electronics-design Task Assigned Normal Select timing sources Jonathan Eisch 01/25/2018 07:17 AM
10463 ANNIE1-electronics-design Task Assigned Normal HV pickoff/splitter enclosure Jonathan Eisch 04/06/2016 11:13 PM
10533 ANNIE1-electronics-design Task Assigned Normal Determine the suitability of GPS timing reference Jonathan Eisch 01/25/2018 07:17 AM
11342 ANNIE1-electronics-design Task Resolved Normal DAQ ZMQ/multicast integration Benjamin Richards 01/15/2016 08:07 AM
11346 ANNIE1-electronics-design Task Resolved Normal DAQ Control systems Benjamin Richards 01/15/2016 08:07 AM