Project

General

Profile

Issues

Filters

Apply Clear

# Project Tracker Status Priority Subject Assignee Updated
13021 Simons Foundation Data Management Task New Normal Request security variance for OpenID cert access 06/23/2016 02:56 PM
13019 Simons Foundation Data Management Task New Normal Request server VM Michael Diesburg 06/23/2016 02:51 PM
13037 Simons Foundation Data Management Task New Normal Self registration (via CILogon) Michael Gheith 06/24/2016 01:06 PM
13016 Simons Foundation Data Management Task New Normal Set up and install server 06/23/2016 03:01 PM
13020 Simons Foundation Data Management Task New Normal Set up SAM Web server Michael Diesburg 06/23/2016 03:02 PM
22904 Spack Infrastructure Task Work in progress Normal Build recipe files for POMS and dependencies not yet in spack Marc Mengel 11/18/2019 10:23 AM
22907 Spack Infrastructure Task New Normal Build recipe files for SAM dependencies not already in spack 07/10/2019 01:17 PM
22906 Spack Infrastructure Task New Normal Design development setup (spack install + pip -e ?) 07/10/2019 01:03 PM
22911 Spack Infrastructure Task New Normal Dual-mode /cvmfs/fermi.opensciencegrid.org/products/larsoft 07/11/2019 02:32 PM
22910 Spack Infrastructure Task New Normal Dual-mode grid/fermiapp/products 07/11/2019 02:31 PM
22894 Spack Infrastructure Task New Normal Initial coding Marc Mengel 11/18/2019 10:23 AM
22908 Spack Infrastructure Task New Normal Install Development sam-web, station via spack 07/10/2019 01:22 PM
22905 Spack Infrastructure Task New Normal Install via spack on development POMS instance 11/18/2019 10:23 AM
23616 Spack Infrastructure Task New Normal Spack Documentation Guide 11/18/2019 10:23 AM
22900 Spack Infrastructure Task New Normal Test chained spack instance installs Vito Di Benedetto 11/18/2019 10:23 AM
23006 Spack Infrastructure Task New Normal Test installing spack packages into cvmfs area Patrick Gartung 11/18/2019 10:23 AM
23007 Spack Infrastructure Task New Normal Test spack build of "leaf" packages under CI Vito Di Benedetto 07/29/2019 03:05 PM
8994 Storage Task Resolved Normal Describe observed load distribution in dCache/EOS Gerard Bernabeu Altayo 06/05/2015 05:21 PM
11112 Storage Task Resolved Normal HPC - dsluster21 backups Gerard Bernabeu Altayo 03/15/2016 03:28 PM
20643 Studies Task Assigned Normal Update Recycler Orbit Main Injector Ramp Compensation Kyle Hazelwood 08/20/2018 11:18 AM
16274 Summer Shutdown 2017 Task New Normal Trigger Validation Framework 04/21/2017 10:40 AM
23805 Superconducting Quantum Computing Task New Normal DR1_Run_6 - Measure 3 GHz cavities 12/26/2019 11:01 AM
23809 Superconducting Quantum Computing Task New Normal DR1_Run_6 - Measure qubit from McDermott 02/13/2020 11:49 AM
25193 Superconducting Quantum Computing Task New Normal DR2 cooldown test 11/13/2020 09:05 AM
22836 Superconducting Quantum Computing Task New Normal spectroscopy 2.6 07/08/2019 11:54 AM
8919 Tape Operation Task Resolved Normal 2 device errors reported by enstore both cmsstor113 Chih-Hao Huang 05/25/2015 10:09 PM
8918 Tape Operation Task Resolved Normal 3 device errors reported by encp - cmsstor145, cmsstor117 and cmsstor133 Chih-Hao Huang 05/25/2015 10:08 PM
8998 Tape Operation Task Resolved Normal Enstore alarms for DEVICE ERROR Chih-Hao Huang 06/01/2015 03:23 PM
9098 Tape Operation Task Resolved Normal Gather task list of Enstore tasks done by CMS Chih-Hao Huang 12/09/2015 11:43 AM
10990 Timing Library Task Accepted Normal Support for Charlie's evttrig library John Diamond 11/28/2015 09:45 PM
18344 TrajCluster Task Resolved Normal Compile TCDebugTools Tingjun Yang 11/20/2017 02:17 PM
10516 uBooNE Detector Physics Task New Normal Analyzing Special Laser and Cosmic Runs at 50, 60, 70kV Sowjanya Gollapinni 02/08/2016 11:03 AM
11683 uBooNE Detector Physics Task New Normal Apply lifetime corrections to hits 02/09/2016 11:41 AM
11673 uBooNE Detector Physics Task New Normal Apply lifetime correction to hits 02/08/2016 11:41 AM
11682 uBooNE Detector Physics Task New Normal Apply recombination correction using modified Box model (or Birk's) 02/09/2016 11:38 AM
11675 uBooNE Detector Physics Task New Normal Apply space charge correction if necessary 02/08/2016 11:44 AM
10524 uBooNE Detector Physics Task Assigned Normal Calibration framework in LArSoft Christoph Rudolf von rohr 02/08/2016 10:50 AM
10626 uBooNE Detector Physics Task Assigned Normal create operational configuration files for laser calibration runs Matthias Luethi 02/08/2016 10:53 AM
11686 uBooNE Detector Physics Task New Normal Create TPC reconstruction algorithm 02/09/2016 11:43 AM
11667 uBooNE Detector Physics Task New Normal Get ADC to charge conversion from crossing tracks 02/08/2016 11:35 AM
11668 uBooNE Detector Physics Task New Normal Get ADC to charge conversion from MuCS tracks 02/08/2016 11:36 AM
11670 uBooNE Detector Physics Task New Normal Hypothesize the Bragg peak and scale measured charge to match 02/08/2016 11:42 AM
9928 uBooNE Detector Physics Task New Normal Identify stopping cosmics 02/22/2016 02:00 PM
11669 uBooNE Detector Physics Task New Normal Identify stopping muons 03/16/2016 02:17 PM
9927 uBooNE Detector Physics Task New Normal Identify through-going cosmics 02/22/2016 02:00 PM
10526 uBooNE Detector Physics Task New Normal Laser+Cosmics calibration methods 02/08/2016 10:51 AM
10624 uBooNE Detector Physics Task Assigned Normal Laser track reco Matthias Luethi 02/08/2016 10:55 AM
11671 uBooNE Detector Physics Task New Normal Look at data from different fields 02/08/2016 11:42 AM
11674 uBooNE Detector Physics Task New Normal Look at hit width as a function of time 02/08/2016 11:43 AM
11666 uBooNE Detector Physics Task New Normal Measure the ADC to charge conversion 02/08/2016 11:33 AM
9932 uBooNE Detector Physics Task Assigned Normal Populate DQM database Kazuhiro Terao 02/08/2016 11:09 AM
9931 uBooNE Detector Physics Task Assigned Normal Production PMT pedestal and gain determination Taritree Wongjirad 02/08/2016 11:09 AM
9930 uBooNE Detector Physics Task Assigned Normal Production TPC pedestal determination 02/22/2016 01:59 PM
10662 uBooNE Detector Physics Task Assigned Normal Reconstruction of laser tracks Christoph Rudolf von rohr 02/08/2016 10:54 AM
10523 uBooNE Detector Physics Task Assigned Normal Setting laser paths in TPC Matthias Luethi 02/08/2016 10:51 AM
10515 uBooNE Detector Physics Task New Normal Special Laser and Cosmic Runs at 50kV, 60kV 02/08/2016 11:03 AM
10518 uBooNE Detector Physics Task Assigned Normal T0 Extraction Ariana Hackenburg 02/08/2016 11:04 AM
10519 uBooNE Detector Physics Task New Normal Technote: Diffusion Measurement Sowjanya Gollapinni 02/08/2016 10:58 AM
10514 uBooNE Detector Physics Task New Normal Technote: Purity from TPC data Sowjanya Gollapinni 02/08/2016 11:10 AM
10527 uBooNE Detector Physics Task Resolved Normal Technotes: Space Charge Measurement Michael Mooney 11/10/2016 05:17 PM
10525 uBooNE Detector Physics Task Assigned Normal Testing of laser-only calibration methods with framework Christoph Rudolf von rohr 02/08/2016 10:51 AM
11676 uBooNE Detector Physics Task New Normal Understand the double-exponential or exponential behavior 02/11/2016 11:31 AM
11684 uBooNE Detector Physics Task New Normal Use ADC to charge conversion 02/09/2016 11:40 AM
10517 uBooNE Detector Physics Task New Normal Validating MC analysis technique with data Sowjanya Gollapinni 02/08/2016 11:04 AM
13648 uBooNE Reconstruction Task New Normal 3D shower direction reconstruction 11/01/2016 02:22 PM
13646 uBooNE Reconstruction Task New Normal charge clustering impact on energy estimation 11/02/2016 01:36 PM
13647 uBooNE Reconstruction Task New Normal containment of charge in TPC : study and corrections 11/02/2016 01:45 PM
13469 uBooNE Reconstruction Task New Normal Creation and refinement of vertex candidates Joris De vries 11/04/2016 11:12 AM
13653 uBooNE Reconstruction Task New Normal data-driven 3D direction & energy resolution calculation 11/01/2016 02:23 PM
14361 uBooNE Reconstruction Task New Normal DATA gain validation 11/02/2016 01:23 PM
13645 uBooNE Reconstruction Task New Normal dead-wire region impact on energy 11/02/2016 01:34 PM
13652 uBooNE Reconstruction Task New Normal detector energy calibration 09/20/2016 04:00 PM
13641 uBooNE Reconstruction Task New Normal electronics gain calculation 11/02/2016 02:24 PM
13640 uBooNE Reconstruction Task New Normal Energy reconstruction 11/02/2016 02:24 PM
13475 uBooNE Reconstruction Task New Normal Improved 3D SpacePoints Jack Weston 11/04/2016 11:13 AM
11270 uBooNE Reconstruction Task Work in progress Normal Integrate Pandora into shower-finding algorithms Yun-tse Tsai 08/02/2016 01:31 PM
14204 uBooNE Reconstruction Task Work in progress Normal Integration of Cluster3D into LArSoft reconstruction Tracy Usher 10/21/2016 11:01 AM
13415 uBooNE Reconstruction Task New Normal Integration of linecluster/trajcluster into the LArSoft reconstruction chain Bruce Baller 09/13/2016 02:00 PM
13413 uBooNE Reconstruction Task New Normal Integration of wire-cell into the LArSoft reconstruction chain Brett Viren 08/02/2016 06:20 PM
13427 uBooNE Reconstruction Task New Normal Interface to new Track Fitter 08/03/2016 12:35 PM
13421 uBooNE Reconstruction Task New Normal LArLite/LArSoft merge of shower reconstruction elements Yun-tse Tsai 08/02/2016 02:50 PM
13643 uBooNE Reconstruction Task Resolved Normal lifetime correction 11/02/2016 01:45 PM
14360 uBooNE Reconstruction Task New Normal MC gain estimation and validation 11/02/2016 01:21 PM
13474 uBooNE Reconstruction Task New Normal Missing tracks (fully-enclosed in gap in one view) Lorena Escudero sanchez 11/04/2016 11:13 AM
13649 uBooNE Reconstruction Task New Normal neutrino vertex resolution measurement /estimation 11/01/2016 02:22 PM
14341 uBooNE Reconstruction Task New Normal Optimize existing hit finder parameters Salvatore Davide Porzio 11/01/2016 11:26 AM
13634 uBooNE Reconstruction Task Assigned Normal Overlapping track removal 09/01/2016 04:54 PM
13473 uBooNE Reconstruction Task New Normal Particle (esp. shower) merging John Marshall 11/04/2016 11:11 AM
13747 uBooNE Reconstruction Task New Normal Pi0 Clustering 09/01/2016 04:53 PM
13635 uBooNE Reconstruction Task Assigned Normal Pi0 data sample reconstruction David Caratelli 11/02/2016 02:24 PM
13651 uBooNE Reconstruction Task New Normal Pi0 Mass Peak reconstruction 11/01/2016 02:23 PM
13419 uBooNE Reconstruction Task New Normal Port LArLite based flash matching into LArSoft Pip Hamilton 08/02/2016 02:44 PM
11271 uBooNE Reconstruction Task Assigned Normal Port LArLite shower-finding code back into LArSoft Yun-tse Tsai 08/02/2016 01:33 PM
13644 uBooNE Reconstruction Task New Normal recombination correction 11/02/2016 01:27 PM
13633 uBooNE Reconstruction Task Assigned Normal Remove external shower-reconstruction dependency 09/01/2016 04:53 PM
13636 uBooNE Reconstruction Task Resolved Normal sample identification [through hand-scanning] 09/20/2016 03:52 PM
13637 uBooNE Reconstruction Task Resolved Normal sample re-processing with gaussian deconvolution filter David Caratelli 11/02/2016 01:49 PM
13638 uBooNE Reconstruction Task New Normal sample re-processing with updated hit-finder thresholds David Caratelli 09/20/2016 03:49 PM
13470 uBooNE Reconstruction Task New Normal Scoring of vertex candidates Jack Weston 11/04/2016 11:12 AM
13639 uBooNE Reconstruction Task New Normal shower 3D start point reconstruction 09/20/2016 03:50 PM
(4401-4500/4596) Per page: 25, 50, 100, 5000

Also available in: Atom CSV PDF