Project

General

Profile

Issues

Filters

Apply Clear

# Project Tracker Status Priority Subject Assignee Updated
13442 uBooNE code Necessary Maintenance New Normal Outdated specification for data product dictionary 08/04/2016 02:49 PM
8059 uBooNE DAQ Feature New High populate the runConfig db Andrzej Szelc 03/11/2015 12:36 AM
12846 uBooNE DAQ Feature New Normal Add Ganglia slowmon timeout based on "TN" field in ganglia data Glenn Horton-Smith 06/03/2016 10:28 AM
8055 uBooNE DAQ Bug New Normal Supernova Compression Kazuhiro Terao 03/11/2015 12:10 AM
8058 uBooNE DAQ Bug New Normal laser DAQ Wesley Ketchum 03/11/2015 12:26 AM
8048 uBooNE DAQ Feature New Normal develop code to insert into runConfig db Yun-tse Tsai 05/15/2015 07:24 PM
8050 uBooNE DAQ Feature New Normal PUBS 2 -- beamdata merge, swizzle Yun-tse Tsai 03/10/2015 11:07 PM
7406 uBooNE DAQ Feature New Normal RunControl --- check marks in resource selection should be consistent (checkbox means either selected or deselected, not both) 12/02/2014 04:27 PM
7550 uBooNE DAQ Feature New High RunControl --- Need way to know status of all processes 01/27/2015 10:58 AM
7542 uBooNE DAQ Bug New Normal DAQApplicationManager --- sebApps sometimes fail to start 12/18/2014 10:37 AM
10243 uBooNE DAQ Idea New Normal near real time ifbeam efficiency info 09/21/2015 05:45 PM
7828 uBooNE DAQ Feature New Normal RunControl --- ASIC and Pulser configurations done inside run control 03/11/2015 12:27 AM
7500 uBooNE DAQ Bug New Normal RunControl --- install area not properly populated with "setup" and ".upsfiles" upon creation 12/12/2014 02:33 PM
10519 uBooNE Detector Physics Task New Normal Technote: Diffusion Measurement Sowjanya Gollapinni 02/08/2016 10:58 AM
10517 uBooNE Detector Physics Task New Normal Validating MC analysis technique with data Sowjanya Gollapinni 02/08/2016 11:04 AM
10516 uBooNE Detector Physics Task New Normal Analyzing Special Laser and Cosmic Runs at 50, 60, 70kV Sowjanya Gollapinni 02/08/2016 11:03 AM
10514 uBooNE Detector Physics Task New Normal Technote: Purity from TPC data Sowjanya Gollapinni 02/08/2016 11:10 AM
11683 uBooNE Detector Physics Task New Normal Apply lifetime corrections to hits 02/09/2016 11:41 AM
11674 uBooNE Detector Physics Task New Normal Look at hit width as a function of time 02/08/2016 11:43 AM
11673 uBooNE Detector Physics Task New Normal Apply lifetime correction to hits 02/08/2016 11:41 AM
9928 uBooNE Detector Physics Task New Normal Identify stopping cosmics 02/22/2016 02:00 PM
11668 uBooNE Detector Physics Task New Normal Get ADC to charge conversion from MuCS tracks 02/08/2016 11:36 AM
10515 uBooNE Detector Physics Task New Normal Special Laser and Cosmic Runs at 50kV, 60kV 02/08/2016 11:03 AM
11666 uBooNE Detector Physics Task New Normal Measure the ADC to charge conversion 02/08/2016 11:33 AM
11676 uBooNE Detector Physics Task New Normal Understand the double-exponential or exponential behavior 02/11/2016 11:31 AM
11686 uBooNE Detector Physics Task New Normal Create TPC reconstruction algorithm 02/09/2016 11:43 AM
10526 uBooNE Detector Physics Task New Normal Laser+Cosmics calibration methods 02/08/2016 10:51 AM
11670 uBooNE Detector Physics Task New Normal Hypothesize the Bragg peak and scale measured charge to match 02/08/2016 11:42 AM
11671 uBooNE Detector Physics Task New Normal Look at data from different fields 02/08/2016 11:42 AM
11669 uBooNE Detector Physics Task New Normal Identify stopping muons 03/16/2016 02:17 PM
9927 uBooNE Detector Physics Task New Normal Identify through-going cosmics 02/22/2016 02:00 PM
11684 uBooNE Detector Physics Task New Normal Use ADC to charge conversion 02/09/2016 11:40 AM
11682 uBooNE Detector Physics Task New Normal Apply recombination correction using modified Box model (or Birk's) 02/09/2016 11:38 AM
9900 uBooNE Detector Physics Milestone New Normal Cosmic rate paper 02/08/2016 11:08 AM
11667 uBooNE Detector Physics Task New Normal Get ADC to charge conversion from crossing tracks 02/08/2016 11:35 AM
9898 uBooNE Detector Physics Milestone New Normal Purity Paper 02/08/2016 11:05 AM
11675 uBooNE Detector Physics Task New Normal Apply space charge correction if necessary 02/08/2016 11:44 AM
8858 uBoone Operations Support New Normal Calibration Monitoring Ben Carls 05/18/2015 01:52 PM
8859 uBoone Operations Support New Normal Cryogenics Monitoring Ben Carls 05/18/2015 01:54 PM
8721 uBoone Operations Necessary Maintenance New Normal Dress cables in back of uboonedaq-seb-02 Eric Church 05/12/2015 02:10 PM
8802 uBoone Operations Necessary Maintenance New High Investigate separation of test stand NIM logic and beam timing NIM logic in DAQ room Georgia Karagiorgi 05/14/2015 02:43 PM
8743 uBoone Operations Necessary Maintenance New Normal Write up summary and conclusions from mock TPC tests at DAB Jonathan Asaadi 05/15/2015 06:31 AM
8741 uBoone Operations Necessary Maintenance New Normal Set up control room computer screens Joseph Zennamo 05/19/2015 10:13 AM
8764 uBoone Operations Necessary Maintenance New Normal Determine detailed samples to be taken with muon counter system Matthew Bass 05/12/2015 03:45 PM
8111 uBoone Operations Necessary Maintenance New Normal Remove 1kHz GIZMO stimulation signal Matthew Toups 05/12/2015 03:01 PM
8840 uBoone Operations Necessary Maintenance New High Grating platform Matthew Toups 05/18/2015 09:48 AM
8834 uBoone Operations Idea New Normal KeyBox at LArTf or control room for the UV laser Matthew Toups 05/18/2015 06:34 AM
8724 uBoone Operations Necessary Maintenance New Normal Purchase power plug adapter for network switches in racks on LArTF platform Matthew Toups 05/12/2015 02:20 PM
8839 uBoone Operations Necessary Maintenance New Normal Assign permanent port numbers to the rs232 connection Matthias Luethi 05/18/2015 09:58 AM
8728 uBoone Operations Necessary Maintenance New Normal Write procedure to power down Drift HV rack Sarah Lockwitz 05/12/2015 03:00 PM
8746 uBoone Operations Necessary Maintenance New Normal Connect HV drift cable from cryostat to filter pot Sarah Lockwitz 05/12/2015 03:07 PM
8747 uBoone Operations Necessary Maintenance New Normal Establish final length of HV drift cable Sarah Lockwitz 05/12/2015 03:08 PM
9023 uBoone Operations Bug New High investigate high Wiener internal temperatures in PL508 (CrateRails) supplies Sowjanya Gollapinni 06/03/2015 11:47 AM
8864 uBoone Operations Support New Normal Slow Control Monitoring Sowjanya Gollapinni 05/18/2015 02:08 PM
9036 uBoone Operations Bug New Normal update the /home/uboonedaq/ directory on glomation-sbc-4 Sowjanya Gollapinni 06/04/2015 12:01 AM
8745 uBoone Operations Necessary Maintenance New Normal Connect PMT HV cables to PMT HV modules Taritree Wongjirad 05/12/2015 03:05 PM
8762 uBoone Operations Necessary Maintenance New Normal Populate PMT system NIM bin with appropriate modules Taritree Wongjirad 05/12/2015 03:42 PM
8726 uBoone Operations Necessary Maintenance New Normal Install fan above PMT flange Taritree Wongjirad 05/12/2015 02:23 PM
8734 uBoone Operations Necessary Maintenance New Normal PMT HV modules need to be labelled Taritree Wongjirad 05/12/2015 02:49 PM
8731 uBoone Operations Necessary Maintenance New Normal Label cable from PMT/laser interlock box to PMT HV interlock input Taritree Wongjirad 05/12/2015 02:35 PM
8841 uBoone Operations Necessary Maintenance New Normal GUI laser Thomas Strauss 05/18/2015 09:58 AM
8799 uBoone Operations Necessary Maintenance New Normal Understand operations of liquid level probes Tia Miceli 05/14/2015 03:22 PM
8857 uBoone Operations Support New Normal Beam Monitoring Tia Miceli 05/18/2015 01:51 PM
8800 uBoone Operations Necessary Maintenance New High Investigate and eliminate source of zig zag noise in the detector Tia Miceli 05/14/2015 03:22 PM
8831 uBoone Operations Necessary Maintenance New Normal Exercise full readout test with UV laser (all seb's) to confirm functionality of laser 1 & 2 Wesley Ketchum 05/18/2015 06:27 AM
8725 uBoone Operations Necessary Maintenance New Normal Determine operational requirements for TPC flange FT heaters 05/12/2015 02:21 PM
9082 uBoone Operations Feature New Normal Improvements to Alarm Area Panel and Alarm Tree for improved status visibility 06/09/2015 03:41 PM
8801 uBoone Operations Necessary Maintenance New High Investigate the use of anti-static mats on the platform 05/14/2015 02:37 PM
8753 uBoone Operations Necessary Maintenance New Normal Spare Wiener PL508 power supplies need to be load-tested 05/12/2015 03:15 PM
8739 uBoone Operations Necessary Maintenance New Normal Remove HV filter boxes from back of MPod 05/12/2015 02:57 PM
7700 uBoone Operations Necessary Maintenance New Normal Specify voltage and supply needed for field cage ring 01/28/2015 01:58 PM
9002 uBoone Operations Necessary Maintenance New Normal Submit EDR, get appoval 06/02/2015 05:43 AM
8742 uBoone Operations Necessary Maintenance New Normal Write up summary and conclusions from remote viewing inside cryostat 05/12/2015 03:03 PM
8738 uBoone Operations Necessary Maintenance New Normal Develop Cryo Display in ROC-W 05/12/2015 02:54 PM
8736 uBoone Operations Necessary Maintenance New Normal MPod HV modules need to be labelled 05/12/2015 02:50 PM
8767 uBoone Operations Necessary Maintenance New Normal Relabel uboonedaq-seb-02 05/12/2015 05:44 PM
8757 uBoone Operations Necessary Maintenance New Normal Mpod LV module need to be tested 05/12/2015 03:25 PM
8735 uBoone Operations Necessary Maintenance New Normal MPod LV modules need to be labelled 05/12/2015 02:49 PM
8759 uBoone Operations Necessary Maintenance New Normal Lexan cover installed over NIM bin in DAQ room 05/12/2015 03:32 PM
8723 uBoone Operations Necessary Maintenance New High Put LArTF network connection on UPS 05/14/2015 02:38 PM
8758 uBoone Operations Necessary Maintenance New Normal Decision about separating Mpod HV and LV modules into different crates 05/12/2015 03:31 PM
8737 uBoone Operations Necessary Maintenance New High Hardware history database 05/14/2015 02:37 PM
9653 uBoone Operations Feature New Normal Install more powerful fan pack from PMT HV crate 07/16/2015 03:45 PM
8756 uBoone Operations Necessary Maintenance New Normal MPod HV modules need to be tested 05/12/2015 03:20 PM
14831 uBooNE Production Production Request New Urgent MCC7 in time CORSIKA samples 12/16/2016 09:52 AM
13425 uBooNE Reconstruction Task New Normal Shower Reconstruction - OpenCV tasks Ariana Hackenburg 09/01/2016 04:54 PM
13413 uBooNE Reconstruction Task New Normal Integration of wire-cell into the LArSoft reconstruction chain Brett Viren 08/02/2016 06:20 PM
13415 uBooNE Reconstruction Task New Normal Integration of linecluster/trajcluster into the LArSoft reconstruction chain Bruce Baller 09/13/2016 02:00 PM
13638 uBooNE Reconstruction Task New Normal sample re-processing with updated hit-finder thresholds David Caratelli 09/20/2016 03:49 PM
13475 uBooNE Reconstruction Task New Normal Improved 3D SpacePoints Jack Weston 11/04/2016 11:13 AM
13470 uBooNE Reconstruction Task New Normal Scoring of vertex candidates Jack Weston 11/04/2016 11:12 AM
13426 uBooNE Reconstruction Task New Normal Track Reconstruction - Pandora tasks John Marshall 11/04/2016 11:13 AM
13473 uBooNE Reconstruction Task New Normal Particle (esp. shower) merging John Marshall 11/04/2016 11:11 AM
13471 uBooNE Reconstruction Task New Normal Track vs. shower classification John Marshall 11/04/2016 11:11 AM
13428 uBooNE Reconstruction Task New Normal Vertex Reconstruction - Pandora tasks John Marshall 11/04/2016 11:12 AM
13420 uBooNE Reconstruction Task New Normal Shower Reconstruction - Pandora tasks John Marshall 11/04/2016 11:11 AM
13469 uBooNE Reconstruction Task New Normal Creation and refinement of vertex candidates Joris De vries 11/04/2016 11:12 AM
13474 uBooNE Reconstruction Task New Normal Missing tracks (fully-enclosed in gap in one view) Lorena Escudero sanchez 11/04/2016 11:13 AM
13419 uBooNE Reconstruction Task New Normal Port LArLite based flash matching into LArSoft Pip Hamilton 08/02/2016 02:44 PM
13418 uBooNE Reconstruction Task New Normal Understand existing optical reconstruction in the Monte Carlo (MCC 7) Pip Hamilton 08/02/2016 02:42 PM
(4401-4500/4629) Per page: 25, 50, 100, 5000

Also available in: Atom CSV PDF