# Project Tracker Status Priority Subject Assignee Updated
18556 ANNIE2-mechanical-design Task New High Design of the new tank lid 01/25/2018 07:34 AM
18940 ANNIE2-mechanical-design Milestone Feedback Normal Identify black sheet material to wrap inner structure Emrah Tiras 02/09/2018 10:56 AM
18573 ANNIE2-mechanical-design Task Work in progress Normal Gd-Safety and procedures (discussion with Angela) Emrah Tiras 02/09/2018 10:50 AM
20349 ANNIE2-mechanical-design Task Assigned Normal Magnetization of the tank Emrah Tiras 07/18/2018 01:37 PM
18561 ANNIE2-mechanical-design Task Work in progress Normal Write TSW Emrah Tiras 06/12/2018 09:18 AM
18554 ANNIE2-mechanical-design Milestone New Normal Decision about the tank top Matthew Wetstein 01/25/2018 07:34 AM
18562 ANNIE2-mechanical-design Task New Normal Draft LAPPD mounting board design 06/12/2018 09:19 AM
18569 ANNIE2-mechanical-design Task New Normal Revise Specification Doc. 06/12/2018 09:18 AM
18572 ANNIE2-mechanical-design Task New Normal Cleanliness and handling strategy 06/12/2018 09:20 AM
18570 ANNIE2-mechanical-design Task New Normal Finalize experimental layout in the hall 12/14/2017 01:39 PM
18939 ANNIE2-mechanical-design Milestone New Normal Identify new tank liner 06/13/2018 01:30 AM
18567 ANNIE2-mechanical-design Task New Normal Finalize design of source calibration system 12/14/2017 01:33 PM
18565 ANNIE2-mechanical-design Task New Normal Final layout of new LAPPD housing 06/12/2018 09:19 AM
18559 ANNIE2-mechanical-design Bug New Normal Holders and Mount Concepts for new 10" PMTs 01/25/2018 07:57 AM
18571 ANNIE2-mechanical-design Task New Normal Finalize design and layout of water system 01/25/2018 07:40 AM
18564 ANNIE2-mechanical-design Task New Normal Separate voltage regulators from ACDCs to separate board 06/12/2018 09:20 AM
18557 ANNIE2-mechanical-design Bug New Normal How to mount the WATCHMAN PMTs 12/14/2017 01:09 PM
18941 ANNIE2-mechanical-design Milestone New Normal Final Review of the Tank Lid design 02/09/2018 09:48 AM
18560 ANNIE2-mechanical-design Task New Normal Figure out how to optically isolate the inner volume 12/14/2017 01:14 PM
18558 ANNIE2-mechanical-design Bug New Normal How to mount the LUX PMTs on the bottom 01/25/2018 07:50 AM
18568 ANNIE2-mechanical-design Task New Normal Finalize design of transparency calibration system 12/14/2017 01:34 PM
18566 ANNIE2-mechanical-design Task New Normal Finalize design of timing calibration system 01/25/2018 07:39 AM
18932 ANNIE2-electronics-readiness Task New Normal Ethernet interface for ACC 02/09/2018 09:13 AM
18931 ANNIE2-electronics-readiness Task New Normal Finish new ACDC-ACC interface firmware 02/09/2018 09:12 AM
18933 ANNIE2-electronics-readiness Task New Normal Firmware upgrades for KOTO boards (2 different trigger schemes) 02/09/2018 09:13 AM
18936 ANNIE2-electronics-design Milestone New Normal Power distribution plan 02/09/2018 09:16 AM
18934 ANNIE2-electronics-design Milestone New Normal Final crate and rack maps 02/09/2018 09:15 AM
18935 ANNIE2-electronics-design Milestone New Normal Rack protection plan 02/09/2018 09:16 AM
18938 ANNIE2-electronics-design Task New Normal Design for separate ACDC voltage regulator board 02/09/2018 09:43 AM
18937 ANNIE2-electronics-design Task New Normal Design the backboard for the LAPPD with ACDC connectors 02/09/2018 09:31 AM
17916 ANNIE2-electronics-design Bug New Normal readACDC after setConfig is all 0 10/31/2017 10:09 AM
18929 ANNIE2-Assembly Task New Normal Functional test of new MRD layers 02/09/2018 09:07 AM
18930 ANNIE2-Assembly Task New Normal In situ calibration of MRD layers 02/09/2018 09:07 AM
18928 ANNIE2-Assembly Task New Normal Finish MRD Refurbishment 02/09/2018 09:06 AM
8856 ANNIE1-veto-installation Milestone New Normal Installation of Veto structure 12/06/2015 10:42 AM
8571 ANNIE1-Staging Milestone New High Tank Manufacture 12/06/2015 11:38 AM
11091 ANNIE1-Staging Milestone New Normal Prototype PMT holder 04/06/2016 11:10 PM
8633 ANNIE1-Staging Task New Normal MRD + veto system testing 04/06/2016 11:09 PM
11077 ANNIE1-Staging Milestone New Normal Liner: collab buy-in, place order 01/12/2016 02:32 AM
8634 ANNIE1-Staging Task New Normal Order materials for PMT structure 04/06/2016 11:09 PM
11100 ANNIE1-Staging Task New Normal Cables for Forward Veto 04/06/2016 11:09 PM
8575 ANNIE1-Planning Task New Normal Contact Stephen Geer about June PAC meeting 05/21/2015 10:07 AM
8629 ANNIE1-Planning Meeting New Normal Run 1 Mechanical Review 01/22/2016 08:51 AM
8638 ANNIE1-Planning Milestone New Normal Complete TSW for ANNIE experiment 12/16/2015 11:56 PM
8630 ANNIE1-Planning Meeting New Normal ANNIE Run 1 Electronics Review 05/06/2015 09:47 AM
8616 ANNIE1-MRD-design Task New Normal Follow up on Fermilab PMTs/Scintillator 06/09/2015 02:02 AM
8615 ANNIE1-MRD-design Task New Normal Arrange to get the Kansas/Syracuse PMTs and scintillator 06/05/2015 06:42 AM
8618 ANNIE1-MRD-design Task New Normal Sign over stewardship of the MRD steel 06/05/2015 06:39 AM
8617 ANNIE1-MRD-design Task New Normal Follow up with NMSU about keeping the MRD Scintillator 12/18/2015 09:22 AM
8572 ANNIE1-mechanical-design Task New Urgent Fermilab approval for tank purchase 06/09/2015 02:01 AM
10201 ANNIE1-mechanical-design Task New Normal Determine how structure and top will be lowered in ANNIE Hall Carrie McGivern 01/19/2016 02:33 PM
10175 ANNIE1-mechanical-design Task New Normal Design of access platform Carrie McGivern 12/06/2015 10:36 AM
10174 ANNIE1-mechanical-design Task New Normal Design of tank top Carrie McGivern 01/12/2016 02:32 AM
10203 ANNIE1-mechanical-design Task New Normal Determine placement of water pump Carrie McGivern 01/12/2016 02:33 AM
10176 ANNIE1-mechanical-design Task New Normal Design of inner strcture Carrie McGivern 01/12/2016 02:31 AM
10170 ANNIE1-mechanical-design Task New Normal Cost out PVC for ANNIE Run I Plan (with plan B) Carrie McGivern 01/12/2016 02:34 AM
10173 ANNIE1-mechanical-design Task New Normal Cost out plastic bag liner, get lead time Matthew Wetstein 12/06/2015 10:33 AM
10171 ANNIE1-mechanical-design Task New Normal Follow up with Steve Dazeley Matthew Wetstein 09/18/2015 12:59 PM
11076 ANNIE1-mechanical-design Task New Normal Final decision on liner specs and estimate 01/12/2016 02:33 AM
8573 ANNIE1-mechanical-design Task New Normal Approval to purchase tank, from IA State Purchasing 05/27/2015 07:54 AM
8854 ANNIE1-mechanical-design Task New Normal Ship the muon veto structure 08/05/2015 11:47 PM
11092 ANNIE1-mechanical-design Task New Normal Finish design of PMT holders 01/22/2016 08:51 AM
8855 ANNIE1-mechanical-design Milestone New Normal Design of veto structure 08/05/2015 11:55 PM
8853 ANNIE1-mechanical-design Task New Normal Water system shipped to FNAL for storage 12/06/2015 10:24 AM
8628 ANNIE1-MCstudies Bug New Normal Optimization of acrylic volume 05/06/2015 09:43 AM
8625 ANNIE1-MCstudies Task New Normal Full MC model with 3D PMTs to study neutron tagging efficiencies 01/25/2018 07:24 AM
8627 ANNIE1-MCstudies Task New Normal SciBooNE driven calculation of skyshine rates 06/04/2015 10:33 AM
8623 ANNIE1-MCstudies Task New Normal Geant-based estimate of beam neutron rates and energies 01/25/2018 07:22 AM
11349 ANNIE1-electronics-design Task New High DAQ board reader TOOL 01/15/2016 08:05 AM
11351 ANNIE1-electronics-design Task Assigned Normal DAQ output TOOL Benjamin Richards 01/15/2016 08:03 AM
11346 ANNIE1-electronics-design Task Resolved Normal DAQ Control systems Benjamin Richards 01/15/2016 08:07 AM
11344 ANNIE1-electronics-design Task Resolved Normal DAQ Jason (lite) messgae passing Benjamin Richards 01/15/2016 08:09 AM
11342 ANNIE1-electronics-design Task Resolved Normal DAQ ZMQ/multicast integration Benjamin Richards 01/15/2016 08:07 AM
11347 ANNIE1-electronics-design Task New Normal DAQ monitoring system Benjamin Richards 01/05/2016 08:21 AM
11343 ANNIE1-electronics-design Task Resolved Normal DAQ Bool functions /status reporting Benjamin Richards 01/15/2016 08:08 AM
10470 ANNIE1-electronics-design Task Resolved Normal Machine pickoff/splitter enclosure Jonathan Eisch 01/12/2016 03:05 PM
10532 ANNIE1-electronics-design Task Assigned Normal Select timing sources Jonathan Eisch 01/25/2018 07:17 AM
10468 ANNIE1-electronics-design Task Assigned Normal Pickoff/splitter enclosure production Jonathan Eisch 04/06/2016 11:13 PM
10534 ANNIE1-electronics-design Task Assigned Normal Determine GPS antenna location at ANNIE Hall Jonathan Eisch 01/25/2018 07:17 AM
10463 ANNIE1-electronics-design Task Assigned Normal HV pickoff/splitter enclosure Jonathan Eisch 04/06/2016 11:13 PM
10449 ANNIE1-electronics-design Task Assigned Normal HV pickoff & signal splitter Jonathan Eisch 04/06/2016 11:14 PM
10456 ANNIE1-electronics-design Task Resolved Normal Test HV resilliance up to 3kV Jonathan Eisch 10/12/2015 02:40 PM
10440 ANNIE1-electronics-design Task Assigned Normal Externally trigger ADC cards Jonathan Eisch 01/25/2018 07:14 AM
10457 ANNIE1-electronics-design Task Assigned Normal Design and build full sized pickoff/splitter board Jonathan Eisch 01/12/2016 03:07 PM
10461 ANNIE1-electronics-design Task Resolved Normal Full sized pickoff/splitter board population Jonathan Eisch 01/12/2016 03:07 PM
10533 ANNIE1-electronics-design Task Assigned Normal Determine the suitability of GPS timing reference Jonathan Eisch 01/25/2018 07:17 AM
10509 ANNIE1-electronics-design Task Assigned Normal Attach bulkhead connectors and pcb mounting hardware Jonathan Eisch 04/06/2016 11:13 PM
10510 ANNIE1-electronics-design Task Assigned Normal Mount pickoff/splitter pcb in enclosure, solder wires to bulkhead connectors Jonathan Eisch 04/06/2016 11:09 PM
10442 ANNIE1-electronics-design Task Resolved Normal Throughput testing for ADC cards Jonathan Eisch 10/22/2015 01:40 PM
8811 ANNIE1-electronics-design Task Resolved Normal Figure out the data rates and size of output from the system Jonathan Eisch 10/22/2015 01:38 PM
10443 ANNIE1-electronics-design Task Assigned Normal Make readout methods (to be used by artdaq) Jonathan Eisch 01/25/2018 07:16 AM
9086 ANNIE1-electronics-design Task Assigned Normal Contact Zarko Pavlovic about beam timing signals. Jonathan Eisch 06/10/2015 10:48 AM
8813 ANNIE1-electronics-design Task Assigned Normal Design for clock distribution and timing Jonathan Eisch 01/25/2018 07:15 AM
9090 ANNIE1-electronics-design Feature Assigned Normal UC ADC user manual Jonathan Eisch 01/25/2018 07:14 AM
9089 ANNIE1-electronics-design Task Assigned Normal UC ADC cards Jonathan Eisch 01/25/2018 07:16 AM
10535 ANNIE1-electronics-design Task New Normal Select and buy a suitable GPS receiver Jonathan Eisch 01/25/2018 07:16 AM
10530 ANNIE1-electronics-design Task Assigned Normal Timing distribution system Jonathan Eisch 01/25/2018 07:17 AM
10543 ANNIE1-electronics-design Task Resolved Normal Check availability of local timing references Jonathan Eisch 11/02/2015 01:31 PM
8808 ANNIE1-electronics-design Task New Normal Get details of what we can get from the beam spill and timing Jonathan Eisch 06/10/2015 10:48 AM
8809 ANNIE1-electronics-design Task Assigned Normal Interface for PSEC electronics with ART system Karen Hayrapetyan 10/09/2015 01:06 PM