# Project Tracker Status Priority Subject Assignee Updated
18424 Spack Planning Milestone Accepted Normal Produce a set of automated tests of the ecosystem to guard against regressions introduced during continued development of its constituent tools. 08/27/2018 10:31 AM
18423 Spack Planning Milestone Accepted Normal Demonstrate the ability to install easily and maintain and use a workable installation of multiple release distributions. 08/27/2018 10:31 AM
18422 Spack Planning Milestone Accepted Normal When building releases against multiple compilers, avoid unnecessary duplica- tion of installations of non-architecture- or non-compiler-dependent products. 08/27/2018 10:31 AM
18421 Spack Planning Milestone Accepted Normal Clean up an old release distribution while retaining those products that are required by other releases. 08/27/2018 10:31 AM
18420 Spack Planning Milestone Accepted Normal Produce a release distribution utilizing debug variants of art suite and selected third party products. 08/27/2018 10:31 AM
18419 Spack Planning Milestone Accepted Normal Select and use one of two available versions of a release distribution. 08/27/2018 10:31 AM
18418 Spack Planning Milestone Accepted Normal Select and use one of two available variants of a release distribution. 08/27/2018 10:31 AM
18417 Spack Planning Milestone Accepted Normal Produce a full distribution built using the Jenkins facility, and successful use thereof. 08/27/2018 10:31 AM
18416 Spack Planning Milestone Accepted Normal Produce usable relocatable UPS tarballs for products built using Spack and Spack- dev. 08/27/2018 10:31 AM
18415 Spack Planning Milestone Accepted Normal Produce a successful Spackdev build of critic, passing all tests, using art and gallery as installed and relocated. 08/27/2018 10:31 AM
18414 Spack Planning Milestone Accepted Normal Produce a successful Spackdev build of the art and gallery suites passing all tests. 08/27/2018 10:31 AM
18413 Spack Planning Milestone Accepted Normal Produce a successful Spack build of the art and gallery suites passing all tests. 08/27/2018 10:31 AM
18412 Spack Planning Milestone Accepted Normal Demonstrate successful use of interactive Root after relocation. 08/27/2018 10:31 AM
18411 Spack Planning Milestone Accepted Normal Produce a Spack-based distribution of the canvas product stack art-precursor distribution on both toolchains and both platforms mentioned above. 08/27/2018 10:31 AM
18410 Spack Planning Milestone Accepted Normal Use successfully a non-trivial product relocated to a system where a dependency is a virtual package whose definition and/or location has changed. 08/27/2018 10:31 AM
18409 Spack Planning Milestone Accepted Normal Use successfully a non-trivial product relocated to a system with a materially different pacakges.yaml. 08/27/2018 10:31 AM
18408 Spack Planning Milestone Accepted Normal Set up multiple products for use by referring directly only to an umbrella product. 08/27/2018 10:31 AM
18406 Spack Planning Milestone Accepted Normal Configure the current environment to be able to use a product. 08/27/2018 10:31 AM
18399 Spack Planning Milestone Accepted Normal Build a small set of products, move and then build a new product against them. 08/27/2018 10:31 AM
18397 Spack Planning Milestone Accepted Normal Build an empty product that has only dependencies. 08/27/2018 10:31 AM
18396 Spack Planning Milestone Accepted Normal Build a basic tool stack comprising two distinct toolchains (discounting native compiler) on one Linux and one MacOS platform. 08/27/2018 10:31 AM
18340 Linux on MVME8100 Milestone New Normal Linux Kernel booting on the MVME8100 11/20/2017 09:49 AM
18157 Continuous Integration (CI) Milestone New Normal On board mu2e 05/30/2018 11:18 AM
17719 adinstbpm Milestone New Normal Booster operational test of one crate alongside existing BPM system 12/29/2017 11:08 AM
17544 FermilabTestBeam Milestone New Normal Create FTBF "Facility DAQ" 08/21/2017 10:07 AM
17543 FermilabTestBeam Milestone New Normal otsdaq Code Review 08/21/2017 10:05 AM
17542 FermilabTestBeam Milestone New Normal Review and Expand tutorials 08/21/2017 10:04 AM
17541 FermilabTestBeam Milestone New Normal Integrate FTBF Detectors into single otsdaq instance 08/21/2017 10:02 AM
17338 LArSoft Milestone Accepted Normal Phase 3 Tracking Data Product 01/09/2018 02:42 PM
16931 Off-the-Shelf DAQ Milestone New Normal Tutorial on how to use Slow Controls 11/10/2020 12:53 PM
16930 Off-the-Shelf DAQ Milestone New Normal Tutorial on how to use artdaq 06/19/2017 03:35 PM
16929 Off-the-Shelf DAQ Milestone Resolved Normal Tutorial on how to clone the otsdaq_demo repository 01/21/2021 10:57 AM
16914 Off-the-Shelf DAQ Milestone New Normal Tutorial on how to make Web APP 06/19/2017 03:34 PM
16907 Off-the-Shelf DAQ Milestone New Normal Custom FE Interface Tutorial 06/19/2017 02:51 PM
16852 Mu2e FMS Milestone New Normal Integration of DAQ 06/13/2017 04:57 PM
16842 Mu2e FMS Milestone New Normal Integration of Data Processing 06/13/2017 04:39 PM
16570 VME BPM Milestone New Normal Improvements for auto-tune operation 05/17/2017 10:30 AM
16536 Instrumentation Drivers Milestone New Normal Submit network connection request 05/15/2017 02:09 PM
16535 Instrumentation Drivers Milestone New Normal Setup a test crate 05/15/2017 02:09 PM
16534 Instrumentation Drivers Milestone New Normal Driver for 12-channel NML Timing Board 05/15/2017 02:10 PM
16524 VME Intensity Monitor Milestone New Normal Commission new toroid nodes at NML 07/11/2017 07:22 PM
14212 Continuous Integration (CI) Milestone New Normal On-board GlideinWMS project 08/09/2017 10:24 AM
13412 uBooNE Reconstruction Milestone New Normal Final Object Selection 08/02/2016 02:25 PM
13411 uBooNE Reconstruction Milestone New Normal Reconstruction workflow 08/02/2016 02:24 PM
13410 uBooNE Reconstruction Milestone New Normal Hit Finding 11/01/2016 11:26 AM
13409 uBooNE Reconstruction Milestone New Normal Cosmic Ray Tagger reconstruction 08/02/2016 02:22 PM
13408 uBooNE Reconstruction Milestone New Normal Cosmic Ray tagging for use in reconstruction 08/02/2016 02:21 PM
13407 uBooNE Reconstruction Milestone New Normal Track Reconstruction 11/04/2016 11:13 AM
13406 uBooNE Reconstruction Milestone New Normal Vertex Reconstruction 11/04/2016 11:12 AM
13405 uBooNE Reconstruction Milestone New Normal Shower Reconstruction 11/04/2016 11:11 AM
13404 uBooNE Reconstruction Milestone New Normal Optical Reconstruction 08/02/2016 02:44 PM
13403 uBooNE Reconstruction Milestone New Normal Alternate Reconstruction Paths 10/21/2016 11:01 AM
13402 uBooNE Reconstruction Milestone New Normal Reconstruction validation 08/02/2016 02:08 PM
13401 uBooNE Reconstruction Milestone New Normal Reconstruction Tuning 08/02/2016 02:07 PM
13400 uBooNE Reconstruction Milestone New Normal MCC8 and "v6" reconstruction development 11/04/2016 11:13 AM
13399 uBooNE Reconstruction Milestone New Normal Parent reconstruction milestones/tasks for reconstruction necessary for MCC8 and reconstruction "v6" 11/04/2016 11:13 AM
13397 GlideinWMS Milestone New Normal Investigate the use of condor_annex to provision bulk resources with GlideinWMS 02/14/2021 08:05 PM
13283 ubpm Milestone New Normal Establish Test Stand 07/19/2016 11:36 AM
13179 Continuous Integration (CI) Milestone New Normal On-board art project 12/04/2017 05:37 PM
12885 Protocol Compiler Milestone New Normal Retire support for Objective-C 06/08/2016 01:19 PM
12655 Continuous Integration (CI) Milestone New High On-board no-LArSoft based experiments/collaborations/projects that make the request 12/04/2017 05:37 PM
12652 Continuous Integration (CI) Milestone New High On-board in the Continuous Intengration project all projects/collaborations/experiments that make the request. 12/04/2017 05:37 PM
12610 Production Operations Management Service (POMS) Milestone Assigned High On-board IF experiments to use POMS. 10/10/2018 11:32 AM
12416 inst-bpm Milestone New Normal PXIE BPM Test Node 04/29/2016 11:14 AM
12415 inst-bpm Milestone New Normal PXIE BPM Deployment 04/29/2016 11:14 AM
12389 Instrumentation Drivers Milestone New Normal Driver for CMTF Interlocks ADC 04/26/2016 04:36 PM
12190 VME Intensity Monitor Milestone New Normal Turn of tracing for ACNET tasks 04/06/2016 04:11 PM
11965 VME Intensity Monitor Milestone New High April Release - 201604A 09/04/2018 01:01 PM
11850 GlideinWMS Milestone New Normal Collect service performance stats every iteration for Factory & Frontend 02/14/2021 08:05 PM
11636 uBooNE Reconstruction Milestone Accepted Normal Improve reconstruction speed by 2x 02/05/2016 09:40 AM
11400 Cosmogenics Milestone New Normal List of analysis 01/25/2016 04:47 PM
11263 uBooNE Reconstruction Milestone New Normal Production shower finding 08/02/2016 01:31 PM
11262 uBooNE Reconstruction Milestone Resolved High March production reconstruction 08/02/2016 01:56 PM
11098 ANNIE1-Commissioning Milestone New Normal Final ORC review 01/25/2018 07:20 AM
11096 ANNIE1-Assembly Milestone New Normal Prelim ORC inspection 04/06/2016 11:12 PM
11094 ANNIE1-Assembly Milestone New Normal Cut top of tank 12/06/2015 12:08 PM
11091 ANNIE1-Staging Milestone New Normal Prototype PMT holder 04/06/2016 11:10 PM
11086 ANNIE1-Assembly Milestone New Normal Cabling of the installed tank 04/06/2016 11:08 PM
11085 ANNIE1-Assembly Milestone New Normal NCV shipped to FNAL 04/06/2016 11:08 PM
11083 ANNIE1-Assembly Milestone New Normal Lower inner structure into tank at ANNIE Hall 04/06/2016 11:11 PM
11077 ANNIE1-Staging Milestone New Normal Liner: collab buy-in, place order 01/12/2016 02:32 AM
10540 uBooNE Detector Physics Milestone Assigned Normal Space Charge Measurement Paper 02/22/2016 02:00 PM
9904 uBooNE Detector Physics Milestone Assigned Normal Diffusion paper 02/22/2016 01:58 PM
9900 uBooNE Detector Physics Milestone New Normal Cosmic rate paper 02/08/2016 11:08 AM
9898 uBooNE Detector Physics Milestone New Normal Purity Paper 02/08/2016 11:05 AM
9388 VME Intensity Monitor Milestone New Normal 2015 Shutdown 09/04/2018 01:03 PM
9097 dcpower Milestone New Normal Cover off 08/04/2015 11:38 AM
8856 ANNIE1-veto-installation Milestone New Normal Installation of Veto structure 12/06/2015 10:42 AM
8855 ANNIE1-mechanical-design Milestone New Normal Design of veto structure 08/05/2015 11:55 PM
8816 ANNIE1-electronics-design Milestone New Normal What is our calibration system? 01/25/2018 07:13 AM
8638 ANNIE1-Planning Milestone New Normal Complete TSW for ANNIE experiment 12/16/2015 11:56 PM
8637 ANNIE1-Assembly Milestone New Normal Installation of plastic liner 04/06/2016 11:07 PM
8631 ANNIE1-Assembly Milestone New Normal Lowering the tank in ANNIE Hall 04/06/2016 11:12 PM
8571 ANNIE1-Staging Milestone New High Tank Manufacture 12/06/2015 11:38 AM
5803 LBNE Software And Computing DOE Review 2014 Milestone New Normal First assembly of the document package 04/01/2014 06:15 PM
5257 MicroBooNE ARGO Milestone New Normal Argo "client"/control room workstation 01/24/2014 11:35 AM
5256 MicroBooNE ARGO Milestone New Normal Argo Server 01/24/2014 11:34 AM
4989 GlideinWMS Milestone Feedback Normal "Why is my job not running"? 02/14/2021 08:04 PM
3813 Synergia2 Milestone Resolved Normal Beta 1 05/07/2013 11:22 AM
1332 MILC Layout Milestone New Normal New layout is done 05/29/2011 05:31 PM