Project

General

Profile

Issues

Filters

Apply Clear

# Project Tracker Status Priority Subject Assignee Updated
11348 ANNIE1-electronics-design Task New Normal Postgress setup 01/05/2016 08:22 AM
8628 ANNIE1-MCstudies Bug New Normal Optimization of acrylic volume 05/06/2015 09:43 AM
8623 ANNIE1-MCstudies Task New Normal Geant-based estimate of beam neutron rates and energies 01/25/2018 07:22 AM
8627 ANNIE1-MCstudies Task New Normal SciBooNE driven calculation of skyshine rates 06/04/2015 10:33 AM
8625 ANNIE1-MCstudies Task New Normal Full MC model with 3D PMTs to study neutron tagging efficiencies 01/25/2018 07:24 AM
8855 ANNIE1-mechanical-design Milestone New Normal Design of veto structure 08/05/2015 11:55 PM
8853 ANNIE1-mechanical-design Task New Normal Water system shipped to FNAL for storage 12/06/2015 10:24 AM
11092 ANNIE1-mechanical-design Task New Normal Finish design of PMT holders 01/22/2016 08:51 AM
8572 ANNIE1-mechanical-design Task New Urgent Fermilab approval for tank purchase 06/09/2015 02:01 AM
8854 ANNIE1-mechanical-design Task New Normal Ship the muon veto structure 08/05/2015 11:47 PM
10173 ANNIE1-mechanical-design Task New Normal Cost out plastic bag liner, get lead time Matthew Wetstein 12/06/2015 10:33 AM
10174 ANNIE1-mechanical-design Task New Normal Design of tank top Carrie McGivern 01/12/2016 02:32 AM
10176 ANNIE1-mechanical-design Task New Normal Design of inner strcture Carrie McGivern 01/12/2016 02:31 AM
10171 ANNIE1-mechanical-design Task New Normal Follow up with Steve Dazeley Matthew Wetstein 09/18/2015 12:59 PM
10201 ANNIE1-mechanical-design Task New Normal Determine how structure and top will be lowered in ANNIE Hall Carrie McGivern 01/19/2016 02:33 PM
10203 ANNIE1-mechanical-design Task New Normal Determine placement of water pump Carrie McGivern 01/12/2016 02:33 AM
10170 ANNIE1-mechanical-design Task New Normal Cost out PVC for ANNIE Run I Plan (with plan B) Carrie McGivern 01/12/2016 02:34 AM
8573 ANNIE1-mechanical-design Task New Normal Approval to purchase tank, from IA State Purchasing 05/27/2015 07:54 AM
11076 ANNIE1-mechanical-design Task New Normal Final decision on liner specs and estimate 01/12/2016 02:33 AM
10175 ANNIE1-mechanical-design Task New Normal Design of access platform Carrie McGivern 12/06/2015 10:36 AM
8617 ANNIE1-MRD-design Task New Normal Follow up with NMSU about keeping the MRD Scintillator 12/18/2015 09:22 AM
8618 ANNIE1-MRD-design Task New Normal Sign over stewardship of the MRD steel 06/05/2015 06:39 AM
8616 ANNIE1-MRD-design Task New Normal Follow up on Fermilab PMTs/Scintillator 06/09/2015 02:02 AM
8615 ANNIE1-MRD-design Task New Normal Arrange to get the Kansas/Syracuse PMTs and scintillator 06/05/2015 06:42 AM
8630 ANNIE1-Planning Meeting New Normal ANNIE Run 1 Electronics Review 05/06/2015 09:47 AM
8629 ANNIE1-Planning Meeting New Normal Run 1 Mechanical Review 01/22/2016 08:51 AM
8638 ANNIE1-Planning Milestone New Normal Complete TSW for ANNIE experiment 12/16/2015 11:56 PM
8575 ANNIE1-Planning Task New Normal Contact Stephen Geer about June PAC meeting 05/21/2015 10:07 AM
11091 ANNIE1-Staging Milestone New Normal Prototype PMT holder 04/06/2016 11:10 PM
8571 ANNIE1-Staging Milestone New High Tank Manufacture 12/06/2015 11:38 AM
11077 ANNIE1-Staging Milestone New Normal Liner: collab buy-in, place order 01/12/2016 02:32 AM
11100 ANNIE1-Staging Task New Normal Cables for Forward Veto 04/06/2016 11:09 PM
8634 ANNIE1-Staging Task New Normal Order materials for PMT structure 04/06/2016 11:09 PM
8633 ANNIE1-Staging Task New Normal MRD + veto system testing 04/06/2016 11:09 PM
8856 ANNIE1-veto-installation Milestone New Normal Installation of Veto structure 12/06/2015 10:42 AM
18930 ANNIE2-Assembly Task New Normal In situ calibration of MRD layers 02/09/2018 09:07 AM
18928 ANNIE2-Assembly Task New Normal Finish MRD Refurbishment 02/09/2018 09:06 AM
18929 ANNIE2-Assembly Task New Normal Functional test of new MRD layers 02/09/2018 09:07 AM
17916 ANNIE2-electronics-design Bug New Normal readACDC after setConfig is all 0 10/31/2017 10:09 AM
18935 ANNIE2-electronics-design Milestone New Normal Rack protection plan 02/09/2018 09:16 AM
18936 ANNIE2-electronics-design Milestone New Normal Power distribution plan 02/09/2018 09:16 AM
18934 ANNIE2-electronics-design Milestone New Normal Final crate and rack maps 02/09/2018 09:15 AM
18938 ANNIE2-electronics-design Task New Normal Design for separate ACDC voltage regulator board 02/09/2018 09:43 AM
18937 ANNIE2-electronics-design Task New Normal Design the backboard for the LAPPD with ACDC connectors 02/09/2018 09:31 AM
18932 ANNIE2-electronics-readiness Task New Normal Ethernet interface for ACC 02/09/2018 09:13 AM
18933 ANNIE2-electronics-readiness Task New Normal Firmware upgrades for KOTO boards (2 different trigger schemes) 02/09/2018 09:13 AM
18931 ANNIE2-electronics-readiness Task New Normal Finish new ACDC-ACC interface firmware 02/09/2018 09:12 AM
18559 ANNIE2-mechanical-design Bug New Normal Holders and Mount Concepts for new 10" PMTs 01/25/2018 07:57 AM
18557 ANNIE2-mechanical-design Bug New Normal How to mount the WATCHMAN PMTs 12/14/2017 01:09 PM
18558 ANNIE2-mechanical-design Bug New Normal How to mount the LUX PMTs on the bottom 01/25/2018 07:50 AM
(151-200/4596) Per page: 25, 50, 100, 5000

Also available in: Atom CSV PDF