  ANNIE1-mechanical-design 7 Collapse all/Expand all
11076 ANNIE1-mechanical-design Task New Final decision on liner specs and estimate Matthew Wetstein 01/12/2016 02:33 AM
11092 ANNIE1-mechanical-design Task New Finish design of PMT holders Matthew Wetstein 01/22/2016 08:51 AM
8854 ANNIE1-mechanical-design Task New Ship the muon veto structure Matthew Wetstein 08/05/2015 11:47 PM
8853 ANNIE1-mechanical-design Task New Water system shipped to FNAL for storage Matthew Wetstein 12/06/2015 10:24 AM
  ANNIE1-MRD-design 4 Collapse all/Expand all
8615 ANNIE1-MRD-design Task New Arrange to get the Kansas/Syracuse PMTs and scintillator Matthew Wetstein 06/05/2015 06:42 AM
8616 ANNIE1-MRD-design Task New Follow up on Fermilab PMTs/Scintillator Matthew Wetstein 06/09/2015 02:02 AM
8617 ANNIE1-MRD-design Task New Follow up with NMSU about keeping the MRD Scintillator Matthew Wetstein 12/18/2015 09:22 AM
8618 ANNIE1-MRD-design Task New Sign over stewardship of the MRD steel Matthew Wetstein 06/05/2015 06:39 AM
  ANNIE1-Planning 4 Collapse all/Expand all
8630 ANNIE1-Planning Meeting New ANNIE Run 1 Electronics Review Matthew Wetstein 05/06/2015 09:47 AM
8638 ANNIE1-Planning Milestone New Complete TSW for ANNIE experiment Matthew Wetstein 12/16/2015 11:56 PM
8575 ANNIE1-Planning Task New Contact Stephen Geer about June PAC meeting Matthew Wetstein 05/21/2015 10:07 AM
8629 ANNIE1-Planning Meeting New Run 1 Mechanical Review Matthew Wetstein 01/22/2016 08:51 AM
  ANNIE1-Staging 6 Collapse all/Expand all
11100 ANNIE1-Staging Task New Cables for Forward Veto Matthew Wetstein 04/06/2016 11:09 PM
11077 ANNIE1-Staging Milestone New Liner: collab buy-in, place order Matthew Wetstein 01/12/2016 02:32 AM
8633 ANNIE1-Staging Task New MRD + veto system testing Matthew Wetstein 04/06/2016 11:09 PM
8634 ANNIE1-Staging Task New Order materials for PMT structure Matthew Wetstein 04/06/2016 11:09 PM
11091 ANNIE1-Staging Milestone New Prototype PMT holder Matthew Wetstein 04/06/2016 11:10 PM
8571 ANNIE1-Staging Milestone New Tank Manufacture Matthew Wetstein 12/06/2015 11:38 AM
  ANNIE1-veto-installation 1 Collapse all/Expand all
8856 ANNIE1-veto-installation Milestone New Installation of Veto structure Matthew Wetstein 12/06/2015 10:42 AM
  ANNIE2-Assembly 3 Collapse all/Expand all
18928 ANNIE2-Assembly Task New Finish MRD Refurbishment Matthew Wetstein 02/09/2018 09:06 AM
18929 ANNIE2-Assembly Task New Functional test of new MRD layers Matthew Wetstein 02/09/2018 09:07 AM
18930 ANNIE2-Assembly Task New In situ calibration of MRD layers Matthew Wetstein 02/09/2018 09:07 AM
  ANNIE2-electronics-design 6 Collapse all/Expand all
18938 ANNIE2-electronics-design Task New Design for separate ACDC voltage regulator board Matthew Wetstein 02/09/2018 09:43 AM
18937 ANNIE2-electronics-design Task New Design the backboard for the LAPPD with ACDC connectors Matthew Wetstein 02/09/2018 09:31 AM
18934 ANNIE2-electronics-design Milestone New Final crate and rack maps Matthew Wetstein 02/09/2018 09:15 AM
18936 ANNIE2-electronics-design Milestone New Power distribution plan Matthew Wetstein 02/09/2018 09:16 AM
18935 ANNIE2-electronics-design Milestone New Rack protection plan Matthew Wetstein 02/09/2018 09:16 AM
17916 ANNIE2-electronics-design Bug New readACDC after setConfig is all 0 Miles Lucas 10/31/2017 10:09 AM
  ANNIE2-electronics-readiness 3 Collapse all/Expand all
18932 ANNIE2-electronics-readiness Task New Ethernet interface for ACC Matthew Wetstein 02/09/2018 09:13 AM
18931 ANNIE2-electronics-readiness Task New Finish new ACDC-ACC interface firmware Matthew Wetstein 02/09/2018 09:12 AM
18933 ANNIE2-electronics-readiness Task New Firmware upgrades for KOTO boards (2 different trigger schemes) Matthew Wetstein 02/09/2018 09:13 AM
  ANNIE2-mechanical-design 17 Collapse all/Expand all
18572 ANNIE2-mechanical-design Task New Cleanliness and handling strategy Emrah Tiras 06/12/2018 09:20 AM
18556 ANNIE2-mechanical-design Task New Design of the new tank lid Matthew Wetstein 01/25/2018 07:34 AM
18562 ANNIE2-mechanical-design Task New Draft LAPPD mounting board design Matthew Wetstein 06/12/2018 09:19 AM
18560 ANNIE2-mechanical-design Task New Figure out how to optically isolate the inner volume Matthew Wetstein 12/14/2017 01:14 PM
18571 ANNIE2-mechanical-design Task New Finalize design and layout of water system Matthew Wetstein 01/25/2018 07:40 AM
18567 ANNIE2-mechanical-design Task New Finalize design of source calibration system Matthew Wetstein 12/14/2017 01:33 PM
18566 ANNIE2-mechanical-design Task New Finalize design of timing calibration system Matthew Wetstein 01/25/2018 07:39 AM
18568 ANNIE2-mechanical-design Task New Finalize design of transparency calibration system Matthew Wetstein 12/14/2017 01:34 PM
18570 ANNIE2-mechanical-design Task New Finalize experimental layout in the hall Matthew Wetstein 12/14/2017 01:39 PM
18565 ANNIE2-mechanical-design Task New Final layout of new LAPPD housing Matthew Wetstein 06/12/2018 09:19 AM
18941 ANNIE2-mechanical-design Milestone New Final Review of the Tank Lid design Matthew Wetstein 02/09/2018 09:48 AM
18559 ANNIE2-mechanical-design Bug New Holders and Mount Concepts for new 10" PMTs Matthew Wetstein 01/25/2018 07:57 AM
18558 ANNIE2-mechanical-design Bug New How to mount the LUX PMTs on the bottom Matthew Wetstein 01/25/2018 07:50 AM
18557 ANNIE2-mechanical-design Bug New How to mount the WATCHMAN PMTs Matthew Wetstein 12/14/2017 01:09 PM
18939 ANNIE2-mechanical-design Milestone New Identify new tank liner Matthew Wetstein 06/13/2018 01:30 AM
18569 ANNIE2-mechanical-design Task New Revise Specification Doc. Emrah Tiras 06/12/2018 09:18 AM
18564 ANNIE2-mechanical-design Task New Separate voltage regulators from ACDCs to separate board Matthew Wetstein 06/12/2018 09:20 AM
  Applications Group 1 Collapse all/Expand all
23351 Applications Group Idea New Reimagining the Parameter Page Beau Harrison 09/30/2019 08:27 AM
  art 244 Collapse all/Expand all
4107 art Feature Closed A candidate function for FHICLCPP Rob Kutschke 10/07/2015 01:52 PM
(151-200/3356) Per page: 25, 50, 100, 5000