22936 AI-for-Accelerators Task New Normal Finalize list of required devices and catalogers 07/12/2019 03:19 PM
22840 AI-for-Accelerators Task New Normal Test full workflow with boards on-hand 06/28/2019 04:38 PM
22842 AI-for-Accelerators Task New Normal Design ACNET input system for the board 06/28/2019 04:39 PM
22946 AI-for-Accelerators Task New Normal Demonstrate dynamic loading of weights without re-flashing the FPGA? 07/15/2019 04:21 PM
22787 AI-for-Accelerators Milestone New Normal Data Products, Part 1 06/20/2019 04:44 PM
22921 AI-for-Accelerators Task New Normal Refine long-term storage estimates 07/11/2019 01:40 PM
24853 ANL Up/Down Converter Builds 2020/2021 Task New Normal Quotes and carts needed for Build of ANL Up/Downconverters 10/01/2020 10:16 AM
21624 ANNIE Support New Low Annie ECL local password removal Arthur Kreymer 01/04/2019 10:52 AM
24151 ANNIE Support New Normal ANNIE 2020 computing request Benjamin Richards 05/06/2020 07:43 AM
21449 ANNIE Support New Normal ANNIE 2019 computing request for SCPMT Mayly Sanchez 11/28/2018 02:56 PM
20572 ANNIE Task New Normal Create tape backed storage area for production reco files Steven Gardiner 08/09/2018 11:11 AM
24080 ANNIE Necessary Maintenance New Normal BNB Downtime 02/21/2020 11:05 AM
24079 ANNIE Necessary Maintenance New Normal BNB Downtime 02/21/2020 10:57 AM
11099 ANNIE1-Assembly Task New Normal Installation of Forward Veto Cabling 04/06/2016 11:07 PM
11079 ANNIE1-Assembly Task New Normal Spot testing of PMTs 04/06/2016 11:05 PM
11078 ANNIE1-Assembly Task New Normal Development of PMT installation procedure 04/06/2016 11:05 PM
11097 ANNIE1-Assembly Bug New Normal Finalize crates and racks 04/06/2016 11:11 PM
11095 ANNIE1-Assembly Task New Normal Populate Crates in Hall 04/06/2016 11:06 PM
11093 ANNIE1-Assembly Task New Normal Modify top of tank, add round offs 01/12/2016 02:36 PM
11094 ANNIE1-Assembly Milestone New Normal Cut top of tank 12/06/2015 12:08 PM
8576 ANNIE1-Assembly Task New Normal Assembly and installation of PMT modules 04/06/2016 11:06 PM
11090 ANNIE1-Assembly Task New Normal PMT cabling and shipping 04/06/2016 11:05 PM
11086 ANNIE1-Assembly Milestone New Normal Cabling of the installed tank 04/06/2016 11:08 PM
8637 ANNIE1-Assembly Milestone New Normal Installation of plastic liner 04/06/2016 11:07 PM
11085 ANNIE1-Assembly Milestone New Normal NCV shipped to FNAL 04/06/2016 11:08 PM
8577 ANNIE1-Assembly Task New Normal Water fill 01/25/2018 07:11 AM
11084 ANNIE1-Assembly Task New Normal Construction of NCV 04/06/2016 11:07 PM
11083 ANNIE1-Assembly Milestone New Normal Lower inner structure into tank at ANNIE Hall 04/06/2016 11:11 PM
11096 ANNIE1-Assembly Milestone New Normal Prelim ORC inspection 04/06/2016 11:12 PM
8631 ANNIE1-Assembly Milestone New Normal Lowering the tank in ANNIE Hall 04/06/2016 11:12 PM
11082 ANNIE1-Assembly Task New Normal Access Platform: construction and installation 04/06/2016 11:11 PM
11089 ANNIE1-Assembly Task New Normal Set up water skid and recirculation system 01/25/2018 07:20 AM
11081 ANNIE1-Assembly Task New Normal Practice lower inner structure into tank 04/06/2016 11:06 PM
11080 ANNIE1-Assembly Task New Normal Construction of Inner Structure 01/12/2016 02:29 AM
11098 ANNIE1-Commissioning Milestone New Normal Final ORC review 01/25/2018 07:20 AM
11088 ANNIE1-Commissioning Task New Normal Detector commissioning with water 01/25/2018 07:21 AM
8599 ANNIE1-Commissioning Task New Normal Begin Run1 data taking 01/25/2018 07:11 AM
8600 ANNIE1-Commissioning Task New Normal Dark commissioning of PMTs in ANNIE Hall (no water) 01/25/2018 07:10 AM
11087 ANNIE1-Commissioning Task New Normal DAQ commissioning 01/25/2018 07:10 AM
8636 ANNIE1-Commissioning Task New Normal Installation and commissioning of NCV 01/25/2018 07:11 AM
11347 ANNIE1-electronics-design Task New Normal DAQ monitoring system Benjamin Richards 01/05/2016 08:21 AM
10535 ANNIE1-electronics-design Task New Normal Select and buy a suitable GPS receiver Jonathan Eisch 01/25/2018 07:16 AM
8808 ANNIE1-electronics-design Task New Normal Get details of what we can get from the beam spill and timing Jonathan Eisch 06/10/2015 10:48 AM
8806 ANNIE1-electronics-design Milestone New Normal Redesign of LAPPD central card Matthew Wetstein 10/09/2015 02:12 PM
11349 ANNIE1-electronics-design Task New High DAQ board reader TOOL 01/15/2016 08:05 AM
11348 ANNIE1-electronics-design Task New Normal Postgress setup 01/05/2016 08:22 AM
11345 ANNIE1-electronics-design Task New Normal DAQ Serialisation 01/05/2016 08:17 AM
8816 ANNIE1-electronics-design Milestone New Normal What is our calibration system? 01/25/2018 07:13 AM
8815 ANNIE1-electronics-design Task New Normal Final Decision on MRD and veto electronics 04/06/2016 11:08 PM
10512 ANNIE1-electronics-design Task New Normal Test final pickoff/splitter 04/06/2016 11:14 PM