Project

General

Profile

Issues

Filters

Apply Clear

# Project Tracker Status Priority Subject Assignee Updated
8576 ANNIE1-Assembly Task New Normal Assembly and installation of PMT modules 04/06/2016 11:06 PM
8506 Eroica Production Task New Normal Create Overlay Playlist 04/29/2015 10:28 AM
14672 Elog Bug New Normal Searches are slow 11/28/2016 12:36 AM
8921 uBooNE code Feature New Normal Add standard fcl configurations and mc samples with space charge simulation. 05/26/2015 08:51 AM
7761 LAr Batch Tools Feature New Normal Allow multiple top-level ups products 02/02/2015 02:25 PM
18160 mu2e_ci Task New Normal Documentation for the mu2e_ci 12/18/2017 05:48 PM
14678 Elog Feature New Normal Optional side bar for filter and display options 11/28/2016 09:45 AM
8479 Eroica Production Task New Normal Data Reco Stage 04/29/2015 10:24 AM
16777 Fermi Redmine Bug New Normal Doxygen HTML does not display in embedded module 12/11/2017 10:18 AM
9029 DCSO glideinWMS Task New Normal Jobsub - Acceptance testing 06/05/2015 03:07 PM
7828 uBooNE DAQ Feature New Normal RunControl --- ASIC and Pulser configurations done inside run control 03/11/2015 12:27 AM
10094 Image Tool Bug New Normal Frequent Errors in Live Acquisition 10/02/2015 11:40 AM
11094 ANNIE1-Assembly Milestone New Normal Cut top of tank 12/06/2015 12:08 PM
8244 DCSO HTCondor Support New Normal Update hold_condor to support held reason 04/03/2015 09:14 AM
10526 uBooNE Detector Physics Task New Normal Laser+Cosmics calibration methods 02/08/2016 10:51 AM
11088 ANNIE1-Commissioning Task New Normal Detector commissioning with water 01/25/2018 07:21 AM
11093 ANNIE1-Assembly Task New Normal Modify top of tank, add round offs 01/12/2016 02:36 PM
8753 uBoone Operations Necessary Maintenance New Normal Spare Wiener PL508 power supplies need to be load-tested 05/12/2015 03:15 PM
21186 Elog Bug New Normal can't make entries 10/19/2018 09:01 AM
8478 Eroica Production Task New Normal MC Reco Stage 04/29/2015 10:24 AM
10390 Fermi File Transfer Service Feature New Normal prioritise upload by file type 10/05/2015 11:50 AM
8499 Eroica Production Task New Normal MC Genie Stage 04/28/2015 09:33 PM
8739 uBoone Operations Necessary Maintenance New Normal Remove HV filter boxes from back of MPod 05/12/2015 02:57 PM
16837 Mu2e FMS Feature New Normal DAQ Simulator Component 06/13/2017 04:41 PM
8037 Recycler Injecton Closure Application (PA4187, R52) Bug New Normal Booster > MI line trim calibration file needs to be updated 03/09/2015 07:46 AM
8923 uBooNE code Feature New Normal Experiment-independent access to database calibration information in LArProperties 05/26/2015 08:54 AM
7843 ADMIN Support New Normal Minos FY 2015 SPPM resource spreadsheet 02/12/2015 10:56 AM
16840 Mu2e FMS Feature New Normal QA Component 06/13/2017 04:40 PM
8925 uBooNE code Feature New Normal Experiment-independent channel filter in geometry service 05/27/2015 09:57 AM
18566 ANNIE2-mechanical-design Task New Normal Finalize design of timing calibration system 01/25/2018 07:39 AM
11097 ANNIE1-Assembly Bug New Normal Finalize crates and racks 04/06/2016 11:11 PM
8498 Eroica Production Task New Normal Create Overlay Playlist 04/29/2015 10:26 AM
17573 Off-the-Shelf DAQ Bug New Normal Table Editor Description Persistance 08/23/2017 12:02 PM
8514 Eroica Production Task New Normal Minerva Playlist 9 04/29/2015 10:30 AM
8853 ANNIE1-mechanical-design Task New Normal Water system shipped to FNAL for storage 12/06/2015 10:24 AM
8854 ANNIE1-mechanical-design Task New Normal Ship the muon veto structure 08/05/2015 11:47 PM
24080 ANNIE Necessary Maintenance New Normal BNB Downtime 02/21/2020 11:05 AM
11078 ANNIE1-Assembly Task New Normal Development of PMT installation procedure 04/06/2016 11:05 PM
8856 ANNIE1-veto-installation Milestone New Normal Installation of Veto structure 12/06/2015 10:42 AM
11098 ANNIE1-Commissioning Milestone New Normal Final ORC review 01/25/2018 07:20 AM
16839 Mu2e FMS Feature New Normal Analysis View Component 06/13/2017 04:41 PM
8493 Eroica Production Task New Normal MC Minos Stage 04/29/2015 10:25 AM
19396 dune-artdaq Task New Normal Update the standard dune-artdaq instance to use artdaq v3_00_03a 03/15/2018 04:07 PM
8283 Synergia2 Bug New Normal collimators 04/08/2015 04:30 PM
11100 ANNIE1-Staging Task New Normal Cables for Forward Veto 04/06/2016 11:09 PM
8767 uBoone Operations Necessary Maintenance New Normal Relabel uboonedaq-seb-02 05/12/2015 05:44 PM
11079 ANNIE1-Assembly Task New Normal Spot testing of PMTs 04/06/2016 11:05 PM
8792 Offline Production Operations Service Bug New Normal Samweb projects never ending processes 05/14/2015 09:53 AM
8855 ANNIE1-mechanical-design Milestone New Normal Design of veto structure 08/05/2015 11:55 PM
8112 tramalargu Bug New Normal tracking in R 03/18/2015 12:35 PM
11099 ANNIE1-Assembly Task New Normal Installation of Forward Veto Cabling 04/06/2016 11:07 PM
8638 ANNIE1-Planning Milestone New Normal Complete TSW for ANNIE experiment 12/16/2015 11:56 PM
8938 Fermi Redmine Support New Normal Please make "Necessary Maintenance" states and transitions match those for Bug and Feature. 05/26/2015 02:41 PM
8113 tramalargu Idea New Normal improve adaptive slicing of longitudinal coordinate 03/18/2015 12:36 PM
11674 uBooNE Detector Physics Task New Normal Look at hit width as a function of time 02/08/2016 11:43 AM
11096 ANNIE1-Assembly Milestone New Normal Prelim ORC inspection 04/06/2016 11:12 PM
2807 GlideinWMS Idea New Normal Tracking the number of served requests 05/19/2015 01:59 PM
11684 uBooNE Detector Physics Task New Normal Use ADC to charge conversion 02/09/2016 11:40 AM
11077 ANNIE1-Staging Milestone New Normal Liner: collab buy-in, place order 01/12/2016 02:32 AM
8520 Eroica Production Task New Normal MC Reco Stage 04/29/2015 10:30 AM
10515 uBooNE Detector Physics Task New Normal Special Laser and Cosmic Runs at 50kV, 60kV 02/08/2016 11:03 AM
8507 Eroica Production Task New Normal MC Genie Stage 04/28/2015 09:38 PM
8631 ANNIE1-Assembly Milestone New Normal Lowering the tank in ANNIE Hall 04/06/2016 11:12 PM
2548 Synoptic Feature New Normal Implement Bar Plot component. 03/13/2012 10:05 AM
11683 uBooNE Detector Physics Task New Normal Apply lifetime corrections to hits 02/09/2016 11:41 AM
9602 Simulation Tools and Features Support New Normal Write stepping/stacking action for ANNIE neutron study in artg4tk 07/13/2015 11:51 AM
8756 uBoone Operations Necessary Maintenance New Normal MPod HV modules need to be tested 05/12/2015 03:20 PM
9762 GUMS Task New Normal check_mk sensor to verify user passwd/group/storage_authdb creates 07/29/2015 11:26 AM
18568 ANNIE2-mechanical-design Task New Normal Finalize design of transparency calibration system 12/14/2017 01:34 PM
11089 ANNIE1-Assembly Task New Normal Set up water skid and recirculation system 01/25/2018 07:20 AM
9031 DCSO glideinWMS Task New Normal Jobsub - Move to production 06/05/2015 03:07 PM
10143 NOvA Production Feature New Normal Develop Submission Test 09/14/2015 04:19 PM
9653 uBoone Operations Feature New Normal Install more powerful fan pack from PMT HV crate 07/16/2015 03:45 PM
9342 SeaQuest Production Feature New Normal Use the best FMag/KMag field strengths in track reconstruction 08/14/2015 04:02 PM
7753 SAM Web services Bug New Normal Another slow query 02/04/2015 02:52 PM
11673 uBooNE Detector Physics Task New Normal Apply lifetime correction to hits 02/08/2016 11:41 AM
8497 Eroica Production Task New Normal Data Cal Stage 04/29/2015 10:26 AM
7700 uBoone Operations Necessary Maintenance New Normal Specify voltage and supply needed for field cage ring 01/28/2015 01:58 PM
8471 Eroica Production Task New Normal Data Reco Stage 04/28/2015 08:54 PM
16663 DES Collaboration Tools Feature New Normal Python 3 Conversion 08/08/2017 09:46 AM
8470 Eroica Production Task New Normal MC Reco Stage 04/28/2015 08:44 PM
8468 Eroica Production Task New Normal MC Cal Stage 04/28/2015 08:44 PM
18623 Elog Bug New Normal There is no indication that a logged-in user has been logged out 12/31/2017 01:51 PM
8863 Offline Production Operations Service Feature New Normal Minerva individual submitssion production jobs 05/18/2015 02:00 PM
16841 Mu2e FMS Feature New Normal Data Archiver Component 06/13/2017 04:40 PM
11676 uBooNE Detector Physics Task New Normal Understand the double-exponential or exponential behavior 02/11/2016 11:31 AM
8024 BATCH Support New Normal Propagating Andy's fix to the FD Cosmic processing scripts 03/05/2015 03:14 PM
8475 Eroica Production Task New Normal MC Genie Stage 04/28/2015 09:08 PM
8474 Eroica Production Task New Normal Create Overlay Playlist 04/29/2015 10:24 AM
8473 Eroica Production Task New Normal Data Cal Stage 04/29/2015 10:24 AM
8476 Eroica Production Task New Normal MC Cal Stage 04/29/2015 10:24 AM
11082 ANNIE1-Assembly Task New Normal Access Platform: construction and installation 04/06/2016 11:11 PM
8735 uBoone Operations Necessary Maintenance New Normal MPod LV modules need to be labelled 05/12/2015 02:49 PM
23986 3.9 GHz Cryomodule testing Bug New Normal Low Level RF Drive Power 02/02/2020 07:40 PM
7935 Main Injector Beam Line Smoothing Application (PA1976, I49) Idea New Normal Add RR 8 GeV line to program 02/24/2015 03:58 PM
8477 Eroica Production Task New Normal MC Minos Stage 04/29/2015 10:24 AM
17719 adinstbpm Milestone New Normal Booster operational test of one crate alongside existing BPM system 12/29/2017 11:08 AM
18569 ANNIE2-mechanical-design Task New Normal Revise Specification Doc. 06/12/2018 09:18 AM
8492 Eroica Production Task New Normal MC Cal Stage 04/29/2015 10:25 AM
8516 Eroica Production Task New Normal Create Overlay Playlist 04/29/2015 10:30 AM
(201-300/4573) Per page: 25, 50, 100, 5000

Also available in: Atom CSV PDF