Project

General

Profile

Issues

Filters

Apply Clear

# Project Tracker Status Priority Subject Assignee Updated
8740 uBoone Operations Bug Resolved Urgent Eliminate cause of Vole-like chirping occurring on most channels when HV wire bias is turned on Michael Mooney 10/22/2015 12:51 PM
5459 Node Registration V2 Bug Resolved Urgent Fermi Owned / non-Personal Property should require one of (serial #, Property tag#, Sensitive Item #) Michael Baker 02/18/2014 10:38 AM
20073 Elog Bug Accepted Urgent ConcurrencyModificationException while editing or adding comment Kyle Hazelwood 05/31/2018 12:35 PM
14790 uBooNE Production Production Request Feedback High ana trees for in time sample Adam Lister 12/15/2016 09:01 AM
16055 Neutrino Division LArTPC Test Stands Task New High LAr Vacuum Jacket Transfer Line Kathrine Cipriano 04/03/2017 02:12 PM
23959 PIP-II IT HWR Task New High HWR Resonance control system Philip Varghese 02/16/2020 11:05 PM
15354 gm2calo Task New High Intra-fill SiPM gain correction, inter-fill SiPM gain correction, laser fluctuation corrections Anna Driutti 01/28/2017 02:46 PM
18553 ANNIE2-mechanical-design Task New High Finalize design concept of inner structure Matthew Wetstein 06/13/2018 01:28 AM
19392 dune-artdaq Task New High problem getting more than one EventBuilder John Freeman 03/15/2018 05:20 PM
16443 IFBeam Task New High Python 3 Conversion Vladimir Podstavkov 11/30/2017 11:30 AM
23586 PIP-II IT HWR Task New High Buy connectors and for connections between HWR and Resonance control chassis. Shrividhyaa Sankar Raman 11/12/2019 02:33 PM
23541 sbndaq Task New High Verify ICARUS PMT readout configuration and test Animesh Chatterjee 11/06/2019 09:07 AM
11349 ANNIE1-electronics-design Task New High DAQ board reader TOOL 01/15/2016 08:05 AM
23552 sbndaq Task New High Documentation to support shifters running the DAQ during the cooldown/filling 11/06/2019 09:31 AM
19390 dune-artdaq Task New High Stop commands not processed by some fraction of the artdaq processes 03/15/2018 05:19 PM
18556 ANNIE2-mechanical-design Task New High Design of the new tank lid 01/25/2018 07:34 AM
23588 PIP-II IT HWR Task New High Develop the requirements traceability spreadsheet Brian Chase 11/12/2019 02:45 PM
19389 dune-artdaq Task New High clogged situation in a Dispatcher 03/15/2018 05:19 PM
11402 Cosmogenics Task New High MC samples 01/11/2016 10:28 PM
20194 ICARUS production Task Assigned High POMS and fife_utils documentation Anna Mazzacane 06/19/2018 10:38 AM
17913 Scientific Data Management Task Assigned High test staging latency feature introduced in 4.2.2 FileRouter 10/16/2017 10:29 AM
20317 NoSQL LDRD Task Resolved High Restructure the server to expose only single TCP port 07/16/2018 04:29 PM
25083 MongoDB Task Resolved High Remote authenticated mongodb access on dune-apa-dbedv vms Natalia Ratnikova 10/16/2020 01:52 PM
14890 ANNIE Task Resolved High remove older files from /pnfs/annie/persistent/raw Arthur Kreymer 01/05/2017 09:41 AM
15476 ANNIE Task Resolved High Remove from persistent runs <= 247 Arthur Kreymer 08/31/2017 08:37 AM
22669 Production Operations Management Service (POMS) Task Resolved High Add a campaign_keywords JSON field to Campaigns Stephen White 08/01/2019 02:30 PM
15475 ANNIE Task Resolved High Remove v2data runs converted to v5data Arthur Kreymer 08/31/2017 08:39 AM
24587 llrf-HWR-fe-software Task Resolved High HWR start trigger cable termination Daniel Klepec 07/02/2020 08:24 AM
23551 sbndaq Task Resolved High Get DAQ running in control room in ROC-W Diana Patricia Mendez 02/11/2020 02:35 PM
9681 DCSO Task Resolved High Get newer git for natasha_devel role so I can push to github Natalia Ratnikova 07/21/2015 05:26 PM
9784 CMS dCache Task Resolved High Prepare for downtime Aug 5th Natalia Ratnikova 08/14/2015 11:57 AM
24585 llrf-HWR-fe-software Task Resolved High HWR resonance control pressure set button is broken Daniel Klepec 07/02/2020 08:04 AM
16054 Neutrino Division LArTPC Test Stands Task Work in progress High Liquid Argon Dewar at PAB Kathrine Cipriano 05/24/2017 09:52 AM
16048 Neutrino Division LArTPC Test Stands Task Work in progress High Testing Primary Relief Devices at PAB Kathrine Cipriano 04/03/2017 01:50 PM
13885 ANNIE Task Work in progress High Move raw and processed data to per-run directories Steven Gardiner 01/25/2018 07:26 AM
24578 llrf-HWR-fe-software Task Work in progress High ACNET Connection Shrividhyaa Sankar Raman 08/14/2020 12:32 PM
21836 AD ESH Department, Interlocks Group Necessary Maintenance New High Scientific Linux 6 End of Life 02/05/2019 08:26 AM
19201 SBND code Necessary Maintenance New High All standard chain fcl files should name root files according to a standard 03/02/2018 04:16 AM
8723 uBoone Operations Necessary Maintenance New High Put LArTF network connection on UPS 05/14/2015 02:38 PM
8840 uBoone Operations Necessary Maintenance New High Grating platform Matthew Toups 05/18/2015 09:48 AM
8793 Offline Production Operations Service Necessary Maintenance New High Production accounts OSG service proxy renewal for novapro and minervapro 05/14/2015 12:15 PM
8801 uBoone Operations Necessary Maintenance New High Investigate the use of anti-static mats on the platform 05/14/2015 02:37 PM
8802 uBoone Operations Necessary Maintenance New High Investigate separation of test stand NIM logic and beam timing NIM logic in DAQ room Georgia Karagiorgi 05/14/2015 02:43 PM
8737 uBoone Operations Necessary Maintenance New High Hardware history database 05/14/2015 02:37 PM
8800 uBoone Operations Necessary Maintenance New High Investigate and eliminate source of zig zag noise in the detector Tia Miceli 05/14/2015 03:22 PM
9789 DCSO Necessary Maintenance Assigned High down time on Aug 5th 2015 Natalia Ratnikova 08/19/2015 04:48 AM
8766 uBoone Operations Necessary Maintenance Resolved High Review beam trigger logic at LArTF Georgia Karagiorgi 10/09/2015 07:06 AM
8761 uBoone Operations Necessary Maintenance Resolved High Develop slow monitoring of drift HV current and voltage read back Sowjanya Gollapinni 10/09/2015 07:08 AM
8763 uBoone Operations Necessary Maintenance Resolved High Determine how PMT system will be read out in conjunction with muon telescope Taritree Wongjirad 10/09/2015 07:07 AM
8832 uBoone Operations Necessary Maintenance Accepted High mount home directory from ubdaq-prod cluster to uv laser 1 Wesley Ketchum 05/23/2015 10:00 AM
(51-100/4624) Per page: 25, 50, 100, 5000

Also available in: Atom CSV PDF