Project

General

Profile

Unassigned Issues

Apply Clear

# Project Tracker Status Subject Author Updated
  ANNIE1-electronics-design 12 Collapse all/Expand all
8907 ANNIE1-electronics-design Task Closed Ship PSEC eval card to QMUL Matthew Wetstein 10/09/2015 01:11 PM
10512 ANNIE1-electronics-design Task New Test final pickoff/splitter Jonathan Eisch 04/06/2016 11:14 PM
8816 ANNIE1-electronics-design Milestone New What is our calibration system? Matthew Wetstein 01/25/2018 07:13 AM
  ANNIE1-MCstudies 4 Collapse all/Expand all
8625 ANNIE1-MCstudies Task New Full MC model with 3D PMTs to study neutron tagging efficiencies Matthew Wetstein 01/25/2018 07:24 AM
8623 ANNIE1-MCstudies Task New Geant-based estimate of beam neutron rates and energies Matthew Wetstein 01/25/2018 07:22 AM
8628 ANNIE1-MCstudies Bug New Optimization of acrylic volume Matthew Wetstein 05/06/2015 09:43 AM
8627 ANNIE1-MCstudies Task New SciBooNE driven calculation of skyshine rates Matthew Wetstein 06/04/2015 10:33 AM
  ANNIE1-mechanical-design 7 Collapse all/Expand all
8573 ANNIE1-mechanical-design Task New Approval to purchase tank, from IA State Purchasing Matthew Wetstein 05/27/2015 07:54 AM
8855 ANNIE1-mechanical-design Milestone New Design of veto structure Matthew Wetstein 08/05/2015 11:55 PM
8572 ANNIE1-mechanical-design Task New Fermilab approval for tank purchase Matthew Wetstein 06/09/2015 02:01 AM
11076 ANNIE1-mechanical-design Task New Final decision on liner specs and estimate Matthew Wetstein 01/12/2016 02:33 AM
11092 ANNIE1-mechanical-design Task New Finish design of PMT holders Matthew Wetstein 01/22/2016 08:51 AM
8854 ANNIE1-mechanical-design Task New Ship the muon veto structure Matthew Wetstein 08/05/2015 11:47 PM
8853 ANNIE1-mechanical-design Task New Water system shipped to FNAL for storage Matthew Wetstein 12/06/2015 10:24 AM
  ANNIE1-MRD-design 4 Collapse all/Expand all
8615 ANNIE1-MRD-design Task New Arrange to get the Kansas/Syracuse PMTs and scintillator Matthew Wetstein 06/05/2015 06:42 AM
8616 ANNIE1-MRD-design Task New Follow up on Fermilab PMTs/Scintillator Matthew Wetstein 06/09/2015 02:02 AM
8617 ANNIE1-MRD-design Task New Follow up with NMSU about keeping the MRD Scintillator Matthew Wetstein 12/18/2015 09:22 AM
8618 ANNIE1-MRD-design Task New Sign over stewardship of the MRD steel Matthew Wetstein 06/05/2015 06:39 AM
  ANNIE1-Planning 4 Collapse all/Expand all
8630 ANNIE1-Planning Meeting New ANNIE Run 1 Electronics Review Matthew Wetstein 05/06/2015 09:47 AM
8638 ANNIE1-Planning Milestone New Complete TSW for ANNIE experiment Matthew Wetstein 12/16/2015 11:56 PM
8575 ANNIE1-Planning Task New Contact Stephen Geer about June PAC meeting Matthew Wetstein 05/21/2015 10:07 AM
8629 ANNIE1-Planning Meeting New Run 1 Mechanical Review Matthew Wetstein 01/22/2016 08:51 AM
  ANNIE1-Staging 6 Collapse all/Expand all
11100 ANNIE1-Staging Task New Cables for Forward Veto Matthew Wetstein 04/06/2016 11:09 PM
11077 ANNIE1-Staging Milestone New Liner: collab buy-in, place order Matthew Wetstein 01/12/2016 02:32 AM
8633 ANNIE1-Staging Task New MRD + veto system testing Matthew Wetstein 04/06/2016 11:09 PM
8634 ANNIE1-Staging Task New Order materials for PMT structure Matthew Wetstein 04/06/2016 11:09 PM
11091 ANNIE1-Staging Milestone New Prototype PMT holder Matthew Wetstein 04/06/2016 11:10 PM
8571 ANNIE1-Staging Milestone New Tank Manufacture Matthew Wetstein 12/06/2015 11:38 AM
  ANNIE1-veto-installation 1 Collapse all/Expand all
8856 ANNIE1-veto-installation Milestone New Installation of Veto structure Matthew Wetstein 12/06/2015 10:42 AM
  ANNIE2-Assembly 3 Collapse all/Expand all
18928 ANNIE2-Assembly Task New Finish MRD Refurbishment Matthew Wetstein 02/09/2018 09:06 AM
18929 ANNIE2-Assembly Task New Functional test of new MRD layers Matthew Wetstein 02/09/2018 09:07 AM
18930 ANNIE2-Assembly Task New In situ calibration of MRD layers Matthew Wetstein 02/09/2018 09:07 AM
  ANNIE2-electronics-design 6 Collapse all/Expand all
18938 ANNIE2-electronics-design Task New Design for separate ACDC voltage regulator board Matthew Wetstein 02/09/2018 09:43 AM
18937 ANNIE2-electronics-design Task New Design the backboard for the LAPPD with ACDC connectors Matthew Wetstein 02/09/2018 09:31 AM
18934 ANNIE2-electronics-design Milestone New Final crate and rack maps Matthew Wetstein 02/09/2018 09:15 AM
18936 ANNIE2-electronics-design Milestone New Power distribution plan Matthew Wetstein 02/09/2018 09:16 AM
18935 ANNIE2-electronics-design Milestone New Rack protection plan Matthew Wetstein 02/09/2018 09:16 AM
17916 ANNIE2-electronics-design Bug New readACDC after setConfig is all 0 Miles Lucas 10/31/2017 10:09 AM
  ANNIE2-electronics-readiness 3 Collapse all/Expand all
18932 ANNIE2-electronics-readiness Task New Ethernet interface for ACC Matthew Wetstein 02/09/2018 09:13 AM
18931 ANNIE2-electronics-readiness Task New Finish new ACDC-ACC interface firmware Matthew Wetstein 02/09/2018 09:12 AM
18933 ANNIE2-electronics-readiness Task New Firmware upgrades for KOTO boards (2 different trigger schemes) Matthew Wetstein 02/09/2018 09:13 AM
  ANNIE2-mechanical-design 17 Collapse all/Expand all
18572 ANNIE2-mechanical-design Task New Cleanliness and handling strategy Emrah Tiras 06/12/2018 09:20 AM
18556 ANNIE2-mechanical-design Task New Design of the new tank lid Matthew Wetstein 01/25/2018 07:34 AM
18562 ANNIE2-mechanical-design Task New Draft LAPPD mounting board design Matthew Wetstein 06/12/2018 09:19 AM
18560 ANNIE2-mechanical-design Task New Figure out how to optically isolate the inner volume Matthew Wetstein 12/14/2017 01:14 PM
18571 ANNIE2-mechanical-design Task New Finalize design and layout of water system Matthew Wetstein 01/25/2018 07:40 AM
18567 ANNIE2-mechanical-design Task New Finalize design of source calibration system Matthew Wetstein 12/14/2017 01:33 PM
18566 ANNIE2-mechanical-design Task New Finalize design of timing calibration system Matthew Wetstein 01/25/2018 07:39 AM
18568 ANNIE2-mechanical-design Task New Finalize design of transparency calibration system Matthew Wetstein 12/14/2017 01:34 PM
18570 ANNIE2-mechanical-design Task New Finalize experimental layout in the hall Matthew Wetstein 12/14/2017 01:39 PM
18565 ANNIE2-mechanical-design Task New Final layout of new LAPPD housing Matthew Wetstein 06/12/2018 09:19 AM
18941 ANNIE2-mechanical-design Milestone New Final Review of the Tank Lid design Matthew Wetstein 02/09/2018 09:48 AM
18559 ANNIE2-mechanical-design Bug New Holders and Mount Concepts for new 10" PMTs Matthew Wetstein 01/25/2018 07:57 AM
18558 ANNIE2-mechanical-design Bug New How to mount the LUX PMTs on the bottom Matthew Wetstein 01/25/2018 07:50 AM
18557 ANNIE2-mechanical-design Bug New How to mount the WATCHMAN PMTs Matthew Wetstein 12/14/2017 01:09 PM
18939 ANNIE2-mechanical-design Milestone New Identify new tank liner Matthew Wetstein 06/13/2018 01:30 AM
18569 ANNIE2-mechanical-design Task New Revise Specification Doc. Emrah Tiras 06/12/2018 09:18 AM
18564 ANNIE2-mechanical-design Task New Separate voltage regulators from ACDCs to separate board Matthew Wetstein 06/12/2018 09:20 AM
  art 241 Collapse all/Expand all
4107 art Feature Closed A candidate function for FHICLCPP Rob Kutschke 10/07/2015 01:52 PM
2869 art Feature Closed Access to FCL parameter comments Mark Messier 08/31/2012 11:11 AM
3067 art Feature Closed access to ParameterSet of a producer module Andrei Gaponenko 12/17/2015 01:53 PM
3946 art Feature Rejected ActivityRegistry callbacks preCloseFile and postCloseFile should pass the file name as an argument. Herbert Greenlee 08/09/2013 04:07 PM
918 art Idea Accepted Add architecture-specific capture of call stack at time of construction of cet::exception. Christopher Green 10/23/2017 12:12 PM
15386 art Feature Closed Add basic level of setting context information Marc Paterno 06/05/2018 03:26 PM
11839 art Feature Feedback Add respondToOpenInputFile method to ResultsProducer Brian Rebel 03/03/2016 03:21 PM
906 art Feature Rejected Address the mf::service namespace issue. Christopher Green 12/09/2011 02:28 PM
914 art Idea Rejected Agree on moving forward on MF to merge art / NOvA / CMS versions into one code base. Christopher Green 12/09/2011 02:50 PM
2886 art Feature Closed All configured services shall be created Adam Lyon 08/24/2012 11:56 AM
7662 art Feature Feedback Allow absolute include paths in fcls Christopher Backhouse 10/23/2017 12:12 PM
11119 art Feature Closed Allow an EDFilter to not produce all products if it's returning false Christopher Backhouse 08/29/2016 12:09 PM
22357 art Feature Accepted Allow a placeholder for main FHiCL configuration name in output files (RootOutput, TFileService) Gianluca Petrillo 04/15/2019 10:26 AM
3190 art Feature Closed Allow for reconfiguration in a DAQ environment Kurt Biery 10/23/2017 12:12 PM
2887 art Feature Closed Allow modules to call library code to register their products Adam Lyon 08/24/2012 12:09 PM
898 art Feature Rejected Allow underscores in Product class specifications. Christopher Green 12/09/2011 11:48 AM
19011 art Necessary Maintenance Accepted Analyzer for testing backwards compatibility Kyle Knoepfel 02/19/2018 11:26 AM
2334 art Feature Rejected Another candidate for cetlib? Rob Kutschke 08/02/2013 02:16 PM
18159 art Feature Closed Another request for FileDumperOutput ... Rob Kutschke 08/20/2018 09:57 AM
6368 art Feature Closed A "print" feature to assist in debugging Rob Kutschke 11/28/2016 11:58 AM
8532 art Necessary Maintenance Rejected A question of the appropriate place for testing for the presence of a dictionary for a type of a product Christopher Green 08/29/2016 11:47 AM
17752 art Support Closed art 2.8.3 generating a bus error under GDB (SLF6) Gianluca Petrillo 10/02/2017 11:53 AM
9768 art Support Closed art::FindManyP throws if art::Handle is invalid Tingjun Yang 12/29/2015 10:51 AM
1043 art Bug Accepted art::getFileFormatVersion and art::getFileFormatEra should be renamed Marc Paterno 10/23/2017 12:12 PM
3647 art Bug Closed artmod created Module missing needed #include Event.h Jan Zirnstein 04/23/2013 10:07 AM
13833 art Bug Rejected artmod still produces #include "art/Utilities/InputTag.h" Tingjun Yang 09/13/2016 03:49 PM
11033 art Feature Accepted art module in Python Jim Kowalkowski 04/23/2018 10:51 AM
15372 art Milestone Closed art multi-threading phase 1 Marc Paterno 06/05/2018 04:09 PM
19994 art Feature Accepted art multi-threading phase 2 Kyle Knoepfel 05/21/2018 10:33 AM
11035 art Feature Accepted art producer module in python Jim Kowalkowski 12/07/2015 11:43 AM
19890 art Bug Closed art requires dictionary for non-persistent product Raymond Culbertson 01/31/2019 02:06 PM
3055 art Feature Closed art utility for monitoring file size contributions by new objects Gavin Davies 10/01/2015 01:26 PM
14294 art Bug Rejected ‘boost::filesystem::path’ has no member named ‘native’ when trying to build novasoft with art2/root6 Christopher Backhouse 10/31/2016 11:30 AM
8653 art Feature Closed Build and run art with ROOT6 Ben Morgan 12/17/2015 01:31 PM
16249 art Bug Accepted building art on minsky.fnal.gv Lynn Garren 04/26/2017 11:34 AM
12857 art Bug Remission Build-time dictionary checking has dangerous false positives Christopher Green 06/06/2016 11:40 AM
7580 art Support Feedback Can't debug with the debug builds of art and externals on Mac OSX Adam Lyon 10/23/2017 12:12 PM
7322 art Feature Closed Change in fastCloning default value Wesley Ketchum 10/23/2017 12:12 PM
16354 art Feature Accepted Check that duplicate events are not processed for an art job Kyle Knoepfel 05/01/2017 11:55 AM
1010 art Feature Rejected CheckUpsVersion to provide functions usable in IF checks Christopher Green 12/09/2011 03:16 PM
938 art Bug Rejected code in art should not be directly throwing cet::exception; use art::Exception Marc Paterno 07/25/2013 10:44 AM
5795 art Feature Feedback code version control provenance Brendan Kiburg 10/23/2017 12:12 PM
(101-200/3230) Per page: 25, 50, 100, 5000

Also available in: Atom CSV PDF