Project

General

Profile

Unassigned Issues

Apply Clear

# Project Tracker Status Subject Author Updated
  ANNIE1-electronics-design 12 Collapse all/Expand all
11345 ANNIE1-electronics-design Task New DAQ Serialisation Benjamin Richards 01/05/2016 08:17 AM
11348 ANNIE1-electronics-design Task New Postgress setup Benjamin Richards 01/05/2016 08:22 AM
11349 ANNIE1-electronics-design Task New DAQ board reader TOOL Benjamin Richards 01/15/2016 08:05 AM
  ANNIE1-MCstudies 4 Collapse all/Expand all
8623 ANNIE1-MCstudies Task New Geant-based estimate of beam neutron rates and energies Matthew Wetstein 01/25/2018 07:22 AM
8625 ANNIE1-MCstudies Task New Full MC model with 3D PMTs to study neutron tagging efficiencies Matthew Wetstein 01/25/2018 07:24 AM
8627 ANNIE1-MCstudies Task New SciBooNE driven calculation of skyshine rates Matthew Wetstein 06/04/2015 10:33 AM
8628 ANNIE1-MCstudies Bug New Optimization of acrylic volume Matthew Wetstein 05/06/2015 09:43 AM
  ANNIE1-mechanical-design 7 Collapse all/Expand all
8572 ANNIE1-mechanical-design Task New Fermilab approval for tank purchase Matthew Wetstein 06/09/2015 02:01 AM
8573 ANNIE1-mechanical-design Task New Approval to purchase tank, from IA State Purchasing Matthew Wetstein 05/27/2015 07:54 AM
8853 ANNIE1-mechanical-design Task New Water system shipped to FNAL for storage Matthew Wetstein 12/06/2015 10:24 AM
8854 ANNIE1-mechanical-design Task New Ship the muon veto structure Matthew Wetstein 08/05/2015 11:47 PM
8855 ANNIE1-mechanical-design Milestone New Design of veto structure Matthew Wetstein 08/05/2015 11:55 PM
11076 ANNIE1-mechanical-design Task New Final decision on liner specs and estimate Matthew Wetstein 01/12/2016 02:33 AM
11092 ANNIE1-mechanical-design Task New Finish design of PMT holders Matthew Wetstein 01/22/2016 08:51 AM
  ANNIE1-MRD-design 4 Collapse all/Expand all
8615 ANNIE1-MRD-design Task New Arrange to get the Kansas/Syracuse PMTs and scintillator Matthew Wetstein 06/05/2015 06:42 AM
8616 ANNIE1-MRD-design Task New Follow up on Fermilab PMTs/Scintillator Matthew Wetstein 06/09/2015 02:02 AM
8617 ANNIE1-MRD-design Task New Follow up with NMSU about keeping the MRD Scintillator Matthew Wetstein 12/18/2015 09:22 AM
8618 ANNIE1-MRD-design Task New Sign over stewardship of the MRD steel Matthew Wetstein 06/05/2015 06:39 AM
  ANNIE1-Planning 4 Collapse all/Expand all
8575 ANNIE1-Planning Task New Contact Stephen Geer about June PAC meeting Matthew Wetstein 05/21/2015 10:07 AM
8629 ANNIE1-Planning Meeting New Run 1 Mechanical Review Matthew Wetstein 01/22/2016 08:51 AM
8630 ANNIE1-Planning Meeting New ANNIE Run 1 Electronics Review Matthew Wetstein 05/06/2015 09:47 AM
8638 ANNIE1-Planning Milestone New Complete TSW for ANNIE experiment Matthew Wetstein 12/16/2015 11:56 PM
  ANNIE1-Staging 6 Collapse all/Expand all
8571 ANNIE1-Staging Milestone New Tank Manufacture Matthew Wetstein 12/06/2015 11:38 AM
8633 ANNIE1-Staging Task New MRD + veto system testing Matthew Wetstein 04/06/2016 11:09 PM
8634 ANNIE1-Staging Task New Order materials for PMT structure Matthew Wetstein 04/06/2016 11:09 PM
11077 ANNIE1-Staging Milestone New Liner: collab buy-in, place order Matthew Wetstein 01/12/2016 02:32 AM
11091 ANNIE1-Staging Milestone New Prototype PMT holder Matthew Wetstein 04/06/2016 11:10 PM
11100 ANNIE1-Staging Task New Cables for Forward Veto Matthew Wetstein 04/06/2016 11:09 PM
  ANNIE1-veto-installation 1 Collapse all/Expand all
8856 ANNIE1-veto-installation Milestone New Installation of Veto structure Matthew Wetstein 12/06/2015 10:42 AM
  ANNIE2-Assembly 3 Collapse all/Expand all
18928 ANNIE2-Assembly Task New Finish MRD Refurbishment Matthew Wetstein 02/09/2018 09:06 AM
18929 ANNIE2-Assembly Task New Functional test of new MRD layers Matthew Wetstein 02/09/2018 09:07 AM
18930 ANNIE2-Assembly Task New In situ calibration of MRD layers Matthew Wetstein 02/09/2018 09:07 AM
  ANNIE2-electronics-design 6 Collapse all/Expand all
17916 ANNIE2-electronics-design Bug New readACDC after setConfig is all 0 Miles Lucas 10/31/2017 10:09 AM
18934 ANNIE2-electronics-design Milestone New Final crate and rack maps Matthew Wetstein 02/09/2018 09:15 AM
18935 ANNIE2-electronics-design Milestone New Rack protection plan Matthew Wetstein 02/09/2018 09:16 AM
18936 ANNIE2-electronics-design Milestone New Power distribution plan Matthew Wetstein 02/09/2018 09:16 AM
18937 ANNIE2-electronics-design Task New Design the backboard for the LAPPD with ACDC connectors Matthew Wetstein 02/09/2018 09:31 AM
18938 ANNIE2-electronics-design Task New Design for separate ACDC voltage regulator board Matthew Wetstein 02/09/2018 09:43 AM
  ANNIE2-electronics-readiness 3 Collapse all/Expand all
18931 ANNIE2-electronics-readiness Task New Finish new ACDC-ACC interface firmware Matthew Wetstein 02/09/2018 09:12 AM
18932 ANNIE2-electronics-readiness Task New Ethernet interface for ACC Matthew Wetstein 02/09/2018 09:13 AM
18933 ANNIE2-electronics-readiness Task New Firmware upgrades for KOTO boards (2 different trigger schemes) Matthew Wetstein 02/09/2018 09:13 AM
  ANNIE2-mechanical-design 17 Collapse all/Expand all
18556 ANNIE2-mechanical-design Task New Design of the new tank lid Matthew Wetstein 01/25/2018 07:34 AM
18557 ANNIE2-mechanical-design Bug New How to mount the WATCHMAN PMTs Matthew Wetstein 12/14/2017 01:09 PM
18558 ANNIE2-mechanical-design Bug New How to mount the LUX PMTs on the bottom Matthew Wetstein 01/25/2018 07:50 AM
18559 ANNIE2-mechanical-design Bug New Holders and Mount Concepts for new 10" PMTs Matthew Wetstein 01/25/2018 07:57 AM
18560 ANNIE2-mechanical-design Task New Figure out how to optically isolate the inner volume Matthew Wetstein 12/14/2017 01:14 PM
18562 ANNIE2-mechanical-design Task New Draft LAPPD mounting board design Matthew Wetstein 06/12/2018 09:19 AM
18564 ANNIE2-mechanical-design Task New Separate voltage regulators from ACDCs to separate board Matthew Wetstein 06/12/2018 09:20 AM
18565 ANNIE2-mechanical-design Task New Final layout of new LAPPD housing Matthew Wetstein 06/12/2018 09:19 AM
18566 ANNIE2-mechanical-design Task New Finalize design of timing calibration system Matthew Wetstein 01/25/2018 07:39 AM
18567 ANNIE2-mechanical-design Task New Finalize design of source calibration system Matthew Wetstein 12/14/2017 01:33 PM
18568 ANNIE2-mechanical-design Task New Finalize design of transparency calibration system Matthew Wetstein 12/14/2017 01:34 PM
18569 ANNIE2-mechanical-design Task New Revise Specification Doc. Emrah Tiras 06/12/2018 09:18 AM
18570 ANNIE2-mechanical-design Task New Finalize experimental layout in the hall Matthew Wetstein 12/14/2017 01:39 PM
18571 ANNIE2-mechanical-design Task New Finalize design and layout of water system Matthew Wetstein 01/25/2018 07:40 AM
18572 ANNIE2-mechanical-design Task New Cleanliness and handling strategy Emrah Tiras 06/12/2018 09:20 AM
18939 ANNIE2-mechanical-design Milestone New Identify new tank liner Matthew Wetstein 06/13/2018 01:30 AM
18941 ANNIE2-mechanical-design Milestone New Final Review of the Tank Lid design Matthew Wetstein 02/09/2018 09:48 AM
  art 241 Collapse all/Expand all
890 art Feature Closed Review linking of shared libraries. Christopher Green 07/24/2013 04:01 PM
891 art Feature Closed Migrate simple_plugin Cmake macro to art package. Christopher Green 12/09/2011 11:44 AM
894 art Feature Closed Investigate whether simple_plugin Cmake macro can be improved to not require dict subdirectory. Christopher Green 12/09/2011 11:44 AM
895 art Feature Rejected Revise ROOT-based I/O to incorporate improvements in CMS code base Christopher Green 12/09/2011 11:46 AM
897 art Necessary Maintenance Accepted Institute validation tests for an installed art package. Christopher Green 10/23/2017 12:12 PM
898 art Feature Rejected Allow underscores in Product class specifications. Christopher Green 12/09/2011 11:48 AM
899 art Feature Rejected Should module_label continue to be injected into each module? Christopher Green 06/26/2012 01:34 PM
900 art Feature Closed EventID should have the subRunID as part of its data Christopher Green 12/09/2011 11:55 AM
901 art Feature Rejected Record how many events were read from input for the writing of a given output file. Christopher Green 12/09/2011 11:56 AM
903 art Feature Rejected Create forwarding headers in each library with standard naming (fwd.h). Christopher Green 07/24/2013 04:44 PM
905 art Feature Rejected Review and port MessageLogger changes from CMS repository to MF since fork. Christopher Green 12/09/2011 12:02 PM
906 art Feature Rejected Address the mf::service namespace issue. Christopher Green 12/09/2011 02:28 PM
907 art Necessary Maintenance Accepted Review and rationalize use of exceptions across art. Christopher Green 10/23/2017 12:12 PM
908 art Necessary Maintenance Accepted Review structure, code and other aspects of cpp0x and cetlib Christopher Green 10/23/2017 12:12 PM
909 art Bug Accepted Event::getView should return false (per design) rather than throw in specified cases. Christopher Green 10/23/2017 12:12 PM
910 art Necessary Maintenance Accepted Investigate whether Event::fillView_ should use reflex_cast (or its replacement) instead of static_cast. Christopher Green 10/23/2017 12:12 PM
911 art Feature Closed Investigate storage of exceptions in Handle and friends and whether it can be improved. Christopher Green 07/19/2012 01:08 PM
913 art Idea Rejected Review naming conventions in mesagefacility. Christopher Green 12/09/2011 02:49 PM
914 art Idea Rejected Agree on moving forward on MF to merge art / NOvA / CMS versions into one code base. Christopher Green 12/09/2011 02:50 PM
915 art Bug Closed Reproduce minimally and report a (Reflex?) bug in processing of vector<Prong const *> Christopher Green 12/09/2011 02:51 PM
916 art Milestone Accepted Make a note in the cet-is Wiki on detail namespace / header / source file subdirectory. Christopher Green 10/23/2017 12:12 PM
917 art Necessary Maintenance Accepted Make FHICL language document pretty. Christopher Green 10/23/2017 12:12 PM
918 art Idea Accepted Add architecture-specific capture of call stack at time of construction of cet::exception. Christopher Green 10/23/2017 12:12 PM
919 art Bug Rejected Investigate report of problem with floating point exception control service. Christopher Green 07/25/2013 10:36 AM
920 art Milestone Closed Design a mechanism for specifying obsolete parameters with info/warnings when seen. Christopher Green 10/23/2017 12:12 PM
921 art Feature Rejected Replace Worker, WorkerT and friends with something with better consistency / problem detection. Christopher Green 12/09/2011 03:03 PM
938 art Bug Rejected code in art should not be directly throwing cet::exception; use art::Exception Marc Paterno 07/25/2013 10:44 AM
942 art Milestone Accepted Design mechanism for library versioning and consistency checks Christopher Green 10/23/2017 12:12 PM
943 art Feature Accepted Document in-use parameters for all framework code. Christopher Green 10/23/2017 12:12 PM
945 art Feature Rejected Set up LXR browser for all projects. Christopher Green 12/09/2011 03:09 PM
946 art Necessary Maintenance Accepted Review and provide precise definitions of each signal watchpoint. Christopher Green 10/23/2017 12:12 PM
956 art Feature Accepted Testing of signal emission is needed Marc Paterno 10/23/2017 12:12 PM
961 art Bug Rejected EDProducer to read data products from another event data file. Rob Kutschke 02/11/2011 11:54 AM
963 art Feature Closed EDProducer to read data products from another event data file. Rob Kutschke 12/09/2011 03:13 PM
974 art Necessary Maintenance Accepted Review non-running legacy tests to see if they are worth porting or should be removed. Christopher Green 10/23/2017 12:12 PM
1010 art Feature Rejected CheckUpsVersion to provide functions usable in IF checks Christopher Green 12/09/2011 03:16 PM
1025 art Feature Rejected end_paths and trigger_paths are now unnecessary and should be retired. Christopher Green 07/25/2013 12:03 PM
1026 art Necessary Maintenance Accepted Duplicated code for branch name element verification Marc Paterno 10/23/2017 12:12 PM
1043 art Bug Accepted art::getFileFormatVersion and art::getFileFormatEra should be renamed Marc Paterno 10/23/2017 12:12 PM
1057 art Bug Rejected Specifying maximum output file size does not work Brian Rebel 07/25/2013 12:13 PM
1062 art Feature Rejected Quick reference guide for documentation site Brian Rebel 07/25/2013 01:47 PM
1063 art Feature Rejected Make the input line parameters accessible to modules Denis Perevalov 03/21/2011 05:44 PM
(101-200/3230) Per page: 25, 50, 100, 5000

Also available in: Atom CSV PDF