Project

General

Profile

Issues

Filters

Apply Clear

# Project Tracker Status Priority Subject Assignee Updated
8743 uBoone Operations Necessary Maintenance New Normal Write up summary and conclusions from mock TPC tests at DAB Jonathan Asaadi 05/15/2015 06:31 AM
8741 uBoone Operations Necessary Maintenance New Normal Set up control room computer screens Joseph Zennamo 05/19/2015 10:13 AM
8764 uBoone Operations Necessary Maintenance New Normal Determine detailed samples to be taken with muon counter system Matthew Bass 05/12/2015 03:45 PM
8834 uBoone Operations Idea New Normal KeyBox at LArTf or control room for the UV laser Matthew Toups 05/18/2015 06:34 AM
8840 uBoone Operations Necessary Maintenance New High Grating platform Matthew Toups 05/18/2015 09:48 AM
8111 uBoone Operations Necessary Maintenance New Normal Remove 1kHz GIZMO stimulation signal Matthew Toups 05/12/2015 03:01 PM
8724 uBoone Operations Necessary Maintenance New Normal Purchase power plug adapter for network switches in racks on LArTF platform Matthew Toups 05/12/2015 02:20 PM
8862 uBoone Operations Support Accepted Normal Laser Monitoring Matthias Luethi 05/19/2015 10:14 AM
8839 uBoone Operations Necessary Maintenance New Normal Assign permanent port numbers to the rs232 connection Matthias Luethi 05/18/2015 09:58 AM
8827 uBoone Operations Necessary Maintenance Assigned Normal Setup UV Laser Trigger Connection to DAQ Matthias Luethi 05/18/2015 06:27 AM
8740 uBoone Operations Bug Resolved Urgent Eliminate cause of Vole-like chirping occurring on most channels when HV wire bias is turned on Michael Mooney 10/22/2015 12:51 PM
8861 uBoone Operations Support Resolved Normal HV Monitoring Sarah Lockwitz 10/09/2015 07:08 AM
8746 uBoone Operations Necessary Maintenance New Normal Connect HV drift cable from cryostat to filter pot Sarah Lockwitz 05/12/2015 03:07 PM
8747 uBoone Operations Necessary Maintenance New Normal Establish final length of HV drift cable Sarah Lockwitz 05/12/2015 03:08 PM
8748 uBoone Operations Necessary Maintenance Accepted Normal Drift HV cable flange needs to be secured Sarah Lockwitz 06/02/2015 10:44 AM
8719 uBoone Operations Necessary Maintenance Accepted Normal Dress RS-232 to USB cable in back of drift HV rack Sarah Lockwitz 06/02/2015 10:43 AM
8728 uBoone Operations Necessary Maintenance New Normal Write procedure to power down Drift HV rack Sarah Lockwitz 05/12/2015 03:00 PM
9023 uBoone Operations Bug New High investigate high Wiener internal temperatures in PL508 (CrateRails) supplies Sowjanya Gollapinni 06/03/2015 11:47 AM
9036 uBoone Operations Bug New Normal update the /home/uboonedaq/ directory on glomation-sbc-4 Sowjanya Gollapinni 06/04/2015 12:01 AM
8864 uBoone Operations Support New Normal Slow Control Monitoring Sowjanya Gollapinni 05/18/2015 02:08 PM
7704 uBoone Operations Necessary Maintenance Assigned Normal Check out the TPC wire bias outputs and set points Sowjanya Gollapinni 05/14/2015 02:31 PM
8761 uBoone Operations Necessary Maintenance Resolved High Develop slow monitoring of drift HV current and voltage read back Sowjanya Gollapinni 10/09/2015 07:08 AM
8734 uBoone Operations Necessary Maintenance New Normal PMT HV modules need to be labelled Taritree Wongjirad 05/12/2015 02:49 PM
8744 uBoone Operations Necessary Maintenance Resolved Normal Connect PMT cables to PMT flange Taritree Wongjirad 10/09/2015 08:42 AM
8726 uBoone Operations Necessary Maintenance New Normal Install fan above PMT flange Taritree Wongjirad 05/12/2015 02:23 PM
(4326-4350/4644) Per page: 25, 50, 100, 5000

Also available in: Atom CSV PDF