8736 uBoone Operations Necessary Maintenance New Normal MPod HV modules need to be labelled 05/12/2015 02:50 PM
8735 uBoone Operations Necessary Maintenance New Normal MPod LV modules need to be labelled 05/12/2015 02:49 PM
8734 uBoone Operations Necessary Maintenance New Normal PMT HV modules need to be labelled Taritree Wongjirad 05/12/2015 02:49 PM
8731 uBoone Operations Necessary Maintenance New Normal Label cable from PMT/laser interlock box to PMT HV interlock input Taritree Wongjirad 05/12/2015 02:35 PM
8728 uBoone Operations Necessary Maintenance New Normal Write procedure to power down Drift HV rack Sarah Lockwitz 05/12/2015 03:00 PM
8726 uBoone Operations Necessary Maintenance New Normal Install fan above PMT flange Taritree Wongjirad 05/12/2015 02:23 PM
8725 uBoone Operations Necessary Maintenance New Normal Determine operational requirements for TPC flange FT heaters 05/12/2015 02:21 PM
8724 uBoone Operations Necessary Maintenance New Normal Purchase power plug adapter for network switches in racks on LArTF platform Matthew Toups 05/12/2015 02:20 PM
8723 uBoone Operations Necessary Maintenance New High Put LArTF network connection on UPS 05/14/2015 02:38 PM
8721 uBoone Operations Necessary Maintenance New Normal Dress cables in back of uboonedaq-seb-02 Eric Church 05/12/2015 02:10 PM
8111 uBoone Operations Necessary Maintenance New Normal Remove 1kHz GIZMO stimulation signal Matthew Toups 05/12/2015 03:01 PM
7700 uBoone Operations Necessary Maintenance New Normal Specify voltage and supply needed for field cage ring 01/28/2015 01:58 PM
8827 uBoone Operations Necessary Maintenance Assigned Normal Setup UV Laser Trigger Connection to DAQ Matthias Luethi 05/18/2015 06:27 AM
8722 uBoone Operations Necessary Maintenance Assigned Normal Load-balance current draw from sebs in DAQ room at LArTF Wesley Ketchum 05/12/2015 02:13 PM
7704 uBoone Operations Necessary Maintenance Assigned Normal Check out the TPC wire bias outputs and set points Sowjanya Gollapinni 05/14/2015 02:31 PM
8861 uBoone Operations Support Resolved Normal HV Monitoring Sarah Lockwitz 10/09/2015 07:08 AM
8860 uBoone Operations Support Resolved Normal DAQ Monitoring Wesley Ketchum 10/09/2015 07:09 AM
8766 uBoone Operations Necessary Maintenance Resolved High Review beam trigger logic at LArTF Georgia Karagiorgi 10/09/2015 07:06 AM
8763 uBoone Operations Necessary Maintenance Resolved High Determine how PMT system will be read out in conjunction with muon telescope Taritree Wongjirad 10/09/2015 07:07 AM
8761 uBoone Operations Necessary Maintenance Resolved High Develop slow monitoring of drift HV current and voltage read back Sowjanya Gollapinni 10/09/2015 07:08 AM
8744 uBoone Operations Necessary Maintenance Resolved Normal Connect PMT cables to PMT flange Taritree Wongjirad 10/09/2015 08:42 AM
8740 uBoone Operations Bug Resolved Urgent Eliminate cause of Vole-like chirping occurring on most channels when HV wire bias is turned on Michael Mooney 10/22/2015 12:51 PM
7707 uBoone Operations Necessary Maintenance Resolved Normal Install LED flasher board at LArTF Taritree Wongjirad 10/09/2015 08:43 AM
8862 uBoone Operations Support Accepted Normal Laser Monitoring Matthias Luethi 05/19/2015 10:14 AM
8833 uBoone Operations Necessary Maintenance Accepted Normal Check eth port is the connectivity to readout works Thomas Strauss 05/23/2015 10:04 AM
(4301-4325/4589) Per page: 25, 50, 100, 5000