8731 uBoone Operations Necessary Maintenance New Normal Label cable from PMT/laser interlock box to PMT HV interlock input Taritree Wongjirad 05/12/2015 02:35 PM
8728 uBoone Operations Necessary Maintenance New Normal Write procedure to power down Drift HV rack Sarah Lockwitz 05/12/2015 03:00 PM
8726 uBoone Operations Necessary Maintenance New Normal Install fan above PMT flange Taritree Wongjirad 05/12/2015 02:23 PM
8725 uBoone Operations Necessary Maintenance New Normal Determine operational requirements for TPC flange FT heaters 05/12/2015 02:21 PM
8724 uBoone Operations Necessary Maintenance New Normal Purchase power plug adapter for network switches in racks on LArTF platform Matthew Toups 05/12/2015 02:20 PM
8723 uBoone Operations Necessary Maintenance New High Put LArTF network connection on UPS 05/14/2015 02:38 PM
8722 uBoone Operations Necessary Maintenance Assigned Normal Load-balance current draw from sebs in DAQ room at LArTF Wesley Ketchum 05/12/2015 02:13 PM
8721 uBoone Operations Necessary Maintenance New Normal Dress cables in back of uboonedaq-seb-02 Eric Church 05/12/2015 02:10 PM
8719 uBoone Operations Necessary Maintenance Accepted Normal Dress RS-232 to USB cable in back of drift HV rack Sarah Lockwitz 06/02/2015 10:43 AM
8111 uBoone Operations Necessary Maintenance New Normal Remove 1kHz GIZMO stimulation signal Matthew Toups 05/12/2015 03:01 PM
7707 uBoone Operations Necessary Maintenance Resolved Normal Install LED flasher board at LArTF Taritree Wongjirad 10/09/2015 08:43 AM
7704 uBoone Operations Necessary Maintenance Assigned Normal Check out the TPC wire bias outputs and set points Sowjanya Gollapinni 05/14/2015 02:31 PM
7700 uBoone Operations Necessary Maintenance New Normal Specify voltage and supply needed for field cage ring 01/28/2015 01:58 PM
14831 uBooNE Production Production Request New Urgent MCC7 in time CORSIKA samples 12/16/2016 09:52 AM
14790 uBooNE Production Production Request Feedback High ana trees for in time sample Adam Lister 12/15/2016 09:01 AM
14771 uBooNE Production Production Request Accepted Normal single e and photon samples for hit resolution studies Joel Mousseau 12/07/2016 08:28 AM
14764 uBooNE Production Bug Feedback Normal Overlay reco needs correct digit collection Wesley Ketchum 12/07/2016 07:10 AM
14754 uBooNE Production Feature Resolved Normal Set IncludeMisconfiguredU to true Herbert Greenlee 12/16/2016 09:50 AM
14753 uBooNE Production Feature Resolved Normal Update Lifetime Wesley Ketchum 12/07/2016 07:06 AM
14361 uBooNE Reconstruction Task New Normal DATA gain validation 11/02/2016 01:23 PM
14360 uBooNE Reconstruction Task New Normal MC gain estimation and validation 11/02/2016 01:21 PM
14341 uBooNE Reconstruction Task New Normal Optimize existing hit finder parameters Salvatore Davide Porzio 11/01/2016 11:26 AM
14204 uBooNE Reconstruction Task Work in progress Normal Integration of Cluster3D into LArSoft reconstruction Tracy Usher 10/21/2016 11:01 AM
13747 uBooNE Reconstruction Task New Normal Pi0 Clustering 09/01/2016 04:53 PM
13653 uBooNE Reconstruction Task New Normal data-driven 3D direction & energy resolution calculation 11/01/2016 02:23 PM
(4301-4325/4573) Per page: 25, 50, 100, 5000