Project

General

Profile

Issues

Filters

Apply Clear

# Project Tracker Status Priority Subject Assignee Updated
9928 uBooNE Detector Physics Task New Normal Identify stopping cosmics 02/22/2016 02:00 PM
11676 uBooNE Detector Physics Task New Normal Understand the double-exponential or exponential behavior 02/11/2016 11:31 AM
9930 uBooNE Detector Physics Task Assigned Normal Production TPC pedestal determination 02/22/2016 01:59 PM
11684 uBooNE Detector Physics Task New Normal Use ADC to charge conversion 02/09/2016 11:40 AM
11674 uBooNE Detector Physics Task New Normal Look at hit width as a function of time 02/08/2016 11:43 AM
8859 uBoone Operations Support New Normal Cryogenics Monitoring Ben Carls 05/18/2015 01:54 PM
8858 uBoone Operations Support New Normal Calibration Monitoring Ben Carls 05/18/2015 01:52 PM
8721 uBoone Operations Necessary Maintenance New Normal Dress cables in back of uboonedaq-seb-02 Eric Church 05/12/2015 02:10 PM
8802 uBoone Operations Necessary Maintenance New High Investigate separation of test stand NIM logic and beam timing NIM logic in DAQ room Georgia Karagiorgi 05/14/2015 02:43 PM
8766 uBoone Operations Necessary Maintenance Resolved High Review beam trigger logic at LArTF Georgia Karagiorgi 10/09/2015 07:06 AM
8743 uBoone Operations Necessary Maintenance New Normal Write up summary and conclusions from mock TPC tests at DAB Jonathan Asaadi 05/15/2015 06:31 AM
8741 uBoone Operations Necessary Maintenance New Normal Set up control room computer screens Joseph Zennamo 05/19/2015 10:13 AM
8764 uBoone Operations Necessary Maintenance New Normal Determine detailed samples to be taken with muon counter system Matthew Bass 05/12/2015 03:45 PM
8834 uBoone Operations Idea New Normal KeyBox at LArTf or control room for the UV laser Matthew Toups 05/18/2015 06:34 AM
8840 uBoone Operations Necessary Maintenance New High Grating platform Matthew Toups 05/18/2015 09:48 AM
8111 uBoone Operations Necessary Maintenance New Normal Remove 1kHz GIZMO stimulation signal Matthew Toups 05/12/2015 03:01 PM
8724 uBoone Operations Necessary Maintenance New Normal Purchase power plug adapter for network switches in racks on LArTF platform Matthew Toups 05/12/2015 02:20 PM
8862 uBoone Operations Support Accepted Normal Laser Monitoring Matthias Luethi 05/19/2015 10:14 AM
8827 uBoone Operations Necessary Maintenance Assigned Normal Setup UV Laser Trigger Connection to DAQ Matthias Luethi 05/18/2015 06:27 AM
8839 uBoone Operations Necessary Maintenance New Normal Assign permanent port numbers to the rs232 connection Matthias Luethi 05/18/2015 09:58 AM
8740 uBoone Operations Bug Resolved Urgent Eliminate cause of Vole-like chirping occurring on most channels when HV wire bias is turned on Michael Mooney 10/22/2015 12:51 PM
8861 uBoone Operations Support Resolved Normal HV Monitoring Sarah Lockwitz 10/09/2015 07:08 AM
8746 uBoone Operations Necessary Maintenance New Normal Connect HV drift cable from cryostat to filter pot Sarah Lockwitz 05/12/2015 03:07 PM
8748 uBoone Operations Necessary Maintenance Accepted Normal Drift HV cable flange needs to be secured Sarah Lockwitz 06/02/2015 10:44 AM
8719 uBoone Operations Necessary Maintenance Accepted Normal Dress RS-232 to USB cable in back of drift HV rack Sarah Lockwitz 06/02/2015 10:43 AM
(4301-4325/4629) Per page: 25, 50, 100, 5000

Also available in: Atom CSV PDF