Project

General

Profile

Issues

Filters

Apply Clear

# Project Tracker Status Priority Subject Assignee Updated
20360 Instrumentation Drivers Task Work in progress Normal drvgen specification for NML timing module John Diamond 07/19/2018 02:42 PM
16713 Instrumentation Drivers Task Accepted Normal Verify operating of ACNET devices and both timing modules John Diamond 05/30/2017 11:30 AM
16537 Instrumentation Drivers Task New Normal Create drvgen register map John Diamond 05/15/2017 02:10 PM
11895 Instrumentation Drivers Task Assigned Normal DCCT ADC Driver John Diamond 03/04/2016 10:28 AM
16396 lar_ci Task Work in progress Normal email report: enable the blame user feature to send the email report also to the user that broke the code Vito Di Benedetto 02/27/2019 11:19 AM
21335 LArSoft Task Resolved Normal Finish documentation for LArG4 Restructure Hans-Joachim Wenzel 11/27/2018 03:17 PM
17950 LArSoft Task Assigned Normal Preliminary vectorization tests and evaluation Guilherme Lima 10/18/2017 11:42 AM
17948 LArSoft Task Assigned Normal Investigate potential areas where vectorization may be applied in LArSoft code Guilherme Lima 10/18/2017 11:15 AM
17947 LArSoft Task Assigned Normal Profiling LArSoft Guilherme Lima 03/08/2018 11:29 AM
17946 LArSoft Task Assigned Normal setting up and running LArSoft on laptop (or elsewhere) Guilherme Lima 03/08/2018 11:37 AM
17429 LArSoft Task Assigned Normal Design and implement global wire coordinate feature. Michael Wallbank 08/10/2017 11:20 AM
17427 LArSoft Task Feedback Normal Add geometry infrastructure for support of global wire coordinates Tingjun Yang 08/03/2018 10:02 AM
17360 LArSoft Task Resolved Normal Provide a tool to facilitate the creation of track objects fulfilling the track requirements Giuseppe Cerati 09/13/2017 02:25 PM
16438 LArSoft Task Assigned Normal Update PMA to support any drift direction and any set of view types Christoph Alt 05/08/2018 09:47 AM
15730 LArSoft Task Assigned Normal Verify that the wire and optical calibration module supports arbitrary drift direction. Christoph Alt 05/08/2018 09:47 AM
15729 LArSoft Task Assigned Normal Update the reconstruction algorithms to support arbitrary drift direction Christoph Alt 10/11/2018 11:55 AM
15728 LArSoft Task Assigned Normal Update event display to support arbitrary drift direction Christoph Alt 05/08/2018 09:46 AM
14282 LArSoft Task Accepted Normal Design an interface for access of reconstructed particle hierarchy ("particle flow") information 01/09/2018 02:53 PM
14281 LArSoft Task Accepted Normal Provide an interface for access of reconstructed track information 01/09/2018 02:53 PM
11872 LArSoft Task Accepted Normal Establish a standard way to represent particle identification results 11/16/2017 01:49 PM
21912 LE Linac LLRF Task Assigned Normal Support efforts to move LE Linac LLRF to kernel 6.4 Ed Cullerton 09/11/2020 01:34 PM
18341 Linux on MVME8100 Task Assigned Normal Setup build area John Diamond 11/20/2017 09:47 AM
18339 Linux on MVME8100 Task New Normal Need extra mini db-9 cables, null modem and gender changet 11/20/2017 09:38 AM
24597 llrf-hwr-2cavity-firmware Task Work in progress Normal Resonance controller needs diagnostics Philip Varghese 07/10/2020 11:56 AM
24734 llrf-HWR-fe-software Task New Normal Documenting recent software changes for resonance control and other upgrades Shrividhyaa Sankar Raman 08/09/2020 10:16 AM
(4126-4150/4587) Per page: 25, 50, 100, 5000

Also available in: Atom CSV PDF