Project

General

Profile

Unassigned Issues

Apply Clear

# Project Tracker Status Subject Author Updated
  uBooNE Detector Physics 23 Collapse all/Expand all
11674 uBooNE Detector Physics Task New Look at hit width as a function of time Ben Carls 02/08/2016 11:43 AM
11666 uBooNE Detector Physics Task New Measure the ADC to charge conversion Ben Carls 02/08/2016 11:33 AM
9930 uBooNE Detector Physics Task Assigned Production TPC pedestal determination Herbert Greenlee 02/22/2016 01:59 PM
9898 uBooNE Detector Physics Milestone New Purity Paper Michael Weber 02/08/2016 11:05 AM
10540 uBooNE Detector Physics Milestone Assigned Space Charge Measurement Paper Jyoti Joshi 02/22/2016 02:00 PM
10515 uBooNE Detector Physics Task New Special Laser and Cosmic Runs at 50kV, 60kV Jyoti Joshi 02/08/2016 11:03 AM
11676 uBooNE Detector Physics Task New Understand the double-exponential or exponential behavior Ben Carls 02/11/2016 11:31 AM
11684 uBooNE Detector Physics Task New Use ADC to charge conversion Ben Carls 02/09/2016 11:40 AM
  uBoone Operations 29 Collapse all/Expand all
7696 uBoone Operations Necessary Maintenance Closed Check out and test laser-PMT-drift HV interlock box Matthew Toups 05/27/2015 10:07 AM
7699 uBoone Operations Necessary Maintenance Closed Check out the LAr level - drift_HV interlock Matthew Toups 05/14/2015 02:30 PM
8758 uBoone Operations Necessary Maintenance New Decision about separating Mpod HV and LV modules into different crates Matthew Toups 05/12/2015 03:31 PM
8725 uBoone Operations Necessary Maintenance New Determine operational requirements for TPC flange FT heaters Matthew Toups 05/12/2015 02:21 PM
8738 uBoone Operations Necessary Maintenance New Develop Cryo Display in ROC-W Matthew Toups 05/12/2015 02:54 PM
8737 uBoone Operations Necessary Maintenance New Hardware history database Matthew Toups 05/14/2015 02:37 PM
9082 uBoone Operations Feature New Improvements to Alarm Area Panel and Alarm Tree for improved status visibility Glenn Horton-Smith 06/09/2015 03:41 PM
9653 uBoone Operations Feature New Install more powerful fan pack from PMT HV crate Matthew Toups 07/16/2015 03:45 PM
7695 uBoone Operations Milestone Closed Install Muon Tagger at LArTF Matthew Toups 10/15/2015 02:32 PM
7702 uBoone Operations Necessary Maintenance Closed Investigate Glassman current monitoring precision Matthew Toups 05/14/2015 02:31 PM
8801 uBoone Operations Necessary Maintenance New Investigate the use of anti-static mats on the platform Matthew Toups 05/14/2015 02:37 PM
8759 uBoone Operations Necessary Maintenance New Lexan cover installed over NIM bin in DAQ room Matthew Toups 05/12/2015 03:32 PM
8736 uBoone Operations Necessary Maintenance New MPod HV modules need to be labelled Matthew Toups 05/12/2015 02:50 PM
8756 uBoone Operations Necessary Maintenance New MPod HV modules need to be tested Matthew Toups 05/12/2015 03:20 PM
8757 uBoone Operations Necessary Maintenance New Mpod LV module need to be tested Matthew Toups 05/12/2015 03:25 PM
8735 uBoone Operations Necessary Maintenance New MPod LV modules need to be labelled Matthew Toups 05/12/2015 02:49 PM
8723 uBoone Operations Necessary Maintenance New Put LArTF network connection on UPS Matthew Toups 05/14/2015 02:38 PM
(3176-3200/3356) Per page: 25, 50, 100, 5000

Also available in: Atom CSV PDF