Project

General

Profile

Unassigned Issues

Apply Clear

# Project Tracker Status Subject Author Updated
  uBooNE Detector Physics 23 Collapse all/Expand all
11673 uBooNE Detector Physics Task New Apply lifetime correction to hits Ben Carls 02/08/2016 11:41 AM
11670 uBooNE Detector Physics Task New Hypothesize the Bragg peak and scale measured charge to match Ben Carls 02/08/2016 11:42 AM
11686 uBooNE Detector Physics Task New Create TPC reconstruction algorithm Ben Carls 02/09/2016 11:43 AM
11669 uBooNE Detector Physics Task New Identify stopping muons Ben Carls 03/16/2016 02:17 PM
11683 uBooNE Detector Physics Task New Apply lifetime corrections to hits Ben Carls 02/09/2016 11:41 AM
11684 uBooNE Detector Physics Task New Use ADC to charge conversion Ben Carls 02/09/2016 11:40 AM
11682 uBooNE Detector Physics Task New Apply recombination correction using modified Box model (or Birk's) Ben Carls 02/09/2016 11:38 AM
11671 uBooNE Detector Physics Task New Look at data from different fields Ben Carls 02/08/2016 11:42 AM
  uBoone Operations 29 Collapse all/Expand all
7695 uBoone Operations Milestone Closed Install Muon Tagger at LArTF Matthew Toups 10/15/2015 02:32 PM
7696 uBoone Operations Necessary Maintenance Closed Check out and test laser-PMT-drift HV interlock box Matthew Toups 05/27/2015 10:07 AM
8151 uBoone Operations Necessary Maintenance Closed review all crate temperature and fan speed alarm ranges Glenn Horton-Smith 10/02/2015 08:01 PM
8152 uBoone Operations Necessary Maintenance Closed review daq, pc status, and related alarm ranges Glenn Horton-Smith 10/02/2015 08:01 PM
9003 uBoone Operations Necessary Maintenance Closed Write interface code Taritree Wongjirad 10/15/2015 02:27 PM
9001 uBoone Operations Necessary Maintenance Closed Write EDR Taritree Wongjirad 10/15/2015 02:29 PM
7703 uBoone Operations Necessary Maintenance Closed Repair LAr liquid level probes Matthew Toups 05/14/2015 02:31 PM
8150 uBoone Operations Necessary Maintenance Closed review all our power supply alarm ranges Glenn Horton-Smith 10/02/2015 08:00 PM
7699 uBoone Operations Necessary Maintenance Closed Check out the LAr level - drift_HV interlock Matthew Toups 05/14/2015 02:30 PM
7702 uBoone Operations Necessary Maintenance Closed Investigate Glassman current monitoring precision Matthew Toups 05/14/2015 02:31 PM
9082 uBoone Operations Feature New Improvements to Alarm Area Panel and Alarm Tree for improved status visibility Glenn Horton-Smith 06/09/2015 03:41 PM
9653 uBoone Operations Feature New Install more powerful fan pack from PMT HV crate Matthew Toups 07/16/2015 03:45 PM
8801 uBoone Operations Necessary Maintenance New Investigate the use of anti-static mats on the platform Matthew Toups 05/14/2015 02:37 PM
8742 uBoone Operations Necessary Maintenance New Write up summary and conclusions from remote viewing inside cryostat Matthew Toups 05/12/2015 03:03 PM
8736 uBoone Operations Necessary Maintenance New MPod HV modules need to be labelled Matthew Toups 05/12/2015 02:50 PM
8739 uBoone Operations Necessary Maintenance New Remove HV filter boxes from back of MPod Matthew Toups 05/12/2015 02:57 PM
8735 uBoone Operations Necessary Maintenance New MPod LV modules need to be labelled Matthew Toups 05/12/2015 02:49 PM
(3176-3200/3355) Per page: 25, 50, 100, 5000

Also available in: Atom CSV PDF