Project

General

Profile

Unassigned Issues

Apply Clear

# Project Tracker Status Subject Author Updated
  uBooNE Detector Physics 23 Collapse all/Expand all
11666 uBooNE Detector Physics Task New Measure the ADC to charge conversion Ben Carls 02/08/2016 11:33 AM
11667 uBooNE Detector Physics Task New Get ADC to charge conversion from crossing tracks Ben Carls 02/08/2016 11:35 AM
11668 uBooNE Detector Physics Task New Get ADC to charge conversion from MuCS tracks Ben Carls 02/08/2016 11:36 AM
11669 uBooNE Detector Physics Task New Identify stopping muons Ben Carls 03/16/2016 02:17 PM
11670 uBooNE Detector Physics Task New Hypothesize the Bragg peak and scale measured charge to match Ben Carls 02/08/2016 11:42 AM
11671 uBooNE Detector Physics Task New Look at data from different fields Ben Carls 02/08/2016 11:42 AM
11673 uBooNE Detector Physics Task New Apply lifetime correction to hits Ben Carls 02/08/2016 11:41 AM
11674 uBooNE Detector Physics Task New Look at hit width as a function of time Ben Carls 02/08/2016 11:43 AM
11675 uBooNE Detector Physics Task New Apply space charge correction if necessary Ben Carls 02/08/2016 11:44 AM
11676 uBooNE Detector Physics Task New Understand the double-exponential or exponential behavior Ben Carls 02/11/2016 11:31 AM
11682 uBooNE Detector Physics Task New Apply recombination correction using modified Box model (or Birk's) Ben Carls 02/09/2016 11:38 AM
11683 uBooNE Detector Physics Task New Apply lifetime corrections to hits Ben Carls 02/09/2016 11:41 AM
11684 uBooNE Detector Physics Task New Use ADC to charge conversion Ben Carls 02/09/2016 11:40 AM
11686 uBooNE Detector Physics Task New Create TPC reconstruction algorithm Ben Carls 02/09/2016 11:43 AM
  uBoone Operations 29 Collapse all/Expand all
7695 uBoone Operations Milestone Closed Install Muon Tagger at LArTF Matthew Toups 10/15/2015 02:32 PM
7696 uBoone Operations Necessary Maintenance Closed Check out and test laser-PMT-drift HV interlock box Matthew Toups 05/27/2015 10:07 AM
7699 uBoone Operations Necessary Maintenance Closed Check out the LAr level - drift_HV interlock Matthew Toups 05/14/2015 02:30 PM
7700 uBoone Operations Necessary Maintenance New Specify voltage and supply needed for field cage ring Matthew Toups 01/28/2015 01:58 PM
7702 uBoone Operations Necessary Maintenance Closed Investigate Glassman current monitoring precision Matthew Toups 05/14/2015 02:31 PM
7703 uBoone Operations Necessary Maintenance Closed Repair LAr liquid level probes Matthew Toups 05/14/2015 02:31 PM
8150 uBoone Operations Necessary Maintenance Closed review all our power supply alarm ranges Glenn Horton-Smith 10/02/2015 08:00 PM
8151 uBoone Operations Necessary Maintenance Closed review all crate temperature and fan speed alarm ranges Glenn Horton-Smith 10/02/2015 08:01 PM
8152 uBoone Operations Necessary Maintenance Closed review daq, pc status, and related alarm ranges Glenn Horton-Smith 10/02/2015 08:01 PM
8723 uBoone Operations Necessary Maintenance New Put LArTF network connection on UPS Matthew Toups 05/14/2015 02:38 PM
8725 uBoone Operations Necessary Maintenance New Determine operational requirements for TPC flange FT heaters Matthew Toups 05/12/2015 02:21 PM
(3176-3200/3362) Per page: 25, 50, 100, 5000

Also available in: Atom CSV PDF