Project

General

Profile

Unassigned Issues

Apply Clear

# Project Tracker Status Subject Author Updated
  uBooNE Detector Physics 23 Collapse all/Expand all
11682 uBooNE Detector Physics Task New Apply recombination correction using modified Box model (or Birk's) Ben Carls 02/09/2016 11:38 AM
11673 uBooNE Detector Physics Task New Apply lifetime correction to hits Ben Carls 02/08/2016 11:41 AM
11683 uBooNE Detector Physics Task New Apply lifetime corrections to hits Ben Carls 02/09/2016 11:41 AM
9930 uBooNE Detector Physics Task Assigned Production TPC pedestal determination Herbert Greenlee 02/22/2016 01:59 PM
9927 uBooNE Detector Physics Task New Identify through-going cosmics Herbert Greenlee 02/22/2016 02:00 PM
9928 uBooNE Detector Physics Task New Identify stopping cosmics Herbert Greenlee 02/22/2016 02:00 PM
10515 uBooNE Detector Physics Task New Special Laser and Cosmic Runs at 50kV, 60kV Jyoti Joshi 02/08/2016 11:03 AM
10540 uBooNE Detector Physics Milestone Assigned Space Charge Measurement Paper Jyoti Joshi 02/22/2016 02:00 PM
10526 uBooNE Detector Physics Task New Laser+Cosmics calibration methods Jyoti Joshi 02/08/2016 10:51 AM
9898 uBooNE Detector Physics Milestone New Purity Paper Michael Weber 02/08/2016 11:05 AM
9904 uBooNE Detector Physics Milestone Assigned Diffusion paper Michael Weber 02/22/2016 01:58 PM
9900 uBooNE Detector Physics Milestone New Cosmic rate paper Michael Weber 02/08/2016 11:08 AM
  uBoone Operations 29 Collapse all/Expand all
8152 uBoone Operations Necessary Maintenance Closed review daq, pc status, and related alarm ranges Glenn Horton-Smith 10/02/2015 08:01 PM
8150 uBoone Operations Necessary Maintenance Closed review all our power supply alarm ranges Glenn Horton-Smith 10/02/2015 08:00 PM
8151 uBoone Operations Necessary Maintenance Closed review all crate temperature and fan speed alarm ranges Glenn Horton-Smith 10/02/2015 08:01 PM
9082 uBoone Operations Feature New Improvements to Alarm Area Panel and Alarm Tree for improved status visibility Glenn Horton-Smith 06/09/2015 03:41 PM
8742 uBoone Operations Necessary Maintenance New Write up summary and conclusions from remote viewing inside cryostat Matthew Toups 05/12/2015 03:03 PM
7700 uBoone Operations Necessary Maintenance New Specify voltage and supply needed for field cage ring Matthew Toups 01/28/2015 01:58 PM
8753 uBoone Operations Necessary Maintenance New Spare Wiener PL508 power supplies need to be load-tested Matthew Toups 05/12/2015 03:15 PM
7703 uBoone Operations Necessary Maintenance Closed Repair LAr liquid level probes Matthew Toups 05/14/2015 02:31 PM
8739 uBoone Operations Necessary Maintenance New Remove HV filter boxes from back of MPod Matthew Toups 05/12/2015 02:57 PM
8767 uBoone Operations Necessary Maintenance New Relabel uboonedaq-seb-02 Matthew Toups 05/12/2015 05:44 PM
8723 uBoone Operations Necessary Maintenance New Put LArTF network connection on UPS Matthew Toups 05/14/2015 02:38 PM
8735 uBoone Operations Necessary Maintenance New MPod LV modules need to be labelled Matthew Toups 05/12/2015 02:49 PM
8757 uBoone Operations Necessary Maintenance New Mpod LV module need to be tested Matthew Toups 05/12/2015 03:25 PM
(3176-3200/3360) Per page: 25, 50, 100, 5000

Also available in: Atom CSV PDF