Project

General

Profile

Unassigned Issues

Apply Clear

# Project Tracker Status Subject Author Updated
  uBooNE Detector Physics 23 Collapse all/Expand all
11669 uBooNE Detector Physics Task New Identify stopping muons Ben Carls 03/16/2016 02:17 PM
  uBoone Operations 29 Collapse all/Expand all
7700 uBoone Operations Necessary Maintenance New Specify voltage and supply needed for field cage ring Matthew Toups 01/28/2015 01:58 PM
8725 uBoone Operations Necessary Maintenance New Determine operational requirements for TPC flange FT heaters Matthew Toups 05/12/2015 02:21 PM
8735 uBoone Operations Necessary Maintenance New MPod LV modules need to be labelled Matthew Toups 05/12/2015 02:49 PM
8736 uBoone Operations Necessary Maintenance New MPod HV modules need to be labelled Matthew Toups 05/12/2015 02:50 PM
8738 uBoone Operations Necessary Maintenance New Develop Cryo Display in ROC-W Matthew Toups 05/12/2015 02:54 PM
8739 uBoone Operations Necessary Maintenance New Remove HV filter boxes from back of MPod Matthew Toups 05/12/2015 02:57 PM
8742 uBoone Operations Necessary Maintenance New Write up summary and conclusions from remote viewing inside cryostat Matthew Toups 05/12/2015 03:03 PM
8753 uBoone Operations Necessary Maintenance New Spare Wiener PL508 power supplies need to be load-tested Matthew Toups 05/12/2015 03:15 PM
8756 uBoone Operations Necessary Maintenance New MPod HV modules need to be tested Matthew Toups 05/12/2015 03:20 PM
8757 uBoone Operations Necessary Maintenance New Mpod LV module need to be tested Matthew Toups 05/12/2015 03:25 PM
8758 uBoone Operations Necessary Maintenance New Decision about separating Mpod HV and LV modules into different crates Matthew Toups 05/12/2015 03:31 PM
8759 uBoone Operations Necessary Maintenance New Lexan cover installed over NIM bin in DAQ room Matthew Toups 05/12/2015 03:32 PM
8767 uBoone Operations Necessary Maintenance New Relabel uboonedaq-seb-02 Matthew Toups 05/12/2015 05:44 PM
7699 uBoone Operations Necessary Maintenance Closed Check out the LAr level - drift_HV interlock Matthew Toups 05/14/2015 02:30 PM
7702 uBoone Operations Necessary Maintenance Closed Investigate Glassman current monitoring precision Matthew Toups 05/14/2015 02:31 PM
7703 uBoone Operations Necessary Maintenance Closed Repair LAr liquid level probes Matthew Toups 05/14/2015 02:31 PM
8801 uBoone Operations Necessary Maintenance New Investigate the use of anti-static mats on the platform Matthew Toups 05/14/2015 02:37 PM
8737 uBoone Operations Necessary Maintenance New Hardware history database Matthew Toups 05/14/2015 02:37 PM
8723 uBoone Operations Necessary Maintenance New Put LArTF network connection on UPS Matthew Toups 05/14/2015 02:38 PM
7696 uBoone Operations Necessary Maintenance Closed Check out and test laser-PMT-drift HV interlock box Matthew Toups 05/27/2015 10:07 AM
9002 uBoone Operations Necessary Maintenance New Submit EDR, get appoval Taritree Wongjirad 06/02/2015 05:43 AM
9082 uBoone Operations Feature New Improvements to Alarm Area Panel and Alarm Tree for improved status visibility Glenn Horton-Smith 06/09/2015 03:41 PM
9653 uBoone Operations Feature New Install more powerful fan pack from PMT HV crate Matthew Toups 07/16/2015 03:45 PM
8150 uBoone Operations Necessary Maintenance Closed review all our power supply alarm ranges Glenn Horton-Smith 10/02/2015 08:00 PM
(3151-3175/3323) Per page: 25, 50, 100, 5000

Also available in: Atom CSV PDF