  uBooNE Detector Physics 23 Collapse all/Expand all
11682 uBooNE Detector Physics Task New Apply recombination correction using modified Box model (or Birk's) Ben Carls 02/09/2016 11:38 AM
11670 uBooNE Detector Physics Task New Hypothesize the Bragg peak and scale measured charge to match Ben Carls 02/08/2016 11:42 AM
9930 uBooNE Detector Physics Task Assigned Production TPC pedestal determination Herbert Greenlee 02/22/2016 01:59 PM
  uBoone Operations 29 Collapse all/Expand all
9082 uBoone Operations Feature New Improvements to Alarm Area Panel and Alarm Tree for improved status visibility Glenn Horton-Smith 06/09/2015 03:41 PM
9653 uBoone Operations Feature New Install more powerful fan pack from PMT HV crate Matthew Toups 07/16/2015 03:45 PM
7695 uBoone Operations Milestone Closed Install Muon Tagger at LArTF Matthew Toups 10/15/2015 02:32 PM
8801 uBoone Operations Necessary Maintenance New Investigate the use of anti-static mats on the platform Matthew Toups 05/14/2015 02:37 PM
8742 uBoone Operations Necessary Maintenance New Write up summary and conclusions from remote viewing inside cryostat Matthew Toups 05/12/2015 03:03 PM
8739 uBoone Operations Necessary Maintenance New Remove HV filter boxes from back of MPod Matthew Toups 05/12/2015 02:57 PM
8737 uBoone Operations Necessary Maintenance New Hardware history database Matthew Toups 05/14/2015 02:37 PM
8738 uBoone Operations Necessary Maintenance New Develop Cryo Display in ROC-W Matthew Toups 05/12/2015 02:54 PM
8767 uBoone Operations Necessary Maintenance New Relabel uboonedaq-seb-02 Matthew Toups 05/12/2015 05:44 PM
8736 uBoone Operations Necessary Maintenance New MPod HV modules need to be labelled Matthew Toups 05/12/2015 02:50 PM
8735 uBoone Operations Necessary Maintenance New MPod LV modules need to be labelled Matthew Toups 05/12/2015 02:49 PM
8757 uBoone Operations Necessary Maintenance New Mpod LV module need to be tested Matthew Toups 05/12/2015 03:25 PM
8759 uBoone Operations Necessary Maintenance New Lexan cover installed over NIM bin in DAQ room Matthew Toups 05/12/2015 03:32 PM
8756 uBoone Operations Necessary Maintenance New MPod HV modules need to be tested Matthew Toups 05/12/2015 03:20 PM
8758 uBoone Operations Necessary Maintenance New Decision about separating Mpod HV and LV modules into different crates Matthew Toups 05/12/2015 03:31 PM
9002 uBoone Operations Necessary Maintenance New Submit EDR, get appoval Taritree Wongjirad 06/02/2015 05:43 AM
8725 uBoone Operations Necessary Maintenance New Determine operational requirements for TPC flange FT heaters Matthew Toups 05/12/2015 02:21 PM
8753 uBoone Operations Necessary Maintenance New Spare Wiener PL508 power supplies need to be load-tested Matthew Toups 05/12/2015 03:15 PM
8723 uBoone Operations Necessary Maintenance New Put LArTF network connection on UPS Matthew Toups 05/14/2015 02:38 PM
7700 uBoone Operations Necessary Maintenance New Specify voltage and supply needed for field cage ring Matthew Toups 01/28/2015 01:58 PM
7696 uBoone Operations Necessary Maintenance Closed Check out and test laser-PMT-drift HV interlock box Matthew Toups 05/27/2015 10:07 AM
8152 uBoone Operations Necessary Maintenance Closed review daq, pc status, and related alarm ranges Glenn Horton-Smith 10/02/2015 08:01 PM