# Project Tracker Status Priority Subject Assignee Updated
21845 LArSoft Support Closed High Request for build of pytorch 1.0 accessible within LArSoft for MicroBooNE's MCC9 candidate release Christopher Green 03/11/2019 10:26 AM
9653 uBoone Operations Feature New Normal Install more powerful fan pack from PMT HV crate 07/16/2015 03:45 PM
8802 uBoone Operations Necessary Maintenance New High Investigate separation of test stand NIM logic and beam timing NIM logic in DAQ room Georgia Karagiorgi 05/14/2015 02:43 PM
8801 uBoone Operations Necessary Maintenance New High Investigate the use of anti-static mats on the platform 05/14/2015 02:37 PM
8800 uBoone Operations Necessary Maintenance New High Investigate and eliminate source of zig zag noise in the detector Tia Miceli 05/14/2015 03:22 PM
8799 uBoone Operations Necessary Maintenance New Normal Understand operations of liquid level probes Tia Miceli 05/14/2015 03:22 PM
8767 uBoone Operations Necessary Maintenance New Normal Relabel uboonedaq-seb-02 05/12/2015 05:44 PM
8766 uBoone Operations Necessary Maintenance Resolved High Review beam trigger logic at LArTF Georgia Karagiorgi 10/09/2015 07:06 AM
8764 uBoone Operations Necessary Maintenance New Normal Determine detailed samples to be taken with muon counter system Matthew Bass 05/12/2015 03:45 PM
8763 uBoone Operations Necessary Maintenance Resolved High Determine how PMT system will be read out in conjunction with muon telescope Taritree Wongjirad 10/09/2015 07:07 AM
8762 uBoone Operations Necessary Maintenance New Normal Populate PMT system NIM bin with appropriate modules Taritree Wongjirad 05/12/2015 03:42 PM
8761 uBoone Operations Necessary Maintenance Resolved High Develop slow monitoring of drift HV current and voltage read back Sowjanya Gollapinni 10/09/2015 07:08 AM
8760 uBoone Operations Necessary Maintenance Closed Normal Re-label TPC warm cables Anne Schukraft 10/15/2015 02:28 PM
8759 uBoone Operations Necessary Maintenance New Normal Lexan cover installed over NIM bin in DAQ room 05/12/2015 03:32 PM
8758 uBoone Operations Necessary Maintenance New Normal Decision about separating Mpod HV and LV modules into different crates 05/12/2015 03:31 PM
8757 uBoone Operations Necessary Maintenance New Normal Mpod LV module need to be tested 05/12/2015 03:25 PM
8756 uBoone Operations Necessary Maintenance New Normal MPod HV modules need to be tested 05/12/2015 03:20 PM
8753 uBoone Operations Necessary Maintenance New Normal Spare Wiener PL508 power supplies need to be load-tested 05/12/2015 03:15 PM
8751 uBoone Operations Necessary Maintenance Closed Normal Connections to downstream purity monitor and purity monitor rack 1 Ben Carls 02/08/2016 10:36 AM
8750 uBoone Operations Necessary Maintenance Closed Normal Connections to upstream purity monitor and purity monitor rack 2 Ben Carls 02/08/2016 10:35 AM
8749 uBoone Operations Necessary Maintenance Closed Normal Controlled access to drift HV rack Sarah Lockwitz 05/18/2015 10:35 AM
8748 uBoone Operations Necessary Maintenance Accepted Normal Drift HV cable flange needs to be secured Sarah Lockwitz 06/02/2015 10:44 AM
8747 uBoone Operations Necessary Maintenance New Normal Establish final length of HV drift cable Sarah Lockwitz 05/12/2015 03:08 PM
8746 uBoone Operations Necessary Maintenance New Normal Connect HV drift cable from cryostat to filter pot Sarah Lockwitz 05/12/2015 03:07 PM
8745 uBoone Operations Necessary Maintenance New Normal Connect PMT HV cables to PMT HV modules Taritree Wongjirad 05/12/2015 03:05 PM
(1-25/67) Per page: 25, 50, 100