10509 ANNIE1-electronics-design Task Assigned Normal Attach bulkhead connectors and pcb mounting hardware Jonathan Eisch 04/06/2016 11:13 PM
10543 ANNIE1-electronics-design Task Resolved Normal Check availability of local timing references Jonathan Eisch 11/02/2015 01:31 PM
9086 ANNIE1-electronics-design Task Assigned Normal Contact Zarko Pavlovic about beam timing signals. Jonathan Eisch 06/10/2015 10:48 AM
10457 ANNIE1-electronics-design Task Assigned Normal Design and build full sized pickoff/splitter board Jonathan Eisch 01/12/2016 03:07 PM
8813 ANNIE1-electronics-design Task Assigned Normal Design for clock distribution and timing Jonathan Eisch 01/25/2018 07:15 AM
10534 ANNIE1-electronics-design Task Assigned Normal Determine GPS antenna location at ANNIE Hall Jonathan Eisch 01/25/2018 07:17 AM
10533 ANNIE1-electronics-design Task Assigned Normal Determine the suitability of GPS timing reference Jonathan Eisch 01/25/2018 07:17 AM
10440 ANNIE1-electronics-design Task Assigned Normal Externally trigger ADC cards Jonathan Eisch 01/25/2018 07:14 AM
8811 ANNIE1-electronics-design Task Resolved Normal Figure out the data rates and size of output from the system Jonathan Eisch 10/22/2015 01:38 PM
10461 ANNIE1-electronics-design Task Resolved Normal Full sized pickoff/splitter board population Jonathan Eisch 01/12/2016 03:07 PM
8808 ANNIE1-electronics-design Task New Normal Get details of what we can get from the beam spill and timing Jonathan Eisch 06/10/2015 10:48 AM
10449 ANNIE1-electronics-design Task Assigned Normal HV pickoff & signal splitter Jonathan Eisch 04/06/2016 11:14 PM
10463 ANNIE1-electronics-design Task Assigned Normal HV pickoff/splitter enclosure Jonathan Eisch 04/06/2016 11:13 PM
10470 ANNIE1-electronics-design Task Resolved Normal Machine pickoff/splitter enclosure Jonathan Eisch 01/12/2016 03:05 PM
10443 ANNIE1-electronics-design Task Assigned Normal Make readout methods (to be used by artdaq) Jonathan Eisch 01/25/2018 07:16 AM
10510 ANNIE1-electronics-design Task Assigned Normal Mount pickoff/splitter pcb in enclosure, solder wires to bulkhead connectors Jonathan Eisch 04/06/2016 11:09 PM
10468 ANNIE1-electronics-design Task Assigned Normal Pickoff/splitter enclosure production Jonathan Eisch 04/06/2016 11:13 PM
10535 ANNIE1-electronics-design Task New Normal Select and buy a suitable GPS receiver Jonathan Eisch 01/25/2018 07:16 AM
10532 ANNIE1-electronics-design Task Assigned Normal Select timing sources Jonathan Eisch 01/25/2018 07:17 AM
10456 ANNIE1-electronics-design Task Resolved Normal Test HV resilliance up to 3kV Jonathan Eisch 10/12/2015 02:40 PM
10442 ANNIE1-electronics-design Task Resolved Normal Throughput testing for ADC cards Jonathan Eisch 10/22/2015 01:40 PM
10530 ANNIE1-electronics-design Task Assigned Normal Timing distribution system Jonathan Eisch 01/25/2018 07:17 AM
9089 ANNIE1-electronics-design Task Assigned Normal UC ADC cards Jonathan Eisch 01/25/2018 07:16 AM
9090 ANNIE1-electronics-design Feature Assigned Normal UC ADC user manual Jonathan Eisch 01/25/2018 07:14 AM
    (1-24/24)