Necessary Maintenance #8722

Load-balance current draw from sebs in DAQ room at LArTF

Added by Matthew Toups over 4 years ago.

Status:
Assigned
Priority:
Normal
Category:
-
Start date:
05/12/2015
Due date:
% Done:

0%

Estimated time:
Duration:

Description

An additional PDU and UPS were purchased to distribute the load from the SEBs in the first readout rack in the DAQ room at LArTF. The PDU has been temporarily installed and half of the power supplies that were connect to one of the two PDUs that were already installed were moved to it. The UPS now needs to be installed and the loads distributed according to the operating ranges of the PDUs and UPSs.