Project

General

Profile

Task #24825

Timing System / MEBT Chppoer / Booster LLRF block diagram and timeline development

Added by Ed Cullerton 2 months ago. Updated 2 months ago.

Status:
Assigned
Priority:
Normal
Assignee:
Start date:
08/19/2020
Due date:
% Done:

0%

Estimated time:
Duration:

Description

We can track the block diagram and time line on this ticket.

Features of the current block diagram and timeline include:

1. The control system will provide injection frequency information to the chopper. This is a slow loop (min/days). May be based on a time of flight measurement?
2. The Booster LLRF system will detect the frequency of the RF signal sent from the chopper each cycle, and then program the frequency table accordingly on the next cycle There will be a one cycle delay in chopper/booster sync.

History

#1 Updated by Ed Cullerton 2 months ago

The times on the timeline are rough estimates. If anyone has better estimates, I can add them as we go.

#2 Updated by Ed Cullerton 2 months ago

I combined the block diagram and the timeline to make document tracking easier.

#3 Updated by Ed Cullerton 2 months ago

Attached the meeting notes for 11/1/19 and the latest meeting 8/26/20.

An updated block diagram/timeline with suggested changes will be made soon.

Also available in: Atom PDF