Project

General

Profile

Milestone #24740

Ready for RF testing and calibration

Added by Brian Chase 3 months ago.

Status:
New
Priority:
Normal
Assignee:
Category:
-
Start date:
08/10/2020
Due date:
% Done:

0%

Estimated time:
Duration:

Description

We need to get the LLRF system in a state that is ready for powering and testing the RF system.

Add 8 or 10 dB pads to the drive.

Validate RF drive with SA before we turn on the SSAs.

Check out basic RFPI gate control.

Sign off before any RF power is driven to the cavity. Sign off on travelers.



Also available in: Atom PDF