Task #24584
HWR startup procedure
Start date:
07/01/2020
Due date:
% Done:
0%
Estimated time:
Description
We need a consistent process for bringing up a cavity and RF system.
1) All code and functionality must be verified in the lab. We cannot use a $100 M accelerator to test code on.
2) RF functionality is checked with a spectrum analyzer BEFORE the SSAs are turned on.
3) A power meter with the proper cal for the station is hooked up to the SSA monitor point.
4) A 10 dB pad is placed in the drive line.