Project

General

Profile

Task #24523

HWR 8 Channel Signal Conditioning Chassis

Added by Daniel Klepec 5 months ago. Updated 3 months ago.

Status:
Resolved
Priority:
Normal
Assignee:
Start date:
06/09/2020
Due date:
% Done:

100%

Estimated time:
16.00 h
Spent time:
Duration:

Description

Test results and photos are attached

Board Test Results.docx (2.28 MB) Board Test Results.docx Daniel Klepec, 06/09/2020 11:26 AM
testing results.xlsx (11.5 KB) testing results.xlsx Daniel Klepec, 07/21/2020 02:20 PM
testing results.xlsx (45.2 KB) testing results.xlsx Daniel Klepec, 07/23/2020 11:44 AM
testing results.xlsx (45.2 KB) testing results.xlsx Daniel Klepec, 07/27/2020 03:33 PM
testing results_7_27_20.xlsx (45.8 KB) testing results_7_27_20.xlsx Daniel Klepec, 07/27/2020 03:40 PM

History

#1 Updated by Daniel Klepec 3 months ago

Test results were conducted by Philip and I in the Lab. Attached are the results.

#2 Updated by Philip Varghese 3 months ago

  • Estimated time set to 16.00 h

The 8 cavity signal conditioning chassis testing is complete. The pressure transducer
signal's dynamic range was corrected to match the ADC's full range.
The chassis is ready for installation at CMTF.

#3 Updated by Daniel Klepec 3 months ago

The corrected dynamic range modification and final test results shown in new results document.

#4 Updated by Daniel Klepec 3 months ago

Updated with resistor value for R4 = 1.21K. 7/27/20

#6 Updated by Daniel Klepec 3 months ago

  • % Done changed from 90 to 100
  • Status changed from Work in progress to Resolved

Philip installed on 7/31/20



Also available in: Atom PDF