Task #24523
HWR 8 Channel Signal Conditioning Chassis
Description
Test results and photos are attached
History
#1 Updated by Daniel Klepec 6 months ago
- Status changed from New to Work in progress
- File testing results.xlsx testing results.xlsx added
Test results were conducted by Philip and I in the Lab. Attached are the results.
#2 Updated by Philip Varghese 6 months ago
- Estimated time set to 16.00 h
The 8 cavity signal conditioning chassis testing is complete. The pressure transducer
signal's dynamic range was corrected to match the ADC's full range.
The chassis is ready for installation at CMTF.
#3 Updated by Daniel Klepec 6 months ago
- File testing results.xlsx testing results.xlsx added
The corrected dynamic range modification and final test results shown in new results document.
#4 Updated by Daniel Klepec 6 months ago
- File testing results.xlsx testing results.xlsx added
Updated with resistor value for R4 = 1.21K. 7/27/20
#5 Updated by Daniel Klepec 6 months ago
#6 Updated by Daniel Klepec 5 months ago
- % Done changed from 90 to 100
- Status changed from Work in progress to Resolved
Philip installed on 7/31/20