Description

Testing of the slow tuner system for HWR has started. The valves and transducers
were exercised with manual controls and the stage 1 tuner hardware configuration.
The tuning range was measured for a couple of cavities. 7 of the 8 cavities have
been tested so far. An analog pressure regulation
loop available with the stage 1 hardware was also tested for all the cavities.
Cavity 8 is awaiting some connector parts for the tuner cable.
Initial test data is attached.

HWR Slow Tuner Measurements_03_03_20.docx (15.8 KB) HWR Slow Tuner Measurements_03_03_20.docx Philip Varghese, 03/05/2020 06:14 PM
HWR_Tuning_Range.png (407 KB) HWR_Tuning_Range.png Philip Varghese, 03/16/2020 04:56 PM
HWR Slow Tuner Measurements_03_13_20.docx (20.8 KB) HWR Slow Tuner Measurements_03_13_20.docx Philip Varghese, 03/16/2020 04:56 PM

History

#1 Updated by Philip Varghese 9 months ago

Tuning range measurements were completed on cavity 7 and 8. The full measurement data for all
8 cavities is attached.