Milestone #24068

HWR Slow Tuner Installation

Added by Philip Varghese 7 months ago.

Status:
New
Priority:
Normal
Start date:
02/19/2020
Due date:
% Done:

50%

Estimated time:
4.00 h
Duration:

Description

The slow tuner hardware for HWR has been installed in the HWR rack at CMTF.
The hardware consists of the the slow tuner from Argonne and a Signal Conditioning/PS
chassis as shown in the stage 1 configuration diagram. The current configuration
will allow the tuning control of one cavity at a time for all eight cavities. The Labview interface,
the front-end software and the firmware have all been updated to support slow tuner operation.
As testing progresses, the stage 2 signal conditioning block assembly will be completed.

IMG_0044.JPG (4.05 MB) IMG_0044.JPG Slow tuner and Signal conditioning block Philip Varghese, 02/19/2020 04:25 PM
IMG_0047.JPG (2.39 MB) IMG_0047.JPG HWR Station Rack complete Philip Varghese, 02/19/2020 04:26 PM