Project

General

Profile

Task #22489

RF chassis prototype

Added by Ed Cullerton about 2 months ago.

Status:
Assigned
Priority:
Normal
Assignee:
Start date:
05/01/2019
Due date:
% Done:

0%

Estimated time:
80.00 h
Duration:

Description

The RF chassis needs to be prototyped (see block diagram ticket 21910)

A system design review will be done before moving forward with this task.



Also available in: Atom PDF