Task #10449

HV pickoff & signal splitter

Added by Jonathan Eisch almost 4 years ago. Updated over 3 years ago.

Status:
Assigned
Priority:
Normal
Start date:
09/14/2015
Due date:
01/22/2016
% Done:

100%

Estimated time:
(Total: 26.00 h)
Spent time:
(Total: 4.40 h)
Duration: 131

Subtasks

Task #10450: Design and build prototypeClosedJonathan Eisch

Task #10451: board designClosedJonathan Eisch

Task #10452: pickoff prototype board productionClosedJonathan Eisch

Task #10453: pickoff prototype board populationClosedJonathan Eisch

Task #10454: Test prototype pickoff boardClosedJonathan Eisch

Task #10455: Test AC characteristics without HVClosedJonathan Eisch

Task #10456: Test HV resilliance up to 3kVResolvedJonathan Eisch

Task #10457: Design and build full sized pickoff/splitter boardAssignedJonathan Eisch

Task #10458: panelize prototype designClosedJonathan Eisch

Task #10459: Verify prototype design with FNAL EE staffClosedJonathan Eisch

Task #10460: Produce full size pickoff/splitter boardClosedJonathan Eisch

Task #10461: Full sized pickoff/splitter board populationResolvedJonathan Eisch

Task #10462: Order components for full-sized pickoff/splitter boardClosedJonathan Eisch

Task #10463: HV pickoff/splitter enclosureAssignedJonathan Eisch

Task #10464: Get FNAL guidelines for HV pickoff/splitterClosedJonathan Eisch

Task #10465: Get FNAL EE staff to signoff on the enclosure designClosed

Task #10466: Get bulkhead connectors for pickoff/splitter enclosureClosedJonathan Eisch

Task #10468: Pickoff/splitter enclosure productionAssignedJonathan Eisch

Task #10469: Order rack enclosureClosed

Task #10470: Machine pickoff/splitter enclosureResolvedJonathan Eisch

Task #10509: Attach bulkhead connectors and pcb mounting hardwareAssignedJonathan Eisch

Task #10510: Mount pickoff/splitter pcb in enclosure, solder wires to bulkhead connectorsAssignedJonathan Eisch

Task #10512: Test final pickoff/splitterNew