Booster:
  • Vacuum leak in MI-8 line still needs to be found
    • will have meeting today to decide when they will do it
  • Want to replace an RF over next several weeks (talk with John Reed)

MI:
  • slipstacking testing
  • Another Septa failed in MI
    • SY is down until repaired

Horn4:
  • Alignment out to do rails with horn.
  • Twist transitions and HPOT
  • Testing in Jan, aiming to align with ComEd powerstation switch

MicroBooNE: