Booster: Studies in plan, rate is 2 Hz (aim 3-4 Hz), linac and booster losses are higher. sitting until August 1 shutdown, no planned downtime

BNB: Will coordinate with uB and ANNIE for when it’s good to do the target scan. Installing rapid trim magnet.

uB Run coordinators: cosmic ray tagger panel installation, used beam down time for laser and calibration runs

Jessie for ANNIE: taking data