Booster: Intensity & rate down over weekend (bunches a little less). Don’t know why yet. June 1 is next down time.

BNB: Flow meter was replaced with another one that is solid state. Water cooling to horn, need a mechanical one, or else it will fail again.

Magnent tests: See if we can steer beam to get off-target/on-target during same cycle.

MITPC: Bill - running fine
ANNIE: Tank filled. Triggering on RWM.

MicroBooNE: tracked down last week’s trigger weirdness to a faulty PS on a PMT.