BNB down tomorrow. Do measurements for SBN modifications.
Septum in NuMI having work done, can run for part of the preparation time.
When switch yard is on we get more reps.

MITPC going, ANNIE got a lot of work, test fitted structure with liner, can move tank to sciboone hall.

MicroBooNE: used to have .4% and 3% trigger inefficiency early last week: we needed to adjust a beam veto window. Uptime more than 98%.

RWM studies.