MicroBooNE - we are ready in less than ~3 weeks (today’s estimate) to fill with LAr
-June 13th uB can begin to monitor beam
-SCD want to average a 1 Hz collection for cosmic. Take as much data as we can before beam is off. Will later ramp cosmics to prepare for beam data close to restart.
-ask Tom K. for the “1D” (1F) beam signal for triggering.
-Resistive wall monitor gives precise timing
-camac limit 100ns resolution
-booster extraction sync = hardwire signal, camac not precise enough. No jitter. Large coax cables run into MB hall.
-